Loading...
HomeMy WebLinkAboutS000.3BTYPICAL GABLE END DETAILSCALE: 3/4"=1'-0" 2x EXTERIOR \PSHEAR WALL\P- SEE PLAN & SPECIFICATIONS FASTEN BOTTOM CHORD OF GABLE END TRUSS TO DBL. TOP PLATE w/ 12d NAILS @ 8" O.C. GABLE END TRUSS SHEATHED W/ OSB/PLYWOOD FLOOR SYSTEM\P(SEE PLANS) 2x P.T. SILL PLATE\A1;{\H0.7x;\S1#2;\H1.429x;" DIA. ANCHOR BOLTS @ 6'-0" O.C. MAX. (OR EQUIVALENT ANCHOR STRAPS)} SCALE: 3/4"=1'-0"{\Farchtitl.shx;TYPICAL SHEAR TRANSFER DETAIL @ EXTERIOR BASEMENT WALL}D FASTEN SHEATHING TO SILL PLATE PER EXT. WALL/ SHEATHING EDGE NAILING REQUIREMENTS (SEE PLANS) FASTEN SOLE PLATE TO RIM BOARD w/ 12d NAILS @ 6" O.C. RIM BOARD FASTENED TO SOLE PLATE w/ 12d TOENAILS @ 6" O.C. CTYPICAL SHEAR TRANSFER DETAIL BETWEEN FLOORS @ EXTERIOR WALLSCALE: 3/4"=1'-0" 2x EXTERIOR SHEAR WALL 2x EXTERIOR SHEAR WALL (SEE PLANS)FLOOR SYSTEM\P(SEE PLANS) RIM BOARD FASTENED TO DBL. TOP PLATE w/ 12d TOENAILS @ 6" O.C. FASTEN SOLE PLATE TO RIM BOARD w/ 12d NAILS @ 6" O.C. FOUNDATION WALL\P(SEE PLANS) 2x P.T. SILL PLATE (SEE PLANS) \A1;{\H0.7x;\S1#2;\H1.429x;" DIA. ANCHOR BOLTS @ 6'-0" O.C. MAX. (OR EQUIVALENT ANCHOR STRAPS)} SCALE: 3/4"=1'-0"TYPICAL SHEAR TRANSFER DETAIL @ EXTERIOR GARAGE WALLE FASTEN SHEATHING TO SILL PLATE PER EXT. WALL/ SHEATHING EDGE NAILING REQUIREMENTS (SEE PLANS) FOUNDATION WALL\P(SEE PLANS) GARAGE SLAB (SEE PLANS) 2x EXTERIOR SHEAR WALLPROVIDE GABLE END BRACING PER TRUSS MANUFACTURER SCALE: 3/4"=1'-0"TYPICAL SHEAR\PTRANSFER DETAIL @ ROOFA2 \A1;9 1/2"\A1;TO 16" \A1;2x10 (9 {\H0.7x;\S1#2;}" - 12" HEEL) OR 2x12 (12" - 16" HEEL) SOLID BLOCKING PANELS EVERY 3RD TRUSS BAY (72" O.C. MAX) FASTEN EA. BLOCKING PANEL TO TOP PLATE w/ (4) 12d TOENAILS 2x EXTERIOR\PSHEAR WALL\P- SEE PLAN & SPECIFICATIONS SCALE: 3/4"=1'-0"TYPICAL SHEAR\PTRANSFER DETAIL @ ROOFA1 \A1;HEEL HEIGHT LESS THAN 9 {\H0.7x;\S1#2;}"\PNO BLOCKING REQ'D \A1;9 1/2"\A1;MAX. SCALE: 3/4"=1'-0"TYPICAL SHEAR TRANSFER DETAIL @ RAISED HEEL TRUSSA3 OSB/PLYWOOD SHEATHING UP VERTICALS OF ROOF TRUSSES, & FASTEN w/ 8d @ 6" O.C. 2x EXTERIOR\PSHEAR WALL\P- SEE PLAN & SPECIFICATIONS 2x EXTERIOR\PSHEAR WALL\P- SEE PLAN & SPECIFICATIONS \A1;FASTEN ROOF TRUSS TO TOP PLATE OF WALL WITH (3) 12d TOENAILS (0.131" x 3{\H0.7x;\S1#4;}" LONG NAIL) \A1;HEEL HEIGHT BETWEEN 9 {\H0.7x;\S1#2;}" - 16"\PBLOCKING REQ'D HEEL HEIGHT UP TO 24" MAX. \A1;9 1/2"\A1;TO 24" MAX. \A1;BLOCKING MUST FIT TIGHT BETWEEN TRUSSES.\PFASTEN EA. END OF BLOCKING TO TRUSS w/(2) 12d TOENAILS @ TOP OF PANEL \A1;FASTEN ROOF TRUSS TO TOP PLATE OF WALL WITH (3) 12d TOENAILS (0.131" x 3{\H0.7x;\S1#4;}" LONG NAIL)\A1;FASTEN ROOF TRUSS TO TOP PLATE OF WALL WITH (3) 12d TOENAILS (0.131" x 3{\H0.7x;\S1#4;}" LONG NAIL) \A1;1 {\H0.7x;\S1#2;}" MIN.\PE.D. (TYP.) FASTEN SOLE PLATE TO RIM BOARD w/ 12d NAILS @ 6" O.C. OPTIONAL ALTERNATE DETAIL FASTEN SOLE PLATE TO RIM BOARD w/ 12d NAILS @ 6" O.C. RIM BOARD FASTENED TO SOLE PLATE w/ 12d TOENAILS @ 3" O.C. OPTIONAL ALTERNATE DETAILRIM BOARD FASTENED TO DBL. TOP PLATE w/ 12d TOENAILS @ 6" O.C. SHEARWALL ABOVE LOW ROOF TRUSSES (SEE PLAN) EXTEND SHEATHING TO BOT. OF BEAM & FASTEN PER SPECIFICATION ON PLAN ROOF TRUSS FASTEN TOP CHORD OF TRUSS TO TO EA. STUD w/ (3) 12d NAILS FASTEN SHEATHING TO TOP CHORD w/ 8d NAILS @ 6" O.C. 1SHEAR TRANSFER DETAIL @ EXTERIOR SHEARWALL ABOVESCALE: 3/4"=1'-0" FASTEN SOLE PLATE OF SHEARWALL TO RIM BOARD \Pw/ 10d NAILS @ 6" O.C. 1SCALE: 3/4"=1'-0" 2x EXTERIOR SHEAR WALL ABOVE. FLOOR SYSTEM\P(SEE PLANS) FASTEN SOLE PLATE TO RIM BOARD w/ 10d NAILS @ 6" O.C. STEEL BEAM (SEE PLAN) 2x6 CONT. LEDGER OR\PEND TRUSS TOP CHORD FASENED TO EA. STUD w/(3)10d NAILS @ 16" o.c. FASTEN SHTG. TO LEDGER w/8d NAILS @ 6"o.c. EXTEND SHEATHING TO BOT. OF BEAM & FASTEN PER SPECIFICATION ON PLAN ROOF TRUSS SHEARWALL ABOVE LOW ROOF TRUSSES (SEE PLAN)DROPPED BEAM @ WOOD BEAM @ STEEL BEAMSHEAR TRANSFER DETAIL @ EXTERIOR SHEARWALL ABOVE copyright : MULHERN & KULPStructural Engineering, Inc.cissue date: drawn by: project mgr: M&K project number: initial: REVISIONS: date: 3-14-14 JGF JE 125-13021 Castleton ModelMidwest Zonesheet:1900 East Golf Road, Suite 300Schaumburg, Illinois 60173Pulte Midwest ZoneBase - 18 psf Roof LiveJEMOVED P.C. IN BSMT. TO AVOID BATH 7 DOORWAY07/24/2014VRF2X12 FIRST FLOOR DESIGN10/08/2014AAMREVISED OPT. GAME ROOM FRAMING DEPTH10/27/2014NJDARCH REVISIONS02/23/2016Lateral Bracing DetailsS-4.1 09/17/19 Adam Schriner