Loading...
HomeMy WebLinkAboutP100_Plumbing Notes Symbols and Schedulesr GENERAL NOTES PLUMBING FIXTURE SCHEDULE PLUMBING SYMBOLS 1. Materials, equipment, and systems shall meet all pertinent requirements of the Underwriters Laboratory (UL), the American ID MANUFACTURER MODEL DESCRIPTION FAUCET/VALVE L W/DIA H MOUNTING HEIGHT DRAIN VENT HW CW NOTES --SW- Cold water piping MC Mechanical Contractor Society for Testing Materials (ASTM), the 2012 Indiana Plumbing Code, ASHRAE 2007, American Water Works Association -9w- Hot water piping GC General Contractor P-1 American Standard 2467.016 Press. Asst. Tank Type Toilet == 31" 22" 31" 17' to dm 3" See Plans == 1/2" 1,2,3,4 National Fire Protection Association (N FPA), and other nationally recognized agencies as well as applicable local 1.4.6.E - tiM Hot water recirculation piping EC Electrical Contractor codes. codes. P-2 American Standard 0356.015 Lavatory 2385.131 19" 21" 8" 34" to top 1-1/2" See Plans 1/2" 1/2" s P-3 By Owner By Owner Hand Sink =_ __ __ __ _= 1-1/2" See Plans 1/2" 1/2" 3.4 Sanitary waste piping PC Plumbing Contractor 2. Bidders shall be licensed contractors in accordance with local and state laws. P-4 By Owner By Owner Kitchen Sink =_ __ __ __ _= 1-1/2" See Plans 1/2" 1/2" 1,3,4 --- -- Vent piping WH water Heater 3. Bidders shall thoroughly acquaint themselves with the conditions under which the work is [o be performed. The shall 9 Y 9 P Y SS Fiat FL-1 Service Sink A-1 23" 22" 34" 34" to top 2" See Plans 1/2" 1/2" 34 Pipe up 01 Numbered note N Pipe down examine all services, equipment, surfaces, etc., which this work Is In any way dependent upon, and bring any discrepancies H-DF Elkay EZSTLBWSLK Ell Level Dunking Fountain w/ Bottle Filler == 19" 36" 52" 33" TO SPOUT 1-1/2" See Plans == 1/2" 7,3,4 Gate Valve UON Unless otherwise noted determined or omissions found in the drawings to the owner's attention before submitting bid. NOTES 'c�br� Ball Valve AFF Above Finished Floor M1N 1) All fixtures with 'H' prefix shall be accessible to the handicapped. 4. All installed systems, devices and related items shall be tested in place on site. Replace any and all contractor supplied BFF Below Finished Floor CO Cleanout defective devices, items or systems at contractor's own expense before completion of the project. 2) Water closet Is floor mounted bottom outlet type, 1.6 gallons per flush, with elongated bowl and open front seat. Trip lever on wide side of stall. NTS Not to scale OF Drinking Fountain 3) Pipe sizes shown are connection sizes only; see plans for pipe run sizes. H- Handicap !� 5. Contractor shall guarantee all work for which materials are furnished, fabricated or field erected, all factory assembled Point of connection equipment for which no specific manufacturer's guarantee is furnished, and all work in connection with installing q All water supply lines to fixtures shall have an accessible shutoff valve inside bldg. ) ppy 9' SS Service Sink manufacturer's guaranteed equipment. This contractor's guarantee shall exist for a period of one (1) year from the date of 5) Provide and install Watts LFSUGB thermostatic mixing valve set to 105 deg F for all lavatories and hand sinks. RP Recirculation Pump VIR Vent Through Roof final owner acceptance of the work and shall apply to defects in material and to defective workmanship of any kind. 6) Provide and install vandal resistant 0.5 gpm aerator for faucet. 6. The systems shown on the drawings shall be provided to serve all fixtures, equipment, and areas within the Contract Limit Lines as set forth by the Architectural solution for the project. Systems shall include all equipment, appurtenances, safety devices, and controls necessary for the intended service. 7. All permits and fees required for the work shall be secured and paid for by the plumbing contractor and included in bid price. WATER HEATER SCHEDULE 8. Anything drawn or specified on these plans shall not be construed to conflict with any local, municipal or state law, regulation or ordinance which governs the Installation of any plumbing or related work. Where any portion of the systems are not installed as in accordance with applicable laws, ordinances, regulations and codes, this contractor shall make all changes ID MFR MODEL DESCRIPTION KW VOLTS GPH Gallons L W/Oia H MTG HT HW CW NOTES required by the enforcing authorities in a manner approved by the owner and without additional cost to the owner. WH-1 A.O Smith DEL-40 Electric Water Heater 9.0 208/3 41 40 == 24" 33" On platform 3/4" 3/4" 1 9. Where job conditions require changes from the contract documents that do not change the scope of installation or nature of ET-1 Antral Therrr X-Tral ST-5 Expansion Tank =_ __ _= 2.0 == 8" 13" On platform 3/4" 2,3 work required, the contactor shall make such changes without additional cost to the owner. No other changes may be made NOTES without written permission of the owner. 1) Recovery is at 90 degrees F rise, unless otherwise noted. 10. All equipment and fixtures shall be new and unused and installed in strict conformance to manufacturer's recommendations. 2) Expansion tank minimum acceptance is 2 gals. Provide fixtures complete with all trim, stops, hangers, carriers, supports, etc. including prevision for the handicapped, if 3) Use air compressor to precharge expansion tanks to match incoming static pressure (verify in field). required. Where fixtures are accessible to the handicapped, fixtures must comply with all federal ADA regulations. 11. Arrange for chases, slots, and openings in other building components to allow for plumbing installations. Coordinate the cutting and patching of building components to accommodate installation of plumbing equipment and materials. PUMP SCHEDULE 12. Do not endanger or damage installed Work through procedures and processes of cutting and patching. Provide repairs required to restore other work, because of damage caused as a result of plumbing installations. ID MFR MODEL DESCRIPTION QTY MOTORS HP VOLTS/PH RPM GPM HEAD LG - W - HT NOTES 13. Coordinate the installation of required supporting devices and sleeves to be set in poured in place concrete and other RP Taco 006 Hot Water Recife Pump 1 1 1/40 115/1 3250 0.5 5' 611x5"x5" 1,2,3 structural components, as they are constructed. 14. Sequence, coordinate, and integrate installations of plumbing materials and equipment for efficient now of the Work. Give OTES: particular attention to large equipment requiring positioning prior to closing -in the building. 1) Stainless steel construction. 2) Pump shall be provided with Aquastat controls to "late in minimum 115 deg F water temperature during occupied hours. 15. Where mounting heights are not detailed or dimensioned, install plumbing services and overhead equipment to provide the 3) Provide and install check valve after pump before to ripe rat ure gauge. maximum headroom possible. 16. Install plumbing equipment to facilitate maintenance and repair or replacement of equipment components. As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. SFU CALCULATIONS 17. Coordinate the installation of plumbing materials and equipment above ceilings with suspension system, light fixtures, ductwork, conduit, and other installations. Coordinate plumbing equipment and materials installation with other building components. 18. All pipes shall be of the size given on the drawings. All piping shall be run true to line. Pipes may be moved, if necessary for SUPPLY FIXTURE UNITS installation, provided that the nature of the system is not changed. All pipes shall be concealed: located above ceiling, below Floor or in walls, except where connection is made to fixture. Fi#ure ID Description QUAN SFU per fixture SFU total code Tal M CW HW Both CW HW Both 19. Coordinate connection of plumbing systems with exterior underground and overhead utilities and services. Comply with P-1 Watercloset, PressAsst Tank, public 2 2.0 0.0 2.0 4.0 0.0 4.0 requirements of governing regulations, franchised service companies, and controlling agencies. Provide required connection for each service. P-2 Lavatory, public 2 1.5 1.5 2.0 3.0 3.0 4.0 Relief Valve P-3 Hand sink, public 10 1.5 1.5 2.0 15.0 15.0 20.0 HW 20. Plumbing service rough -in shall be based on information, drawings, equipment cuts, etc. prepared by the equipment supplier. P-4 Kitchen sink, public 1 3.0 3.0 4.0 3.0 3.0 4.0 CW-> Final plumbing connections shall be made from rough -in to equipment after equipment is set in place. SS Service/Nbpsink, public 1 2.3 2.3 3.0 2.3 2.3 3.0 21. Actual locations and mounting methods for fixtures and penetrations are subject to Architect's approval. All piping is shown H-DF Drinking fountain 2 03 0.0 0.3 0.5 0.0 0.5 Expansion - Tank N schematicallyfor clari coordinate with structure, ducts, lights, utilities, etc. Verif all dimensions b field measurements. ty' 9 Y Y Electric22. All pipes, pumps, control devices, fire protection, and miscellaneous apparatus shall be cleauy marked for easy itlentifcationTOTALS 27.8 23.3 35.5 Water Heaterand safety. Use black plastic or bakelite name plate engraved with white letters 1/4" high. Punched tape is not acceptable. /P Valve 23. The hot and cold water supply line branches for all lavatories, sinks, showers, tubs, and hose blobs shall have ]osam or Zurn 1/2" threaded to water hammer arresters installed on the high point at the end of each branch line. rod structure above DFU CALCULATIONS TYP-4 L T 24. All above -ground water supply piping shall be Type L rigid copper. All below grade water supply piping shall be Type K soft copper with at least 50' between joints. All joints shall be soldered with "lead-free" solder (e.g., 95-5). Drain Valve 25. Flush and sterilize watersystem after connections are madam accordance with local regulations. Sanitary Fixtures Platform Item Fixture Quan. DFU Each DFU Total 11 26. All sanitary waste piping below slab shall be cast-iron or solid -wall PVC. Ocher DWV piping may be cast-iron or galvanized P-1 Water Closet - Tank Type 2 4 8 1" steel angle Drain Pon 1 1' steel. PVC may NOT be used in demising walls and may NOT be used in return plenum ceilings. p-2 Lavatory 2 1 2 bolted to rod Typical 27. All Floor penetrations and all exterior penetrations shall be completely waterproofed, firesafed, and sealed. All pipe P-3 Hand Sink 10 2 20 To mop sink penetrations of fire noted assemblies shall be sleeved and sealed as required to maintain the sting of the assembly. Sleeves P-4 late hen Sink 1 2 2 shall be used for all masonry penetrations. Proper sealing of penetrations as described here is the sole responsibility of the SS Service Sink 1 3 3 plumbing contractor. H- OF Drinking Fountain 2 0.5 1 rT�WATER HEATER DETAIL 28. All domestic water piping, vent piping and gas piping shall run above ceiling, LON. All sanitary and storm piping shall be run Total Sanitary Drainage Fixture Units 36 P700 No Scale under the Floor, UON. Service Size required at 1/8" per foot slope 4" 29. Existing piping shown on drawings Is based on original drawings, and location, mounting heights and points of connection must be verified in field. All piping is new, UON. In general, do not abandon old piping - remove and dispose of properly, unless inaccessible or under slab, or unless noted otherwise. 30. All water piping inside the building thermal envelope shall be insulated with jacketed fiberglass pipe insulation with sealed seams (Owens Corning SSL-II or equal) as follows: Cold water, 1/2" thick insulation; hot water supply and recirculation piping 1.25" tlia and smaller, 1" thick insulation; hot water supply and recirculation piping 1.5" tlia and larger, 1.5" thick insulation. 31. In general, no hot and cold water supply piping shall be run on cold side of insulation in outside walls, crawl space, attic, or other unheated spaces. However, if domestic cold or hot piping is discovered to be routed through unheated areas, heat trace and insulate this piping with 2" minimum jacketed fiberglass pipe insulation with sealed seams to prevent freezing. FIRE PROTECTION NOTES 32. All sanitary sewer traps that are located outside the building thermal envelope in unheated areas shall be heat traced and insulated with 1" fiberglass minimum to prevent freezing. All heat tracing shall be controlled with a sensor on the coldest portion of the piping and set to turn on if pipe temperature drops below 45F. 33. Provide and install LavGuand by Truebro, Inc. ADA compliant, vinyl coated with standard white finish, foam insulation on all 1. All fire protection systems shall be in accordance with NFPA regulations, and all local codes, including the requirements for exposed plumbing waste and supply connectors underneath all lavatories. If there are any instant water heaters, transformers for hands -free devices, or any other sharp or abrasive objects under lavatory, provide and install full lavatory backFlow protection. shield (LavShield by Truebro, Inc. or equal), maintaining ADA required clearances under all lavatories. 2. Building shall be fully sprinklered. 34. All interior horizontal and vertical storm and overflow piping, above slab, shall be insulated with 1" Owens Corning SSL-II 3. Tenant space shall be fully sprinklered using the existing sprinkler system. Sprinkler contractor shall prepare a fire jacketed fiberglass pipe insulation with sealed seams. suppression Ian showing a sizing, heads, hydraulic calculations, etc, for approval b fire marshal. No sprinkler work shall PP P 9 pipe 9. Y PP Y 35. All horizontal branches and vents 3" in diameter and over shall be sloped at 1/8" per foot minimum, unless otherwise noted. commence prior to obtaining approval of these drawings by fire marshal. All horizontal branches and vents under 3" in diameter shall be sloped at 1/4" per foot minimum, unless otherwise noted 4. Sprinkler In shall be coordinated with ductwork, lights, structure and other In The sprinkler contractor shall have the P piping 9 piping. P (UON). responsibility for this coordination with other disciplines. 36. Plumbing contractor shall furnish record set of drawings with any deviations marked in red ink, within 90 days of system S. Sprinkler heads shall be centered in the ceiling tiles. acceptance. 37. ALL submittals MUST be sent in pdf format, highlighted or reclined to indicate product full model number, including suffix and RELEASED FOR CONSTRUCTION to the Architect Subject to compliance with all regulations of State and Local Codes City of Carmel I 11,, a._.,tnKti....a"_.1) 117 . DATE: 09/17/19 C HA CRAIG BENNETT ASSOCIATES ARCHITECTS TENANT MY EYE DR 1950 OLD GALLOWS RD SUITE 520 VIENNA, VIRGINIA 20182 703-847-8899 FAX 866-414-6476 Contact: Suzanne Berardi -Gould 571-455-8191 ARCHITECT: CBA ARCHITECTS, PC 1239 PINE HILL ROAD McLEAN, VIRGINIA 22101 703-847-6900 FAX 847-6955 www.cba-urchiiecis.com Contact: Craig Bennett cbenneit@cba-architecis.com 703-975-2400 MEP ENGINEER: DWYER ENGINEERING 552 FORT EVANS ROAD NE, #200 LEESBURG, VIRGINIA 20176 703-777-5988 FAX 703-439-2588 www.dwyer.com Contact: Brian Davis BDavisiddwyer.com 703-777-5988 EXT. 110 MY EYE DR SHOPPES ON MAIN SOUTHWEST CORNER OF MAIN ST & GRAND AVE CARMEL, INDIANA For Permit 07/18/19 For Review 07/03/19 ,oruiin�rr,r „' 44TEq No. 11 0 0 - y' SA O nu Wa veiv ads PLUMBING N& SC�HEDULBEOSS SHEET P100