Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
I38307405.3_Heritage_at_Spring_Mill
16023 Swingley Ridge Rd Chesterfield, MO 63017 314-434-1200 MiTek USA, Inc. Re: The truss drawing(s) referenced below have been prepared by MiTek USA, Inc. under my direct supervision based on the parameters provided by ProBuild (CarterLee Bldg Components). August 26,2019 Liu, Xuegang Pages or sheets covered by this seal: I38307405 thru I38307505 My license renewal date for the state of Indiana is July 31, 2020. 3_Heritage_at_Spring_Mill 3 Heritage at Spring Mill IMPORTANT NOTE: The seal on these truss component designs is a certification that the engineer named is licensed in the jurisdiction(s) identified and that the designs comply with ANSI/TPI 1. These designs are based upon parameters shown (e.g., loads, supports, dimensions, shapes and design codes), which were given to MiTek or TRENCO. Any project specific information included is for MiTek's or TRENCO's customers file reference purpose only, and was not taken into account in the preparation of these designs. MiTek or TRENCO has not independently verified the applicability of the design parameters or the designs for any particular building. Before use, the building designer should verify applicability of design parameters and properly incorporate these designs into the overall building design per ANSI/TPI 1, Chapter 2. 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss CG01 Truss Type DIAGONAL HIP GIRDER Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307405 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:16:56 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Mn9ZRmOMd2uScszJJXCR8HDWfTj3nyGncNe1qCyk?_5 Scale = 1:22.3 1 2 3 5 4 2x4 3x4 2x4 3x4 0-1-15 0-1-15 2-8-7 2-6-8 -1-2-13 1-2-13 2-8-7 2-8-7 1-7-03-9-122-9-130-11-50-11-159.90 12 4.95 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.15 0.07 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 -0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 14 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-8-7 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=202/0-3-8, 4=78/Mechanical Max Horz 5=104(LC 5) Max Uplift 5=-15(LC 4), 4=-65(LC 5) Max Grav 5=202(LC 1), 4=82(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 15 lb uplift at joint 5 and 65 lb uplift at joint 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss GE01 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307406 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:16:58 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-I9HJsSPc8f9Ar97iQyEvDiIlYHKYFqR43h78u4yk?_3 Scale = 1:64.7 Sheet Back Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 23 22 21 20 19 18 17 16 15 14 13 3x4 3x6 3x6 3x8 3x8 3x6 2x4 6x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 18-3-0 18-3-0 -1-3-8 1-3-8 14-5-10 14-5-10 18-3-0 3-9-6 1-1-010-6-710-8-1210-6-78.00 12 Plate Offsets (X,Y)-- [12:0-3-8,Edge], [13:0-3-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.64 0.39 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 0.00 (loc) 1 1 13 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 349 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 12-13: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 10-12. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 12-13, 10-15, 9-16, 11-14 REACTIONS.All bearings 18-3-0. (lb) - Max Horz 23=319(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 13, 15, 16, 17, 18, 19, 20, 14 except 23=-117(LC 4), 22=-175(LC 6) Max Grav All reactions 250 lb or less at joint(s) 13, 15, 16, 17, 18, 19, 20, 22, 14 except 23=261(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-294/173 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 15, 16, 17, 18, 19, 20, 14 except (jt=lb) 23=117, 22=175. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss GE02 Truss Type Hip Supported Gable Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307407 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:00 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FYO4H8RsgHPu5TG4YNHNI6O7w43njjNNW?cFzzyk?_1 Scale = 1:69.0 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 30 29 28 27 26 25 24 23 22 21 20 19 18 17 3x4 3x6 4x6 3x4 3x6 4x6 2x4 6x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 23-3-0 23-3-0 -1-0-0 1-0-0 8-2-0 8-2-0 15-1-0 6-11-0 23-3-0 8-2-0 24-3-0 1-0-0 1-7-011-1-51-7-011-1-514.00 12 Plate Offsets (X,Y)-- [7:0-2-11,Edge], [11:0-2-11,Edge], [25:0-3-0,0-1-4], [25:0-0-0,0-1-12], [26:0-1-4,0-0-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.46 0.22 0.15 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.01 (loc) 16 16 17 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 512 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 *Except* 11-21,10-22,9-23,8-24: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 7-11. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 11-21, 10-22, 9-23, 8-24, 6-26, 12-20 REACTIONS.All bearings 23-3-0. (lb) - Max Horz 30=-283(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 22, 23, 26, 28, 20, 19 except 30=-376(LC 4), 17=-143(LC 5), 27=-126(LC 6), 29=-341(LC 5), 18=-200(LC 7) Max Grav All reactions 250 lb or less at joint(s) 17, 21, 22, 23, 24, 26, 27, 28, 20, 19, 18 except 30=439(LC 5), 29=300(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-30=-269/251, 2-3=-300/287, 5-6=-50/300, 6-7=-48/283, 11-12=-49/334 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 7) Gable studs spaced at 2-0-0 oc. 8) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 22, 23, 26, 28, 20, 19 except (jt=lb) 30=376, 17=143, 27=126, 29=341, 18=200. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss GE03 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307408 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:00 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FYO4H8RsgHPu5TG4YNHNI6OCG45hjl3NW?cFzzyk?_1 Scale = 1:29.5 Sheet Back Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 9 8 7 6 2x4 3x4 3x4 2x4 2x4 2x4 2x4 2x4 -0-11-0 0-11-0 6-0-0 6-0-0 1-1-05-1-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.18 0.09 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 1 1 6 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 62 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 5-6: 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-0-0. (lb) - Max Horz 9=150(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 9, 6, 7 except 8=-105(LC 6) Max Grav All reactions 250 lb or less at joint(s) 9, 6, 7, 8 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 5) Gable studs spaced at 2-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6, 7 except (jt=lb) 8=105. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss GE04 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307409 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:01 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jkySUTSURaXlidrG55ocrKwNiUROSCVWlfLoVPyk?_0 Scale = 1:27.9 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 9 8 7 6 2x4 2x4 3x4 2x4 2x4 2x4 2x4 2x4 2x4 6-1-4 6-1-4 4-9-0 4-9-0 6-1-4 1-4-4 1-3-144-5-141-7-02-10-148.00 12 6.00 12 Plate Offsets (X,Y)-- [4:0-2-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.13 0.06 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a -0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 43 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-1-4. (lb) - Max Horz 9=94(LC 6) Max Uplift All uplift 100 lb or less at joint(s) 9, 6 except 8=-113(LC 6) Max Grav All reactions 250 lb or less at joint(s) 9, 6, 7, 8 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(12-13) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Provide adequate drainage to prevent water ponding. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Bearing at joint(s) 9, 6, 7, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 9) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6 except (jt=lb) 8=113. 10) Beveled plate or shim required to provide full bearing surface with truss chord at joint(s) 6, 7, 8. 11) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 12) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 13) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss GE05 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307410 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:02 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:ErDeBhooCW6W7KTmKQR8snz73g9-BwWqipS6CufcKnQTfoJrOXTWbul4BXHg_J5L1syk?_? Scale = 1:52.5 Sheet Front Full Sheathing 1 Ply 7/16OSB8 1 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 3x4 3x6 4x6 3x4 3x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 11-11-0 11-11-0 -1-0-0 1-0-0 5-11-8 5-11-8 11-11-0 5-11-8 12-11-0 1-0-0 1-7-08-6-71-7-014.00 12 Plate Offsets (X,Y)-- [5:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.16 0.57 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 9 9 10 l/defl n/r n/r n/a L/d 180 120 n/a PLATES MT20 Weight: 182 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.All bearings 11-11-0. (lb) - Max Horz 16=-218(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 14, 12 except 16=-154(LC 4), 10=-140(LC 5), 15=-184(LC 6), 11=-181(LC 7) Max Grav All reactions 250 lb or less at joint(s) 16, 10, 14, 15, 12, 11 except 13=296(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 4-5=-49/283, 5-6=-49/283 WEBS 5-13=-354/0 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Truss to be fully sheathed from one face or securely braced against lateral movement (i.e. diagonal web). 6) Gable studs spaced at 2-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 12 except (jt=lb) 16=154, 10=140, 15=184, 11=181. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J01 Truss Type Jack-Open Qty 22 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307411 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:03 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-f74Cv9TlzCnTyw?fDWq4wl0i_I5Pw5NpDzqvaIyk?__ Scale = 1:34.6 1 2 5 4 3 2x4 5x6 3x4 4-0-0 4-0-0 -1-0-0 1-0-0 4-0-0 4-0-0 1-7-06-3-05-7-146-3-014.00 12 Plate Offsets (X,Y)-- [2:Edge,0-2-7] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.21 0.16 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 18 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=230/0-3-8, 3=106/Mechanical, 4=39/Mechanical Max Horz 5=214(LC 6) Max Uplift 3=-103(LC 6), 4=-46(LC 6) Max Grav 5=230(LC 1), 3=106(LC 1), 4=78(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. BOT CHORD 4-5=-259/13 WEBS 2-4=-14/274 NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4 except (jt=lb) 3=103. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J02 Truss Type Jack-Open Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307412 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:04 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-7Jea7VUNkVvKZ4armDLJTyYr0iRqfZgzRdaS5kyk_zz Scale = 1:21.8 1 2 6 5 3 4 3x6 3x4 3x4 1-11-13 1-11-13 4-0-0 2-0-3 -0-11-0 0-11-0 1-11-13 1-11-13 4-0-0 2-0-3 1-1-03-9-02-11-143-3-130-9-28.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 -0.03 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)6=224/0-5-8, 3=118/Mechanical, 4=53/Mechanical Max Horz 6=124(LC 6) Max Uplift 3=-99(LC 6), 4=-14(LC 6) Max Grav 6=224(LC 1), 3=118(LC 1), 4=97(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 6 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 4. 6) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 49 lb down and 67 lb up at 3-11-4 on top chord, and 25 lb down and 16 lb up at 3-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 7) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 5-6=-20, 4-5=-20 Concentrated Loads (lb) Vert: 3=-17(B) 4=-11(B) August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J03 Truss Type Jack-Open Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307413 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:05 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-bVCzKrV?Vp1BBE92KwsY?A50m5n2O0w6gHJ0dAyk_zy Scale = 1:21.8 1 2 5 3 4 3x6 3x4 3-11-13 3-11-13 -0-11-0 0-11-0 4-0-0 4-0-0 1-1-03-9-01-11-123-3-131-9-48.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 -0.03 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=224/0-5-8, 3=101/Mechanical, 4=42/Mechanical Max Horz 5=124(LC 6) Max Uplift 3=-64(LC 6) Max Grav 5=224(LC 1), 3=101(LC 1), 4=72(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J04 Truss Type Jack-Open Qty 6 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307414 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:05 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-bVCzKrV?Vp1BBE92KwsY?A50m5n2O0w6gHJ0dAyk_zy Scale = 1:21.8 1 2 5 3 4 3x6 3x4 -0-11-0 0-11-0 4-0-0 4-0-0 1-1-03-9-01-11-123-3-131-9-48.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 -0.03 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=224/0-5-8, 3=101/Mechanical, 4=42/Mechanical Max Horz 5=124(LC 6) Max Uplift 3=-64(LC 6) Max Grav 5=224(LC 1), 3=101(LC 1), 4=72(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J05 Truss Type Jack-Open Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307415 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:06 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-3imLYBWdG791pOkEueOnYNeBVV7G7TAFvx3Z9dyk_zx Scale = 1:21.8 1 2 6 5 3 4 3x6 3x4 3x4 1-8-2 1-8-2 4-0-0 2-3-14 -0-11-0 0-11-0 1-8-2 1-8-2 4-0-0 2-3-14 1-1-03-9-03-1-113-3-130-7-58.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.15 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.03 -0.03 (loc) 5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)6=224/0-5-8, 3=101/Mechanical, 4=42/Mechanical Max Horz 6=124(LC 6) Max Uplift 3=-64(LC 6) Max Grav 6=224(LC 1), 3=101(LC 1), 4=72(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 6 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J06 Truss Type JACK-OPEN Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307416 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:07 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-XuJjlXWF1QHuQYJQSLv05bALzvT7swQP7bo6i3yk_zw Scale = 1:21.5 1 2 5 3 4 3x12 3x6 -1-8-14 1-8-14 3-7-10 3-7-10 1-7-03-8-40-4-153-3-52-11-80-8-126.95 12 2.98 12 Plate Offsets (X,Y)-- [5:0-0-0,0-0-10] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.40 0.17 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.02 -0.04 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 3-7-10 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=281/0-8-7, 3=76/Mechanical, 4=30/Mechanical Max Horz 5=132(LC 6) Max Uplift 5=-25(LC 6), 3=-53(LC 6), 4=-5(LC 6) Max Grav 5=281(LC 1), 3=76(LC 1), 4=64(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J07 Truss Type JACK-OPEN Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307417 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:07 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-XuJjlXWF1QHuQYJQSLv05bAIUvScswQP7bo6i3yk_zw Scale = 1:21.6 1 2 5 3 4 4x6 3x8 -2-5-11 2-5-11 2-11-6 2-11-6 1-11-123-8-43-1-93-3-50-6-116.95 12 2.98 12 Plate Offsets (X,Y)-- [5:0-1-8,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.63 0.20 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 -0.05 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-11-6 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=342/0-8-7, 3=21/Mechanical, 4=13/Mechanical Max Horz 5=144(LC 6) Max Uplift 5=-46(LC 6), 3=-35(LC 6), 4=-20(LC 6) Max Grav 5=342(LC 1), 3=24(LC 4), 4=48(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-5=-301/117 NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J08 Truss Type JACK-OPEN Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307418 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:08 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-04t5ytXtokPl2itd?3QFdoja5JptbNgYMFYgEVyk_zv Scale = 1:15.0 1 2 5 3 4 2x4 3x4 2-9-15 2-9-15 -1-2-13 1-2-13 2-9-15 2-9-15 1-1-02-5-00-4-92-0-72-5-05.66 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.19 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-9-15 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=209/0-4-9, 3=59/Mechanical, 4=24/Mechanical Max Horz 5=79(LC 6) Max Uplift 5=-34(LC 6), 3=-31(LC 6) Max Grav 5=209(LC 1), 3=59(LC 1), 4=48(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J09 Truss Type JACK-OPEN Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307419 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:09 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UHRTACYVZ2XcgrSpZmxUA0Glrj96KqvibvHDmyyk_zu Scale = 1:15.0 1 2 5 3 4 2x4 3x4 2-9-15 2-9-15 -1-2-13 1-2-13 2-9-15 2-9-15 1-1-02-5-00-4-92-0-72-5-05.66 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.19 0.07 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.01 -0.01 (loc) 4-5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-9-15 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=209/0-4-9, 3=59/Mechanical, 4=24/Mechanical Max Horz 5=79(LC 6) Max Uplift 5=-34(LC 6), 3=-31(LC 6) Max Grav 5=209(LC 1), 3=59(LC 1), 4=48(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J10 Truss Type Jack-Open Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307420 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:09 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UHRTACYVZ2XcgrSpZmxUA0GlPjAIKqvibvHDmyyk_zu Scale = 1:15.1 1 2 5 3 42x4 3x4 2-0-0 2-0-0 -0-11-0 0-11-0 2-0-0 2-0-0 1-1-02-5-01-11-132-5-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.15 0.06 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=156/0-3-8, 3=39/Mechanical, 4=16/Mechanical Max Horz 5=82(LC 6) Max Uplift 5=-7(LC 6), 3=-33(LC 6), 4=-6(LC 6) Max Grav 5=156(LC 1), 3=39(LC 1), 4=34(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J11 Truss Type JACK-OPEN Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307421 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:10 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yT?sNYZ8KLfTH?1?7USjiDotz6V43H9rqZ1nJOyk_zt Scale = 1:15.0 1 2 4 6 3 5 3x4 2x4 1-4-6 1-3-12 -1-8-14 1-8-14 1-4-6 1-4-6 1-7-02-4-86.95 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.29 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.01 (loc) 6 6 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-4-6 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=-2/Mechanical, 3=-45/Mechanical, 6=253/0-5-12 Max Horz 6=90(LC 6) Max Uplift 5=-29(LC 6), 3=-45(LC 1), 6=-35(LC 6) Max Grav 5=19(LC 2), 3=14(LC 4), 6=253(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J12 Truss Type JACK-OPEN Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307422 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:11 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-QfZEbuZm4fnKv9cBhBzyFRL2jWrJokP?2DmKrqyk_zs Scale = 1:15.0 1 2 4 6 3 5 3x4 2x4 1-4-6 1-3-12 -1-8-14 1-8-14 1-4-6 1-4-6 1-7-02-4-86.95 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.29 0.09 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.01 (loc) 6 6 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 7 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-4-6 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=-2/Mechanical, 3=-44/Mechanical, 6=253/0-5-12 Max Horz 6=90(LC 6) Max Uplift 5=-29(LC 6), 3=-44(LC 1), 6=-35(LC 6) Max Grav 5=19(LC 2), 3=14(LC 4), 6=253(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J25 Truss Type Jack-Closed Qty 6 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307423 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:12 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-us7coEaOrzvBXJBOEuVBoeuGTwCTXBA8HtWtNGyk_zr Scale = 1:22.9 1 2 3 5 4 2x4 3x6 3x4 3x4 -0-11-0 0-11-0 2-0-0 2-0-0 1-7-03-11-02-11-10-11-10-11-1514.00 12 7.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.10 0.03 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 5 4-5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 13 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=153/0-3-8, 4=82/Mechanical, 3=33/Mechanical Max Horz 5=106(LC 5) Max Uplift 5=-48(LC 4), 4=-141(LC 6), 3=-37(LC 5) Max Grav 5=153(LC 1), 4=123(LC 11), 3=50(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3 except (jt=lb) 4=141. 6) Gap between inside of top chord bearing and first diagonal or vertical web shall not exceed 0.500in. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 75 lb down and 73 lb up at 1-10-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 4-5=-20 Concentrated Loads (lb) Vert: 4=-65(F) August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J26 Truss Type Jack-Open Qty 4 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307424 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:12 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-us7coEaOrzvBXJBOEuVBoeuDpwAyXBf8HtWtNGyk_zr Scale: 3/4"=1' 1 2 5 3 4 3x4 3x6 0-10-0 0-10-0 -0-11-0 0-11-0 0-10-0 0-10-0 1-7-02-6-111-11-92-6-1114.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.27 0.13 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 0-10-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/0-5-8, 3=-22/Mechanical, 4=-1/Mechanical Max Horz 5=99(LC 6) Max Uplift 5=-2(LC 4), 3=-38(LC 6), 4=-85(LC 6) Max Grav 5=141(LC 1), 3=14(LC 4), 4=11(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J27 Truss Type JACK-OPEN Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307425 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:13 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-M2h_0ab0cG228Tmaoc0QKsQOUKXRGevHWXFRvjyk_zq Scale: 3/4"=1' 1 2 5 3 4 3x4 3x6 1-2-2 1-1-12 -1-2-13 1-2-13 1-2-2 1-2-2 1-7-02-6-102-0-142-6-109.90 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.27 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-2-2 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=180/0-7-0, 3=-16/Mechanical, 4=1/Mechanical Max Horz 5=96(LC 6) Max Uplift 3=-28(LC 7), 4=-47(LC 6) Max Grav 5=180(LC 1), 3=12(LC 4), 4=17(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J28 Truss Type JACK-OPEN Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307426 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:14 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-qEEMDwceNaAvmdLmMJXft3zZEktg?59RkB?_S9yk_zp Scale: 3/4"=1' 1 2 5 3 4 3x4 3x6 1-2-2 1-2-2 -1-2-13 1-2-13 1-2-2 1-2-2 1-7-02-6-100-5-122-0-142-6-109.90 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.27 0.11 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.00 -0.00 -0.01 (loc) 5 5 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 1-2-2 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=180/0-7-6, 3=-16/Mechanical, 4=1/Mechanical Max Horz 5=96(LC 6) Max Uplift 3=-28(LC 7), 4=-47(LC 6) Max Grav 5=180(LC 1), 3=12(LC 4), 4=17(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3, 4. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss J29 Truss Type Jack-Closed Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307427 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:15 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-IQolQGdG8uImOmwzw12uPHWhU785kYjazrkX_byk_zo Scale = 1:31.7 1 2 3 5 4 2x4 3x6 2x4 3x4 6-1-4 6-1-4 -1-5-8 1-5-8 6-1-4 6-1-4 1-3-145-4-112-5-132-9-22-10-148.00 12 6.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.50 0.36 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.08 -0.20 -0.00 (loc) 4-5 4-5 4 l/defl >892 >357 n/a L/d 240 180 n/a PLATES MT20 Weight: 26 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=344/0-3-8, 4=221/Mechanical Max Horz 5=152(LC 6) Max Uplift 5=-29(LC 6), 4=-61(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-5=-285/165 NOTES-(6-7) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Bearing at joint(s) 5 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss M01 Truss Type Monopitch Qty 3 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307428 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:15 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-IQolQGdG8uImOmwzw12uPHWnP7DykYOazrkX_byk_zo Scale = 1:16.8 1 2 3 5 4 2x4 2x4 2x4 2x4 2-6-0 2-6-0 -0-11-0 0-11-0 2-6-0 2-6-0 1-1-02-9-08.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.12 0.05 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-6-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=75/Mechanical, 5=169/0-3-8 Max Horz 5=79(LC 5) Max Uplift 4=-32(LC 5), 5=-25(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 5. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss M02 Truss Type Monopitch Qty 3 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307429 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:16 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-ndM7ecduvBQd?wV9TkZ7yU2u2XXeT?ekCUU5W2yk_zn Scale: 1"=1' 1 2 3 5 4 3x6 2x4 3x6 4-8-8 4-8-8 -0-1-8 0-1-8 4-8-8 4-8-8 0-8-01-10-23.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.38 0.14 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.03 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 12 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-8-8 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=178/Mechanical, 5=184/0-3-8 Max Horz 5=49(LC 5) Max Uplift 4=-19(LC 6), 5=-16(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 5. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB01 Truss Type GABLE Qty 8 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307430 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:17 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FpwVryeXgVYUd43L1S4MVib7KxvLCRitR8De2Uyk_zm Scale = 1:22.0 2 3 4 6 1 5 4x6 2x4 2x4 2x4 5-4-11 5-4-11 2-8-6 2-8-6 5-4-11 2-8-6 -0-0-43-1-83-1-120-1-00-1-814.00 12 Plate Offsets (X,Y)-- [3:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.09 0.05 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-4-11 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 5-4-11. (lb) - Max Horz 1=-70(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 5 except 2=-158(LC 6), 4=-139(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 2, 4, 6 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 4-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Bearing at joint(s) 1, 5, 2, 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5 except (jt=lb) 2=158, 4=139. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB02 Truss Type GABLE Qty 6 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307431 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:18 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-j?Ut3Hf9RpgKFEeYb9bb1v8IsLEKxut0fozCbwyk_zl Scale: 3/4"=1' 2 3 4 6 1 5 4x6 2x4 2x4 2x4 6-6-0 6-6-0 3-3-0 3-3-0 6-6-0 3-3-0 -0-0-42-1-122-2-00-1-00-1-88.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.10 0.07 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-6-0. (lb) - Max Horz 1=46(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 1, 5, 2, 4 Max Grav All reactions 250 lb or less at joint(s) 1, 5, 2, 4, 6 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 4-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5, 2, 4. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB03 Truss Type GABLE Qty 6 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307432 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:18 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-j?Ut3Hf9RpgKFEeYb9bb1v8HPLE4xu80fozCbwyk_zl Scale = 1:15.0 2 3 4 1 2x4 2x4 2x4 3-8-0 3-8-0-0-0-42-5-52-5-12-3-130-1-88.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.13 0.08 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=-102/3-8-0, 4=94/3-8-0, 2=270/3-8-0 Max Horz 1=62(LC 5) Max Uplift 1=-102(LC 1), 4=-10(LC 6), 2=-96(LC 6) Max Grav 1=84(LC 6), 4=94(LC 1), 2=270(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 3) Gable requires continuous bottom chord bearing. 4) Gable studs spaced at 4-0-0 oc. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Bearing at joint(s) 1, 2 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 2 except (jt=lb) 1=102. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB04 Truss Type GABLE Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307433 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:19 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-BC2FGdgnC6oBsODk9t7qa7gT_laLgLGAuSil7Myk_zk Scale = 1:14.0 2 3 4 5 7 1 6 3x4 2x4 2x4 2x4 4x6 6-6-0 6-6-0 6-6-0 6-6-0 -0-0-41-9-101-9-140-1-00-1-81-8-68.00 12 Plate Offsets (X,Y)-- [3:0-2-0,0-2-3], [4:0-4-4,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.08 0.08 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 15 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 6-6-0. (lb) - Max Horz 1=-38(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 6, 2, 5 Max Grav All reactions 250 lb or less at joint(s) 1, 6, 5, 7 except 2=264(LC 10) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 4-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 6, 2, 5. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB05 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307434 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:20 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-fOceUzgPzQw2UYowiae36KDav8ulPo?J76SIfpyk_zj Scale = 1:23.2 2 3 4 6 1 5 4x6 3x4 3x4 2x4 10-2-0 10-2-0 5-1-0 5-1-0 10-2-0 5-1-0 -0-0-43-4-73-4-110-1-00-1-88.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.33 0.20 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 26 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 10-2-0. (lb) - Max Horz 1=74(LC 5) Max Uplift All uplift 100 lb or less at joint(s) except 1=-279(LC 1), 5=-279(LC 1), 2=-220(LC 6), 4=-209(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5 except 2=527(LC 1), 4=527(LC 1), 6=271(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 4-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 279 lb uplift at joint 1, 279 lb uplift at joint 5, 220 lb uplift at joint 2 and 209 lb uplift at joint 4. 8) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB06 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307435 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:21 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-7aA0hJh1kk2v6hN6GH9IfYlnGYE08FCTMmCsBFyk_zi Scale = 1:18.0 2 3 4 5 6 9 8 1 7 3x4 2x4 2x4 2x4 4x6 2x4 2x4 10-2-0 10-2-0 10-2-0 10-2-0 -0-0-41-2-121-3-00-1-00-1-81-1-88.00 12 Plate Offsets (X,Y)-- [3:0-2-0,0-2-3], [5:0-4-4,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.22 0.13 0.04 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 7 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 23 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except 2-0-0 oc purlins (6-0-0 max.): 3-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 10-2-0. (lb) - Max Horz 1=-25(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 7, 2, 6, 8, 9 Max Grav All reactions 250 lb or less at joint(s) 1, 7, 2, 6, 8 except 9=341(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 4-9=-254/127 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 4-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 7, 2, 6, 8, 9. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB08 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307436 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:22 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-bnjOufifV1AmkryJq?gXClIwwybdthXcaQxPkhyk_zh Scale = 1:42.5 2 3 4 5 6 7 8 9 16 15 14 13 12 11 10 1 3x6 2x4 2x4 3x6 3x6 2x4 4x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 24-10-2 24-10-2 6-7-2 6-7-2 21-7-8 15-0-6 24-10-2 3-2-10 4-4-122-3-02-1-80-1-84-3-48.00 12 Plate Offsets (X,Y)-- [2:0-2-11,0-1-8], [4:0-3-0,0-0-2], [8:0-3-12,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.36 0.11 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 10 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 74 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-8. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 24-10-2. (lb) - Max Horz 1=120(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 10, 12, 13, 14, 16 except 1=-285(LC 1), 2=-139(LC 6) Max Grav All reactions 250 lb or less at joint(s) 1, 10 except 2=531(LC 1), 11=289(LC 1), 12=332(LC 10), 13=323(LC 1), 14=316(LC 11), 16=362(LC 10) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 7-12=-251/107, 3-16=-267/100 NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 4-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 12, 13, 14, 16 except (jt=lb) 1=285, 2=139. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB09 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307437 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:23 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-3zHm6?jHGLIdL?XVOiBmkzr9hMx0c9Gmp4hzG8yk_zg Scale = 1:13.5 2 3 4 5 7 1 6 3x4 2x4 2x4 2x4 5x6 5-4-11 5-4-11 1-6-5 1-6-5 3-10-7 2-4-2 5-4-11 1-6-5 1-9-50-1-40-1-81-7-1314.00 12 Plate Offsets (X,Y)-- [3:0-1-5,Edge], [4:0-4-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.10 0.10 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 14 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-4-11 oc purlins, except 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 5-4-11. (lb) - Max Horz 1=-40(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 6, 2, 5 Max Grav All reactions 250 lb or less at joint(s) 1, 6, 2, 5, 7 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(11-12) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Provide adequate drainage to prevent water ponding. 5) Gable requires continuous bottom chord bearing. 6) Gable studs spaced at 4-0-0 oc. 7) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 6, 2, 5. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 11) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 12) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss PB10 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307438 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:24 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Y9r8JLkw1fQUz96hxQi?HANKamI_LcRv2kQWoayk_zf Scale = 1:22.1 2 3 4 6 1 5 4x6 2x4 2x4 2x4 5-4-11 5-4-11 2-8-6 2-8-6 5-4-11 2-8-6 3-1-120-1-40-1-814.00 12 Plate Offsets (X,Y)-- [3:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.09 0.05 0.01 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 4 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 16 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-4-11 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 5-4-11. (lb) - Max Horz 1=-71(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 5 except 2=-151(LC 6), 4=-131(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 2, 4, 6 FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Truss designed for wind loads in the plane of the truss only. For studs exposed to wind (normal to the face), see Standard Industry Gable End Details as applicable, or consult qualified building designer as per ANSI/TPI 1. 4) Gable requires continuous bottom chord bearing. 5) Gable studs spaced at 4-0-0 oc. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Bearing at joint(s) 1, 5, 2, 4 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5 except (jt=lb) 2=151, 4=131. 9) See Standard Industry Piggyback Truss Connection Detail for Connection to base truss as applicable, or consult qualified building designer. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T01 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307439 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:25 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0MPWXhkYnyYLbJhuV7DFpOwHA9Uc4sj2GOA3K0yk_ze Scale = 1:64.9 1 2 3 4 5 6 7 81413121110 9 6x6 4x6 4x6 3x6 3x4 3x6 6x10 5x12 3x8 3x4 3x8 3x12 4x6 4x8 6-8-10 6-8-10 14-9-0 8-0-6 23-10-12 9-1-12 30-0-0 6-1-4 6-8-10 6-8-10 10-8-13 4-0-3 14-9-0 4-0-3 19-3-14 4-6-14 23-10-12 4-6-14 30-0-0 6-1-4 4-1-48-4-1111-5-141-3-142-10-148-4-118.00 12 6.00 12 Plate Offsets (X,Y)-- [6:0-1-0,0-2-0], [8:0-4-3,0-0-0], [9:0-2-14,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 1.00 0.67 0.84 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.21 -0.68 0.30 (loc) 10-11 10-11 9 l/defl >999 >524 n/a L/d 240 180 n/a PLATES MT20 Weight: 133 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 *Except* 9-10: 2x4 SPF 2100F 1.8E WEBS 2x3 SPF No.2 *Except* 1-14: 2x4 SPF-S Stud, 8-9,6-9: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-0-8 oc purlins, except end verticals, and 2-0-0 oc purlins (5-5-12 max.): 2-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-13, 6-9 REACTIONS.(lb/size)14=1188/0-3-8, 9=1188/0-3-8 Max Horz 14=-297(LC 4) Max Uplift 14=-8(LC 6), 9=-59(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1027/155, 2-3=-772/174, 3-4=-1115/188, 4-5=-1410/189, 5-6=-3253/287, 6-8=-610/181, 1-14=-1123/119, 8-9=-493/145 BOT CHORD 13-14=-175/287, 11-13=-35/998, 10-11=0/1551, 9-10=-40/2988 WEBS 2-13=-0/275, 3-13=-571/125, 3-11=-24/276, 4-11=-9/484, 5-11=-664/146, 5-10=-115/1669, 6-10=-3/292, 1-13=-38/832, 6-9=-2973/0 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 9 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 14, 9. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T02 Truss Type Piggyback Base Qty 4 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307440 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:26 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UYzvk0lAYGgCCTG43rlUMbTWjZlhpIKCV2vdtSyk_zd Scale = 1:71.4 1 2 3 4 5 6 7131211109 8 6x6 5x10 MT18HS 4x6 3x6 3x6 3x6 8x10 5x12 3x6 3x8 3x12 4x6 4x8 7-5-13 7-5-13 13-11-13 6-6-0 23-10-12 9-10-15 30-0-0 6-1-4 7-5-13 7-5-13 13-11-13 6-6-0 18-11-4 4-11-7 23-10-12 4-11-7 30-0-0 6-1-4 4-1-49-1-212-0-01-3-142-10-149-1-28.00 12 6.00 12 Plate Offsets (X,Y)-- [2:0-6-0,0-1-8], [3:0-3-4,0-2-4], [5:0-1-4,0-1-12], [7:0-4-3,0-0-0], [8:0-2-14,Edge], [12:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.69 1.00 0.95 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.32 -0.94 0.33 (loc) 9-10 9-10 8 l/defl >999 >378 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 135 lb FT = 20% GRIP 197/144 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,1-13,7-8,5-8: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-11-10 oc purlins, except end verticals, and 2-0-0 oc purlins (5-4-1 max.): 2-3. BOT CHORD Structural wood sheathing directly applied. WEBS 1 Row at midpt 2-12, 5-8 REACTIONS.(lb/size)13=1188/0-3-8, 8=1188/0-3-8 Max Horz 13=-311(LC 4) Max Uplift 13=-13(LC 7), 8=-61(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-1065/164, 2-3=-1033/191, 3-4=-1319/189, 4-5=-3279/280, 5-7=-579/185, 1-13=-1105/128, 7-8=-475/148 BOT CHORD 12-13=-184/317, 10-12=-58/784, 9-10=0/1499, 8-9=-27/3012 WEBS 2-12=-258/98, 2-10=-72/494, 3-10=-0/416, 4-10=-693/162, 4-9=-105/1742, 5-9=0/299, 1-12=-51/793, 5-8=-3029/0 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Bearing at joint(s) 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T03 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307441 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:27 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-ykXHyMmoJao3qcqGdYGjup?hSzB1YuzLkifAPvyk_zc Scale = 1:81.8 1 2 3 4 5 6 7 12 11 10 9 8 13 3x6 8x14 MT18HS 3x6 3x6 3x8 3x6 3x4 3x6 4x8 3x6 8-11-12 8-11-12 17-9-0 8-9-4 18-2-8 0-5-8 18-6-0 0-3-8 18-6-8 0-0-8 -1-3-8 1-3-8 8-11-12 8-11-12 17-9-0 8-9-4 18-2-8 0-5-8 18-6-8 0-4-0 1-1-012-8-1112-11-012-5-39-5-412-8-118.00 12 Plate Offsets (X,Y)-- [2:0-2-12,0-2-0], [5:0-9-0,0-0-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.69 0.54 0.35 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.10 -0.30 0.30 (loc) 9-10 9-10 13 l/defl >999 >724 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 112 lb FT = 20% GRIP 169/123 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 *Except* 5-7: 2x6 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x6 SPF No.2 *Except* 4-10,2-10: 2x3 SPF No.2, 4-9: 2x4 SPF No.2 OTHERS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-12 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-7. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 4-9 REACTIONS.(lb/size)12=808/0-3-8, 13=739/0-3-8 Max Horz 12=412(LC 6) Max Uplift 13=-192(LC 6) Max Grav 12=808(LC 10), 13=739(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-803/0, 2-12=-725/33 BOT CHORD 8-13=-269/340, 6-13=-548/0, 10-12=-431/429, 9-10=-169/551 WEBS 4-10=0/359, 4-9=-643/201, 2-10=-7/264, 5-9=0/480 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) The Fabrication Tolerance at joint 5 = 8%, joint 5 = 8% 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Bearing at joint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 8) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 13=192. 9) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T04 Truss Type Piggyback Base Qty 5 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307442 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:28 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Qx5f9inQ4twwSmPTAGnyR0YojNZbHK9VzMOjxLyk_zb Scale = 1:62.3 1 2 3 4 5 6 11 10 9 8 7 12 13 3x6 6x6 4x8 3x6 3x6 3x6 3x4 3x4 6x8 6x6 3x6 7-6-8 7-6-8 14-10-8 7-4-0 18-6-8 3-8-0 -1-3-8 1-3-8 7-6-8 7-6-8 14-10-8 7-4-0 18-6-8 3-8-0 1-1-011-0-09-1-1211-0-08.00 12 Plate Offsets (X,Y)-- [5:0-4-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.91 0.39 0.41 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.19 0.11 (loc) 8-9 8-9 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 103 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 4-9,4-8,2-9: 2x3 SPF No.2, 2-11: 2x4 SPF-S Stud OTHERS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-15 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-8, 5-7 REACTIONS.(lb/size)11=819/0-3-8, 13=703/0-3-8 Max Horz 11=313(LC 5) Max Uplift 11=-43(LC 6), 13=-95(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-858/48, 4-5=-384/102, 7-12=-87/710, 6-12=-87/710, 2-11=-746/104 BOT CHORD 9-11=-278/326, 8-9=-108/613 WEBS 4-9=0/290, 4-8=-505/157, 5-8=-89/470, 5-7=-716/131, 2-9=0/290, 6-13=-710/100 NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 13. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T05 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307443 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:29 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-u7e1M2n2rB3n3w_fkzIB_E59_n?P0tQeB08HTnyk_za Scale = 1:22.1 1 2 3 4 7 6 5 4x8 2x4 3x4 2x4 3x4 3x6 1-11-0 1-11-0 4-0-0 2-1-0 -0-11-0 0-11-0 1-11-0 1-11-0 4-0-0 2-1-0 1-7-03-8-03-9-133-8-014.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.17 0.03 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 23 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=115(LC 5) Max Uplift 5=-55(LC 5), 7=-15(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T06 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307444 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:30 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-MJCPaOogcVBeh4ZrIgpQWRdHMAJtlJXoQgtq0Eyk_zZ Scale = 1:28.9 1 2 3 4 7 6 5 4x6 4x6 2x4 3x4 3x4 3x6 3-0-11 3-0-11 4-0-0 0-11-5 -0-11-0 0-11-0 3-0-11 3-0-11 4-0-0 0-11-5 1-7-05-0-05-1-135-0-014.00 12 Plate Offsets (X,Y)-- [3:0-3-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.33 0.15 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 25 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=155(LC 5) Max Uplift 5=-89(LC 5), 7=-20(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T07 Truss Type Piggyback Base Qty 7 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307445 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:31 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-rVmonkpJNoJUJE81sOKf3fAO_aa2Ua2xfKdOYgyk_zY Scale = 1:67.7 1 2 3 4 5 6 7 8 13 12 11 10 9 4x6 6x6 3x6 3x8 3x6 3x4 3x6 3x4 5x8 5x8 3x4 8-11-2 8-11-2 14-3-14 5-4-11 23-3-0 8-11-2 -1-0-0 1-0-0 4-6-13 4-6-13 8-11-2 4-4-5 14-3-14 5-4-11 18-8-3 4-4-5 23-3-0 4-6-13 24-3-0 1-0-0 1-7-012-0-01-7-012-0-014.00 12 Plate Offsets (X,Y)-- [4:0-3-2,0-2-0], [5:0-3-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.59 0.47 0.85 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.02 (loc) 9-10 9-10 9 l/defl >999 >843 n/a L/d 240 180 n/a PLATES MT20 Weight: 136 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 3-11,6-10,3-13,6-9: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-11 REACTIONS.(lb/size)13=987/0-3-8, 9=987/0-3-8 Max Horz 13=303(LC 5) Max Uplift 13=-46(LC 6), 9=-46(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-384/153, 3-4=-771/212, 4-5=-443/195, 5-6=-771/212, 6-7=-385/153, 2-13=-403/172, 7-9=-403/172 BOT CHORD 11-13=-168/495, 10-11=-37/442, 9-10=0/495 WEBS 4-11=-69/290, 5-10=-87/290, 3-13=-588/97, 6-9=-587/98 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 9. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T08 Truss Type Piggyback Base Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307446 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:32 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-JiKA?4qx86RLwOjEP5rubsjZj_wGD1F4t_Mx46yk_zX Scale = 1:67.7 1 2 3 4 5 6 7 12 11 10 9 8 4x6 6x6 3x6 3x6 3x8 3x6 3x4 3x6 3x4 5x8 5x8 8-11-2 8-11-2 14-3-14 5-4-11 23-3-0 8-11-2 -1-0-0 1-0-0 4-6-13 4-6-13 8-11-2 4-4-5 14-3-14 5-4-11 18-8-3 4-4-5 23-3-0 4-6-13 1-7-012-0-01-7-012-0-014.00 12 Plate Offsets (X,Y)-- [4:0-3-2,0-2-0], [5:0-3-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.59 0.47 0.86 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.13 -0.33 0.02 (loc) 8-9 8-9 8 l/defl >999 >845 n/a L/d 240 180 n/a PLATES MT20 Weight: 134 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 3-10,6-9,3-12,6-8: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 4-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 5-10 REACTIONS.(lb/size)12=989/0-3-8, 8=917/0-3-8 Max Horz 12=317(LC 5) Max Uplift 12=-45(LC 6), 8=-15(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-384/152, 3-4=-773/211, 4-5=-444/194, 5-6=-775/211, 6-7=-395/124, 2-12=-403/172, 7-8=-357/114 BOT CHORD 10-12=-182/496, 9-10=-51/444, 8-9=-2/500 WEBS 4-10=-68/291, 5-9=-85/292, 3-12=-590/97, 6-8=-557/109 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 8. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T09 Truss Type Roof Special Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307447 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:33 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-nuuYCQqZvQZCYXIQzpN784FlAOJlycfE6e6UdZyk_zW Scale = 1:47.0 1 2 3 6 5 4 3x6 6x6 4x8 3x6 3x6 3x4 1-9-11 1-9-11 7-1-8 5-3-13 1-9-11 1-9-11 7-1-8 5-3-13 7-9-71-7-07-9-714.00 12 Plate Offsets (X,Y)-- [2:0-4-12,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.55 0.26 0.33 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.03 -0.06 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 39 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 3-4: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 1-2. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=275/Mechanical, 4=275/0-3-8 Max Horz 6=-224(LC 4) Max Uplift 6=-120(LC 4), 4=-7(LC 5) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-6=-288/217 WEBS 1-5=-236/321 NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4 except (jt=lb) 6=120. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T10 Truss Type Roof Special Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307448 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:34 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-F4SwQmrBgjh3AhtcXWuMhHox2ofDhzBNLIr29?yk_zV Scale = 1:58.2 1 2 3 4 5 6 10 9 8 7 3x6 4x6 5x6 5x12 3x12 3x6 3x6 3x6 3x6 4-1-0 4-1-0 8-4-0 4-3-0 12-8-0 4-4-0 4-1-0 4-1-0 6-2-8 2-1-8 8-4-0 2-1-8 12-8-0 4-4-0 13-7-0 0-11-0 1-10-149-1-131-7-00-0-63-0-614.00 12 9.00 12 Plate Offsets (X,Y)-- [3:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.47 0.25 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.08 0.11 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 69 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-10,5-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=492/Mechanical, 7=561/0-3-8 Max Horz 10=-248(LC 4) Max Uplift 10=-29(LC 7), 7=-33(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-262/188, 2-3=-356/69, 3-4=-706/160, 4-5=-272/242, 1-10=-257/167, 5-7=-334/248 BOT CHORD 9-10=-184/546, 8-9=-135/419, 7-8=-27/551 WEBS 2-9=-53/398, 2-8=-269/140, 3-8=-170/655, 4-8=-92/334, 2-10=-591/0, 4-7=-589/52 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Bearing at joint(s) 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 7. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T11 Truss Type Common Qty 3 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307449 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:34 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-F4SwQmrBgjh3AhtcXWuMhHosjofWh61NLIr29?yk_zV Scale = 1:57.7 1 2 3 4 7 6 5 6x8 4x8 3x4 3x4 3x8 6x8 6-2-8 6-2-8 12-8-0 6-5-8 6-2-8 6-2-8 12-8-0 6-5-8 13-7-0 0-11-0 1-10-89-1-71-7-014.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-5], [2:0-4-12,0-2-0], [3:Edge,0-1-5] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.82 0.23 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.07 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 58 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-7,3-5: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=492/Mechanical, 5=561/0-3-8 Max Horz 7=-248(LC 4) Max Uplift 7=-30(LC 7), 5=-31(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-443/121, 2-3=-452/119, 1-7=-431/85, 3-5=-497/120 BOT CHORD 6-7=-259/308 WEBS 3-6=-131/261 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7, 5. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T12 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307450 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:35 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jH0Id5spR1pwnrSp5EPbDVL8MBxDQUOXaybbhRyk_zU Scale = 1:33.9 1 2 3 4 5 6 7 13 12 11 10 9 8 4x8 4x8 3x6 2x4 5x8 5x12 2x4 3x6 3x4 2x4 3x6 3x6 3-0-0 3-0-0 5-11-0 2-11-0 12-4-0 6-5-0 15-7-1 3-3-1 18-3-0 2-7-15 -0-11-0 0-11-0 3-0-0 3-0-0 5-11-0 2-11-0 12-4-0 6-5-0 15-7-1 3-3-1 18-3-0 2-7-15 1-7-04-11-35-1-01-11-122-8-122-2-714.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0], [6:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.37 0.46 0.45 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.23 0.17 (loc) 10-11 10-11 8 l/defl >999 >952 n/a L/d 240 180 n/a PLATES MT20 Weight: 75 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-13,7-8: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (4-3-7 max.): 3-6. BOT CHORD Structural wood sheathing directly applied or 9-7-12 oc bracing. REACTIONS.(lb/size)13=784/0-5-8, 8=716/0-5-8 Max Horz 13=155(LC 5) Max Uplift 13=-48(LC 5), 8=-49(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-860/173, 3-4=-1551/328, 4-5=-1569/267, 5-6=-1570/268, 6-7=-749/88, 2-13=-761/138, 7-8=-699/74 BOT CHORD 11-12=-198/586, 10-11=-374/1568, 9-10=-92/513 WEBS 3-11=-231/1249, 4-11=-349/161, 5-10=-342/142, 6-10=-263/1296, 6-9=-255/77, 2-12=-36/493, 7-9=-78/446 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 13, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T13 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307451 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:36 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-BTahqRtRCLxnP?0?exwqmitIvbKd9zMgocK9Dtyk_zT Scale = 1:39.0 1 2 3 4 5 6 7 13 12 11 10 9 8 4x8 4x8 4x6 3x4 5x8 5x12 2x4 3x6 3x4 2x4 3x6 5x6 4-1-11 4-1-11 5-11-0 1-9-5 12-4-0 6-5-0 14-5-6 2-1-6 18-3-0 3-9-10 -0-11-0 0-11-0 4-1-11 4-1-11 5-11-0 1-9-5 12-4-0 6-5-0 14-5-6 2-1-6 18-3-0 3-9-10 1-7-06-3-36-5-01-11-122-8-123-6-714.00 12 6.00 12 Plate Offsets (X,Y)-- [2:0-3-0,0-2-1], [3:0-5-3,0-2-0], [6:0-5-3,0-2-0], [7:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.39 0.32 0.27 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.15 0.09 (loc) 10-11 10-11 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 82 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-13,7-8: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-11-11 oc purlins, except end verticals, and 2-0-0 oc purlins (5-6-11 max.): 3-6. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)13=784/0-5-8, 8=716/0-5-8 Max Horz 13=187(LC 5) Max Uplift 13=-33(LC 6), 8=-15(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-938/166, 3-4=-921/201, 4-5=-930/136, 5-6=-932/138, 6-7=-850/85, 2-13=-766/141, 7-8=-696/84 BOT CHORD 11-12=-205/626, 10-11=-248/929, 9-10=-85/562 WEBS 3-11=-122/791, 4-11=-357/189, 5-10=-333/147, 6-10=-186/784, 2-12=-6/495, 7-9=-82/450 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 13, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T14 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307452 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:37 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-ff732nu3ze3e19bBCfR3IwQSK?gBuSDp1G4imKyk_zS Scale = 1:45.1 1 2 3 4 5 6 10 9 8 7 4x6 4x6 6x8 3x4 6x10 6x8 3x4 3x4 5x8 5-11-0 5-11-0 12-4-0 6-5-0 18-3-0 5-11-0 -0-11-0 0-11-0 5-3-7 5-3-7 9-3-9 4-0-2 13-3-10 4-0-2 18-3-0 4-11-6 1-7-07-7-37-9-01-11-122-8-124-10-714.00 12 6.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-5], [3:0-3-3,0-2-0], [5:0-3-3,0-2-0], [6:Edge,0-1-5] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.47 0.30 0.17 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.11 0.06 (loc) 8-9 8-9 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 80 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,6-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-4 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-5. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=784/0-5-8, 7=716/0-5-8 Max Horz 10=220(LC 5) Max Uplift 10=-36(LC 6), 7=-4(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-998/139, 3-4=-628/138, 4-5=-624/100, 5-6=-945/90, 2-10=-774/156, 6-7=-698/98 BOT CHORD 9-10=-266/266, 8-9=-176/702 WEBS 3-9=-10/413, 5-8=-52/391, 2-9=0/491, 6-8=-109/476 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 10, 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T15 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307453 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:38 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-7shRF7uikyBVeJAOmMyIr7zXnP?2ds3zGwpFImyk_zR Scale = 1:52.8 1 2 3 4 8 7 6 5 3x8 5x12 5x8 6x8 6x6 3x4 6x10 3x6 5-11-0 5-11-0 12-4-0 6-5-0 18-3-0 5-11-0 6-5-2 6-5-2 12-1-15 5-8-13 18-3-0 6-1-1 1-7-08-11-39-1-01-11-122-8-126-2-714.00 12 6.00 12 Plate Offsets (X,Y)-- [2:0-9-0,0-1-12], [3:0-5-8,0-2-4], [4:Edge,0-1-5] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.87 0.32 0.32 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.11 0.07 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 87 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-8,4-5: 2x4 SPF-S Stud, 2-8: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-14 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-6, 2-8 REACTIONS.(lb/size)5=718/0-5-8, 8=718/0-5-8 Max Horz 8=234(LC 5) Max Uplift 5=-8(LC 6), 8=-6(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-410/364, 2-3=-519/122, 3-4=-935/68, 1-8=-391/315, 4-5=-713/112 BOT CHORD 7-8=-213/655, 6-7=-177/531 WEBS 2-7=-12/462, 3-6=-31/347, 2-8=-671/0, 4-6=-109/424 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 5, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 8. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T16 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307454 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:39 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-c2FpTTvKUGJMGSlaK3UXOLViWpLgMFi6UZZpqCyk_zQ Scale = 1:60.3 1 2 3 4 5 6 12 11 10 9 8 7 3x8 4x8 4x6 3x8 5x6 5x6 4x10 4x6 4x8 4x10 4x6 4x6 5-11-0 5-11-0 7-6-14 1-7-14 11-0-3 3-5-6 12-4-0 1-3-13 18-3-0 5-11-0 5-11-0 5-11-0 7-6-14 1-7-14 11-0-3 3-5-6 12-4-0 1-3-13 18-3-0 5-11-0 1-7-010-3-310-5-01-11-122-8-127-6-714.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0], [4:0-3-3,0-2-0], [7:0-2-13,Edge], [10:0-2-8,0-2-0], [12:0-2-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.88 0.36 0.62 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.09 0.10 (loc) 7-8 11-12 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 108 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-12,6-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-12, 5-7 REACTIONS.(lb/size)12=718/0-5-8, 7=718/0-5-8 Max Horz 12=266(LC 5) Max Uplift 12=-16(LC 7), 7=-18(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-431/303, 2-3=-729/229, 3-4=-435/128, 4-5=-716/242, 5-6=-357/289, 1-12=-407/262, 6-7=-349/249 BOT CHORD 11-12=-220/621, 10-11=-183/538, 9-10=-129/436, 8-9=-47/508, 7-8=-68/580 WEBS 2-11=-34/372, 2-10=-375/244, 3-10=-210/403, 4-9=-177/386, 5-9=-331/218, 5-8=0/346, 2-12=-620/0, 5-7=-659/124 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 12, 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T17 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307455 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:40 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-4EpBgpwyFZRDucKmtn?mwY2tRCg?5i0GjDIMMfyk_zP Scale = 1:67.9 1 2 3 4 5 6 12 11 10 9 8 7 3x8 4x8 4x6 3x8 5x6 5x6 3x12 3x4 4x8 4x10 4x6 4x6 5-11-0 5-11-0 8-8-9 2-9-9 9-10-8 1-1-15 12-4-0 2-5-8 18-3-0 5-11-0 5-11-0 5-11-0 8-8-9 2-9-9 9-10-8 1-1-15 12-4-0 2-5-8 18-3-0 5-11-0 1-7-011-7-311-9-01-11-122-8-128-10-714.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0], [4:0-3-3,0-2-0], [7:0-2-13,Edge], [12:0-2-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.86 0.35 0.61 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.03 -0.09 0.10 (loc) 7-8 7-8 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 113 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-12,6-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-9, 2-12, 5-7 REACTIONS.(lb/size)12=718/0-5-8, 7=718/0-5-8 Max Horz 12=299(LC 5) Max Uplift 12=-28(LC 7), 7=-30(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-425/304, 2-3=-657/198, 3-4=-378/143, 4-5=-656/217, 5-6=-363/299, 1-12=-401/265, 6-7=-354/257 BOT CHORD 11-12=-219/631, 10-11=-181/541, 9-10=-97/373, 8-9=-35/503, 7-8=-53/581 WEBS 2-11=-37/399, 2-10=-379/218, 3-10=-144/319, 4-9=-152/358, 5-9=-339/188, 5-8=0/366, 2-12=-632/0, 5-7=-654/103 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 12, 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T18 Truss Type Roof Special Qty 3 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307456 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:41 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-YRNau9xa0tZ4VmvyRUW?Tma22c0bq6iPyt2wv5yk_zO Scale = 1:76.1 1 2 3 4 5 9 8 7 6 3x8 4x6 3x8 6x6 5x12 3x12 3x6 4x6 3x6 5-11-0 5-11-0 12-4-0 6-5-0 18-3-0 5-11-0 5-11-0 5-11-0 9-3-9 3-4-9 12-4-0 3-0-7 18-3-0 5-11-0 1-7-012-5-21-11-122-8-1214.00 12 6.00 12 Plate Offsets (X,Y)-- [7:0-6-4,0-2-12], [9:0-2-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.87 0.33 0.78 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.05 -0.15 0.11 (loc) 7-8 7-8 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 97 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-9,5-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-11-12 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-7, 2-9, 4-6 REACTIONS.(lb/size)9=718/0-5-8, 6=718/0-5-8 Max Horz 9=315(LC 5) Max Uplift 9=-35(LC 7), 6=-38(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-416/310, 2-3=-499/151, 3-4=-878/320, 4-5=-355/307, 1-9=-396/269, 5-6=-349/264 BOT CHORD 8-9=-212/640, 7-8=-177/546, 6-7=-44/595 WEBS 2-8=-15/455, 2-7=-374/192, 3-7=-334/813, 4-7=-195/395, 2-9=-651/0, 4-6=-674/90 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 9, 6 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 9, 6. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T19 Truss Type Piggyback Base Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307457 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:41 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-YRNau9xa0tZ4VmvyRUW?Tma24c0CqBePyt2wv5yk_zO Scale = 1:55.7 1 2 3 4 5 11 10 9 8 7 6 6x6 5x10 MT18HS 4x8 6x6 3x4 3x6 3x4 3x8 3x6 3x4 3x6 7-5-13 7-5-13 13-11-13 6-6-0 19-10-11 5-10-13 26-0-0 6-1-5 7-5-13 7-5-13 13-11-13 6-6-0 19-10-11 5-10-13 26-0-0 6-1-5 4-1-49-1-21-1-09-1-28.00 12 Plate Offsets (X,Y)-- [2:0-6-0,0-1-8], [3:0-4-12,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.87 0.36 0.46 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.17 0.03 (loc) 10-11 10-11 6 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 116 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-8,1-11: 2x4 SPF No.2, 5-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-10-6 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-10 REACTIONS.(lb/size)11=1028/0-3-8, 6=1028/0-5-8 Max Horz 11=-250(LC 4) Max Uplift 11=-17(LC 6), 6=-38(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-906/155, 2-3=-774/187, 3-4=-1026/178, 4-5=-1323/130, 1-11=-949/118, 5-6=-961/105 BOT CHORD 10-11=-174/255, 8-10=-70/653, 7-8=-14/1017, 6-7=-48/303 WEBS 2-8=-100/283, 3-8=0/262, 4-8=-316/127, 1-10=-60/647, 5-7=0/721 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 6. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T20 Truss Type Piggyback Base Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307458 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:42 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0dxy5VxCnBhx7wU9?C1E?z7Ei0MQZe?ZBXnTRXyk_zN Scale = 1:56.2 1 2 3 4 5 6 12 11 10 9 8 7 6x6 5x10 MT18HS 4x8 3x4 3x6 3x4 3x8 3x6 3x6 12x12 7-5-13 7-5-13 13-11-13 6-6-0 19-10-11 5-10-13 26-0-0 6-1-5 7-5-13 7-5-13 13-11-13 6-6-0 19-10-11 5-10-13 26-0-0 6-1-5 26-11-0 0-11-0 4-1-49-1-21-1-09-1-28.00 12 Plate Offsets (X,Y)-- [2:0-6-0,0-1-8], [3:0-4-12,0-2-0], [7:Edge,0-10-2], [7:0-1-12,0-0-0], [8:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.75 0.36 0.45 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.17 0.03 (loc) 11-12 11-12 7 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 MT18HS Weight: 117 lb FT = 20% GRIP 169/123 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-9,1-12: 2x4 SPF No.2, 5-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-10-10 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 2-11 REACTIONS.(lb/size)12=1027/0-3-8, 7=1093/0-5-8 Max Horz 12=-261(LC 4) Max Uplift 12=-17(LC 6), 7=-71(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-905/155, 2-3=-772/186, 3-4=-1024/178, 4-5=-1316/130, 1-12=-948/118, 5-7=-1026/140 BOT CHORD 11-12=-165/266, 9-11=-62/652, 8-9=0/1012, 7-8=-18/271 WEBS 2-9=-100/281, 3-9=0/262, 4-9=-311/127, 1-11=-60/646, 5-8=0/748 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) All plates are MT20 plates unless otherwise indicated. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 12, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T21 Truss Type Piggyback Base Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307459 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:43 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-UpVKJryqYUpnl43LZvYTYBgMxQh5I6tiPBX0zzyk_zM Scale = 1:62.3 1 2 3 4 5 6 11 10 9 8 7 12 13 3x6 6x6 4x8 3x6 3x6 3x6 3x4 3x4 6x8 6x6 3x6 7-6-8 7-6-8 14-10-8 7-4-0 18-6-8 3-8-0 -1-3-8 1-3-8 7-6-8 7-6-8 14-10-8 7-4-0 18-6-8 3-8-0 1-1-011-0-09-1-1211-0-08.00 12 Plate Offsets (X,Y)-- [5:0-4-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.91 0.39 0.41 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.07 -0.19 0.11 (loc) 8-9 8-9 13 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 103 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 4-9,4-8,2-9: 2x3 SPF No.2, 2-11: 2x4 SPF-S Stud OTHERS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-15 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-8, 5-7 REACTIONS.(lb/size)11=819/0-3-8, 13=703/0-3-8 Max Horz 11=313(LC 5) Max Uplift 11=-43(LC 6), 13=-95(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-858/48, 4-5=-384/102, 7-12=-87/710, 6-12=-87/710, 2-11=-746/104 BOT CHORD 9-11=-278/326, 8-9=-108/613 WEBS 4-9=0/290, 4-8=-505/157, 5-8=-89/470, 5-7=-716/131, 2-9=0/290, 6-13=-710/100 NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Bearing at joint(s) 13 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 13. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T22 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307460 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:44 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-y02iWAzSJoxeMEeX6d3i5OCXMqxH1RMrerGaVQyk_zL Scale = 1:79.7 1 2 3 4 5 6 7 8 9 10 18 17 16 15 14 13 12 11 5x6 3x6 3x6 3x6 3x8 3x4 3x4 3x6 4x6 5x12 6x10 3x4 3x4 12x12 6x8 11-3-0 11-3-0 18-0-11 6-9-11 28-4-12 10-4-1 31-8-0 3-3-4 42-11-0 11-3-0 -0-11-0 0-11-0 5-8-12 5-8-12 11-3-0 5-6-4 18-0-11 6-9-11 24-10-5 6-9-11 31-8-0 6-9-11 37-2-4 5-6-4 42-11-0 5-8-12 1-1-08-4-118-7-01-1-08-4-118.00 12 Plate Offsets (X,Y)-- [2:Edge,0-3-8], [2:0-1-12,0-1-3], [8:0-5-4,0-1-0], [13:0-0-0,0-1-12], [14:0-1-12,0-3-4], [15:0-2-8,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.93 0.78 0.91 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.28 -0.70 0.04 (loc) 11-12 11-12 11 l/defl >619 >245 n/a L/d 240 180 n/a PLATES MT20 Weight: 185 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-17,7-15,2-18,10-11: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-3-8 oc purlins, except end verticals, and 2-0-0 oc purlins (5-11-5 max.): 4-8. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 12-14. WEBS 1 Row at midpt 7-14, 8-14 REACTIONS.(lb/size)14=1997/0-3-8, 18=1096/0-3-8, 11=381/0-3-8 Max Horz 18=210(LC 5) Max Uplift 14=-119(LC 5), 18=-66(LC 6), 11=-42(LC 7) Max Grav 14=1997(LC 1), 18=1107(LC 10), 11=415(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-702/13, 3-4=-1103/170, 4-5=-853/180, 5-7=-763/172, 7-8=-67/342, 9-10=-638/9, 2-18=-524/77, 10-11=-416/43 BOT CHORD 17-18=-187/995, 15-17=-132/763 WEBS 4-17=0/312, 5-15=-533/172, 7-15=-90/920, 7-14=-1219/270, 8-14=-792/94, 8-12=-13/368, 9-12=-313/154, 3-18=-728/159, 9-11=0/474 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 18, 11 except (jt=lb) 14=119. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T23 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307461 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:45 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-QCc4jW_5464V_NCkgKaxdclmADLPmyW?tV072syk_zK Scale = 1:79.2 1 2 3 4 5 6 7 8 9 10 11 12 21 20 19 18 17 16 15 14 13 3x6 5x6 5x6 3x6 3x6 3x6 3x6 3x4 3x8 3x4 4x6 4x6 4x8 3x6 3x4 3x4 4x10 4x8 3x6 3x6 7-5-12 7-5-12 14-9-0 7-3-4 19-2-11 4-5-11 28-2-0 8-11-5 28-6-8 0-4-8 35-5-4 6-10-12 42-11-0 7-5-12 -0-11-0 0-11-0 7-5-12 7-5-12 14-9-0 7-3-4 19-2-11 4-5-11 23-8-5 4-5-11 28-2-0 4-5-11 33-0-3 4-10-3 37-10-5 4-10-3 42-11-0 5-0-11 1-1-010-8-1110-11-01-1-010-8-118.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.67 0.53 0.66 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.36 0.03 (loc) 16-17 16-17 13 l/defl >999 >931 n/a L/d 240 180 n/a PLATES MT20 Weight: 220 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 5-19,6-19,6-17,7-17,7-16,8-16: 2x4 SPF No.2, 2-21: 2x6 SPF No.2 12-13: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-2 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-8. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 4-19, 6-17, 7-16, 8-16, 9-16 REACTIONS.(lb/size)21=1066/0-3-8, 16=2076/0-3-8, 13=331/0-3-8 Max Horz 21=265(LC 5) Max Uplift 21=-84(LC 6), 16=-7(LC 7), 13=-43(LC 7) Max Grav 21=1089(LC 10), 16=2076(LC 1), 13=375(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-1292/137, 4-5=-880/193, 5-6=-634/207, 6-7=-486/187, 7-8=0/318, 8-9=0/462, 10-12=-331/80, 2-21=-1014/152, 12-13=-281/78 BOT CHORD 20-21=-259/357, 19-20=-184/975, 17-19=-141/486 WEBS 4-19=-444/147, 6-19=-80/386, 6-17=-588/116, 7-17=-30/798, 7-16=-1101/168, 8-16=-493/29, 9-16=-478/155, 9-14=-33/379, 10-14=-252/134, 2-20=0/623 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 21, 16, 13. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T24 Truss Type Piggyback Base Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307462 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:47 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Nakr8C?LcjKDDhM6oldPi1q2N1?mEtfIKpVE6lyk_zI Scale = 1:83.1 1 2 3 4 5 6 7 8 9 10 11 12 21 20 19 18 17 16 15 14 13 3x6 5x6 5x6 3x6 3x6 3x4 3x4 3x6 3x8 3x4 12x20 3x4 3x4 5x8 3x4 12x12 4x6 3x6 8-3-8 8-3-8 16-4-8 8-1-0 26-6-8 10-2-0 28-4-12 1-10-4 35-6-10 7-1-14 42-11-0 7-4-6 -0-11-0 0-11-0 5-7-3 5-7-3 10-11-13 5-4-11 16-4-8 5-4-11 21-5-8 5-1-0 26-6-8 5-1-0 31-11-3 5-4-11 37-3-13 5-4-11 42-11-0 5-7-3 1-1-012-0-01-1-012-0-08.00 12 Plate Offsets (X,Y)-- [2:Edge,0-3-8], [2:0-1-12,0-1-3], [6:0-3-12,0-2-0], [8:0-3-12,0-2-0], [16:0-0-0,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.95 0.60 0.62 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.20 -0.53 0.06 (loc) 17-18 17-18 13 l/defl >999 >635 n/a L/d 240 180 n/a PLATES MT20 Weight: 220 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 6-18,7-18,7-17,8-17,9-15: 2x4 SPF No.2, 2-21,12-13: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-11 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 6-8. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing, Except: 6-0-0 oc bracing: 15-17. WEBS 1 Row at midpt 5-18, 7-17, 8-17, 9-15, 4-21 REACTIONS.(lb/size)15=1619/0-3-8, 21=1221/0-3-8, 13=634/0-3-8 Max Horz 21=292(LC 5) Max Uplift 15=-33(LC 7), 21=-80(LC 6), 13=-33(LC 7) Max Grav 15=1619(LC 1), 21=1221(LC 1), 13=649(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-490/93, 4-5=-1375/195, 5-6=-960/217, 6-7=-725/217, 7-8=-256/179, 8-9=-403/171, 9-10=-643/144, 10-12=-416/113, 2-21=-454/123, 12-13=-343/101 BOT CHORD 20-21=-197/1150, 18-20=-156/979, 17-18=-119/552, 15-17=-402/159, 14-15=0/307, 13-14=0/551 WEBS 5-20=-32/340, 5-18=-457/172, 6-18=-10/261, 7-18=-41/443, 7-17=-782/150, 9-17=-54/1155, 9-15=-1661/167, 9-14=-57/392, 4-21=-1065/61, 10-13=-362/0 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15, 21, 13. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T25 Truss Type Half Hip Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307463 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:47 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Nakr8C?LcjKDDhM6oldPi1qDn17tE0_IKpVE6lyk_zI Scale = 1:21.8 1 2 3 4 7 6 5 4x8 2x4 3x4 2x4 2x4 3x4 1-10-5 1-10-5 4-0-0 2-1-11 -0-11-0 0-11-0 1-10-5 1-10-5 4-0-0 2-1-11 1-7-03-7-33-9-03-7-314.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.22 0.08 0.02 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 21 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=113(LC 5) Max Uplift 5=-54(LC 5), 7=-16(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T26 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307464 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:48 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-rnIDMY0zN1S4rrxJLS8eFENN_RSAzSRRZTEneByk_zH Scale = 1:28.6 1 2 3 4 7 6 5 4x8 2x4 3x6 3x4 2x4 3x6 3-0-0 3-0-0 4-0-0 1-0-0 -0-11-0 0-11-0 3-0-0 3-0-0 4-0-0 1-0-0 1-7-04-11-35-1-04-11-314.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.32 0.14 0.07 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.01 -0.01 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 25 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=154(LC 5) Max Uplift 5=-87(LC 5), 7=-17(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T27 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307465 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:49 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-JzsbZu1b8KaxT?WVvAftoSwXqro4iuhbo7_LBdyk_zG Scale = 1:31.3 1 2 3 4 7 6 5 5x6 2x4 3x6 3x4 2x4 3x4 2-0-0 2-0-0 4-0-0 2-0-0 -0-11-0 0-11-0 3-5-7 3-5-7 4-0-0 0-6-9 1-7-05-5-85-7-55-5-814.00 12 Plate Offsets (X,Y)-- [3:0-3-10,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.37 0.16 0.14 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 27 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=170(LC 5) Max Uplift 5=-103(LC 5), 7=-29(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7 except (jt=lb) 5=103. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T28 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307466 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:51 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FM_M_a2sgyqfiIgt1bhLtt?vLeVSAqptFRTRFWyk_zE Scale = 1:24.5 1 2 3 4 7 6 5 4x8 2x4 3x6 3x4 2x4 3x4 2-3-11 2-3-11 4-0-0 1-8-5 -0-11-0 0-11-0 2-3-11 2-3-11 4-0-0 1-8-5 1-7-04-1-84-3-54-1-814.00 12 Plate Offsets (X,Y)-- [3:0-5-3,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.24 0.10 0.03 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 23 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=129(LC 5) Max Uplift 5=-66(LC 5), 7=-10(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T29 Truss Type Roof Special Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307467 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:52 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-jYXkBv3URFyWKSF4aICaP4Yvg2kAvBg1U5C?oyyk_zD Scale = 1:50.8 1 2 3 4 5 6 7 13 12 11 10 9 8 5x8 4x6 5x6 5x6 4x6 3x4 3x6 3x8 3x4 4x8 3x6 5x8 2x4 6-8-10 6-8-10 14-9-0 8-0-6 23-2-8 8-5-8 25-10-8 2-8-0 6-8-10 6-8-10 10-8-13 4-0-3 14-9-0 4-0-3 18-11-12 4-2-12 23-2-8 4-2-12 25-9-8 2-7-0 25-10-8 0-1-0 4-1-48-4-112-9-08-7-02-9-08-4-118.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-14] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.91 0.52 0.44 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.31 0.03 (loc) 9-10 9-10 8 l/defl >999 >997 n/a L/d 240 180 n/a PLATES MT20 Weight: 123 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 *Except* 4-6: 2x6 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-13,7-8: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 5-9-6 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-4, 6-7. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-12, 3-10 REACTIONS.(lb/size)13=1023/0-3-8, 8=1023/Mechanical Max Horz 13=-235(LC 4) Max Uplift 13=-13(LC 6), 8=-37(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-870/148, 2-3=-642/169, 3-4=-819/173, 4-5=-1044/175, 5-6=-1201/162, 6-7=-927/79, 1-13=-959/112, 7-8=-1022/66 BOT CHORD 10-12=-82/782, 9-10=-18/954 WEBS 3-12=-388/136, 4-10=-9/325, 6-9=-797/135, 7-9=-55/1285, 1-12=-48/680 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T30 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307468 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:53 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Bk56PF46BZ4NycqG80kpyI4CUS9eejeAilyYKOyk_zC Scale = 1:30.3 1 2 3 4 7 6 5 6x10 3x4 3x4 2x4 3x6 3-3-8 3-3-8 4-0-0 0-8-8 -0-11-0 0-11-0 3-3-8 3-3-8 4-0-0 0-8-8 1-7-05-5-114.00 12 Plate Offsets (X,Y)-- [3:Edge,0-1-12], [4:0-1-4,0-0-0], [5:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.40 0.19 0.08 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 22 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-5-8 Max Horz 7=169(LC 5) Max Uplift 5=-104(LC 5), 7=-27(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7 except (jt=lb) 5=104. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T31 Truss Type Common Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307469 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:53 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Bk56PF46BZ4NycqG80kpyI4CrS8Xej1AilyYKOyk_zC Scale = 1:32.5 1 2 3 6 5 4 5x12 3x4 3x4 2x4 3x4 2-0-0 2-0-0 4-0-0 2-0-0 -0-11-0 0-11-0 3-7-12 3-7-12 4-0-0 0-4-4 1-7-05-10-15-5-114.00 12 *** Design Problems *** REVIEW REQUIRED Analog warning - check design Plate Offsets (X,Y)-- [3:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.44 0.19 0.11 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.01 -0.01 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 24 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 3-5: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)6=221/0-5-8, 4=139/Mechanical Max Horz 6=186(LC 5) Max Uplift 6=-48(LC 4), 4=-123(LC 5) Max Grav 6=221(LC 1), 4=152(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6 except (jt=lb) 4=123. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T32 Truss Type Roof Special Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307470 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:54 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-fxfUcb5kytCEZmPSijF2VVdG8sQrN?9KxPh6sryk_zB Scale = 1:49.4 1 2 3 6 5 4 6x10 3x6 4x6 3x6 3x4 6x6 9-2-6 9-2-6 11-10-0 2-7-10 9-2-6 9-2-6 11-10-0 2-7-10 4-11-07-2-108-11-113.00 12 8.00 12 Plate Offsets (X,Y)-- [1:0-3-0,0-2-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.85 0.51 0.76 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.14 -0.33 -0.00 (loc) 5-6 5-6 4 l/defl >999 >422 n/a L/d 240 180 n/a PLATES MT20 Weight: 59 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-6: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=463/Mechanical, 6=463/0-3-8 Max Horz 6=258(LC 5) Max Uplift 4=-74(LC 6), 6=-98(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-268/107, 1-6=-367/145 WEBS 2-5=0/286, 2-4=-578/183 NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 3) Refer to girder(s) for truss to truss connections. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 6. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T33 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307471 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:55 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-87Dsqx6MjAK4BwzfGQmH1jAZlFtH6daTA3RfOHyk_zA Scale = 1:28.9 1 2 3 6 5 4 4x6 2x4 2x4 3x8 5x8 6x6 2-7-0 2-7-0 3-6-8 0-11-8 2-7-0 2-7-0 3-6-8 0-11-8 2-1-75-1-91-8-10-3-84-10-15-1-914.00 12 Plate Offsets (X,Y)-- [1:Edge,0-1-5], [2:0-4-8,0-1-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.35 0.05 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 5-6 5-6 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 25 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 3-6-8 oc purlins, except end verticals, and 2-0-0 oc purlins: 2-3. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)4=-2/Mechanical, 6=23/Mechanical, 1=125/Mechanical, 3=118/Mechanical Max Horz 6=39(LC 5), 1=105(LC 5) Max Uplift 4=-12(LC 2), 1=-10(LC 6), 3=-38(LC 5) Max Grav 6=43(LC 2), 1=125(LC 1), 3=118(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 1, 3. 6) Non Standard bearing condition. Review required. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Gap between inside of top chord bearing and first diagonal or vertical web shall not exceed 0.500in. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T34 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307472 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:56 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:ErDeBhooCW6W7KTmKQR8snz73g9-cJnF1H6_UUSxp4Yrp8HWawifpf6JrtkcPjACxjyk_z9 Scale = 1:70.2 1 2 3 4 5 6 7 8 910 15 14 13 12 11 3x6 4x6 6x6 3x6 3x6 3x8 3x6 3x4 3x6 3x6 5x8 5x8 3x6 9-3-11 9-3-11 13-11-5 4-7-9 23-3-0 9-3-11 -1-0-0 1-0-0 4-9-2 4-9-2 9-3-11 4-6-10 13-11-5 4-7-9 18-5-14 4-6-10 23-3-0 4-9-2 24-3-0 1-0-0 1-7-012-5-51-7-012-5-514.00 12 Plate Offsets (X,Y)-- [5:0-3-2,0-2-0], [6:0-3-0,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.65 0.51 0.88 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.15 -0.39 0.02 (loc) 11-12 11-12 11 l/defl >999 >713 n/a L/d 240 180 n/a PLATES MT20 Weight: 138 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 4-13,7-12,4-15,7-11: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 5-6. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 4-13, 6-13, 7-12 REACTIONS.(lb/size)15=987/0-3-8, 11=987/0-3-8 Max Horz 15=-314(LC 4) Max Uplift 15=-46(LC 6), 11=-46(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-4=-412/155, 4-5=-764/217, 5-6=-432/199, 6-7=-764/217, 7-9=-413/155, 2-15=-418/176, 9-11=-419/176 BOT CHORD 13-15=-167/496, 12-13=-36/431, 11-12=0/496 WEBS 5-13=-80/290, 6-12=-96/290, 4-15=-566/108, 7-11=-565/109 NOTES-(7-8) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 15, 11. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T35 Truss Type Piggyback Base Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307473 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:57 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-4WLdFd7cFoaoQD71Nrol68Fp73SmaSEmdNwmT9yk_z8 Scale = 1:71.1 1 2 3 4 5 6 11 10 9 8 7 6x10 4x10 3x6 3x6 3x4 3x8 5x12 3x6 5x12 8-11-2 8-11-2 14-3-14 5-4-11 23-3-0 8-11-2 -1-0-0 1-0-0 8-11-2 8-11-2 14-3-14 5-4-11 23-3-0 8-11-2 24-3-0 1-0-0 1-7-012-0-01-7-012-0-014.00 12 Plate Offsets (X,Y)-- [2:0-5-8,0-1-8], [3:0-6-4,0-1-0], [4:0-6-4,0-1-0], [5:0-5-8,0-1-8], [7:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.74 0.49 0.36 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.28 0.02 (loc) 9-11 9-11 7 l/defl >999 >960 n/a L/d 240 180 n/a PLATES MT20 Weight: 127 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 2-11,5-7: 2x6 SPF No.2, 2-9,5-8: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-4 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 9-6-15 oc bracing. WEBS 1 Row at midpt 3-8 REACTIONS.(lb/size)11=985/0-3-8, 7=985/0-3-8 Max Horz 11=304(LC 5) Max Uplift 11=-48(LC 6), 7=-48(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-898/156, 3-4=-448/208, 4-5=-898/156, 2-11=-889/153, 5-7=-889/153 BOT CHORD 9-11=-369/450, 8-9=-108/448, 7-8=-176/354 WEBS 3-9=0/256, 4-8=-58/256, 2-9=-179/396, 5-8=-184/399 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) The Fabrication Tolerance at joint 3 = 12%, joint 4 = 16% 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T36 Truss Type Piggyback Base Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307474 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:58 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Yiv?Sz8F05if2NiExZJ_fLoztTo?JvUvs1fJ?cyk_z7 Scale = 1:71.1 1 2 3 4 5 6 11 10 9 8 7 6x10 4x10 3x6 3x6 3x4 3x8 5x12 3x6 5x12 8-11-2 8-11-2 14-3-14 5-4-11 23-3-0 8-11-2 -1-0-0 1-0-0 8-11-2 8-11-2 14-3-14 5-4-11 23-3-0 8-11-2 24-3-0 1-0-0 1-7-012-0-01-7-012-0-014.00 12 Plate Offsets (X,Y)-- [2:0-5-8,0-1-8], [3:0-6-4,0-1-0], [4:0-6-4,0-1-0], [5:0-5-8,0-1-8], [7:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.74 0.49 0.36 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.11 -0.28 0.02 (loc) 9-11 9-11 7 l/defl >999 >960 n/a L/d 240 180 n/a PLATES MT20 Weight: 127 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 2-11,5-7: 2x6 SPF No.2, 2-9,5-8: 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-9-4 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 9-6-15 oc bracing. WEBS 1 Row at midpt 3-8 REACTIONS.(lb/size)11=985/0-3-8, 7=985/0-3-8 Max Horz 11=304(LC 5) Max Uplift 11=-48(LC 6), 7=-48(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-898/156, 3-4=-448/208, 4-5=-898/156, 2-11=-889/153, 5-7=-889/153 BOT CHORD 9-11=-369/450, 8-9=-108/448, 7-8=-176/354 WEBS 3-9=0/256, 4-8=-58/256, 2-9=-179/396, 5-8=-184/399 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) The Fabrication Tolerance at joint 3 = 12%, joint 4 = 16% 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 11, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T37 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307475 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:17:59 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0uSNfJ9tnPqWgXHQVGqDBZKGBtAH2Go35hPsX2yk_z6 Scale = 1:36.3 1 2 3 4 5 6 10 9 8 7 5x12 5x8 5x8 5x12 3x4 3x6 3x4 3x6 3-3-4 3-3-4 9-7-12 6-4-7 12-11-0 3-3-4 -0-11-0 0-11-0 4-0-0 4-0-0 8-11-0 4-11-0 12-11-0 4-0-0 13-10-0 0-11-0 1-7-06-3-01-7-02-2-134-0-314.00 12 9.00 12 Plate Offsets (X,Y)-- [3:0-9-4,0-2-0], [4:0-5-0,0-2-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.25 0.30 0.74 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.06 -0.16 0.10 (loc) 8-9 8-9 7 l/defl >999 >932 n/a L/d 240 180 n/a PLATES MT20 Weight: 64 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-10,5-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)10=569/0-3-8, 7=569/0-3-8 Max Horz 10=-166(LC 4) Max Uplift 10=-34(LC 6), 7=-34(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 3-4=-378/78, 2-10=-265/233, 5-7=-263/235 BOT CHORD 9-10=-179/591, 8-9=-132/377, 7-8=-54/593 WEBS 3-9=-38/492, 4-8=-24/495, 3-10=-723/0, 4-7=-728/94 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 10, 7 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 10, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T38 Truss Type Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307476 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:00 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-U50ltf9VYjyNHhsc2_MSkmtNaGW0njlCJL8Q4Uyk_z5 Scale = 1:49.5 1 2 3 4 5 6 7 13 12 11 10 9 8 3x6 4x6 6x6 5x6 5x6 3x12 3x8 3x4 3x12 3x6 3x6 3x6 4-1-0 4-1-0 5-9-0 1-8-0 6-8-0 0-11-0 8-4-0 1-8-0 12-8-0 4-4-0 4-1-0 4-1-0 5-9-0 1-8-0 6-8-0 0-11-0 8-4-0 1-8-0 12-8-0 4-4-0 13-7-0 0-11-0 1-10-148-7-61-7-00-0-63-0-65-6-1014.00 12 9.00 12 Plate Offsets (X,Y)-- [3:0-3-2,0-2-0], [4:0-2-11,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.47 0.27 0.75 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.06 0.10 (loc) 9 9 8 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 78 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 1-13,6-8: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)13=492/Mechanical, 8=561/0-3-8 Max Horz 13=-235(LC 4) Max Uplift 13=-24(LC 7), 8=-33(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-268/185, 2-3=-500/102, 3-4=-300/65, 4-5=-501/101, 5-6=-273/233, 1-13=-262/164, 6-8=-333/239 BOT CHORD 12-13=-191/522, 11-12=-140/405, 10-11=-60/285, 9-10=-19/418, 8-9=-36/542 WEBS 2-12=-68/328, 2-11=-252/159, 4-10=-64/252, 5-10=-308/112, 5-9=0/366, 2-13=-567/0, 5-8=-583/64 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Bearing at joint(s) 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 13, 8. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T39 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307477 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:01 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yHa84_A7J05EvrRochthH_PSSgqFWI5MY?uzcxyk_z4 Scale = 1:53.4 1 2 3 6 5 4 3x6 4x10 3x8 3x6 3x8 2x4 3-6-12 3-6-12 7-1-8 3-6-12 6-5-8 6-5-8 7-1-8 0-8-0 1-7-09-1-714.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.84 0.40 0.24 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.04 0.00 (loc) 4-5 4-5 4 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 39 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 *Except* 2-3: 2x6 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF No.2 *Except* 2-5: 2x3 SPF No.2, 1-6: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-4 REACTIONS.(lb/size)4=273/Mechanical, 6=273/0-3-8 Max Horz 6=261(LC 5) Max Uplift 4=-152(LC 5), 6=-36(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-6=-267/126 NOTES-(8-9) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 6 except (jt=lb) 4=152. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 9) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss T40 Truss Type Half Hip Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307478 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:01 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yHa84_A7J05EvrRochthH_PZdgucWLsMY?uzcxyk_z4 Scale = 1:29.6 1 2 3 4 7 6 5 4x6 3x6 2x4 3x4 2x4 3x6 3-2-1 3-2-1 4-0-0 0-9-15 -0-11-0 0-11-0 3-2-1 3-2-1 4-0-0 0-9-15 1-7-05-3-714.00 12 Plate Offsets (X,Y)-- [3:0-4-8,0-1-12], [4:Edge,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.38 0.18 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.02 -0.02 0.00 (loc) 6-7 6-7 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 22 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 *Except* 2-7: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=141/Mechanical, 7=223/0-3-8 Max Horz 7=165(LC 5) Max Uplift 5=-100(LC 5), 7=-24(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(7-8) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 8) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG01 Truss Type Half Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307479 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:02 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-QT8WIKBl4KD5X?0?APOwpByoR4G3FnXVnfdX8Nyk_z3 Scale = 1:15.3 1 2 3 4 7 6 5 5x6 2x4 3x4 3x4 2x4 3x4 2-0-0 2-0-0 4-0-0 2-0-0 -0-11-0 0-11-0 0-9-5 0-9-5 4-0-0 3-2-11 1-7-02-4-02-5-132-4-014.00 12 Plate Offsets (X,Y)-- [3:0-3-10,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.19 0.04 0.10 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 21 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=240/Mechanical, 7=322/0-3-8 Max Horz 7=75(LC 4) Max Uplift 5=-68(LC 4), 7=-59(LC 5) Max Grav 5=244(LC 10), 7=322(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 201 lb down and 73 lb up at 2-0-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 6=-201(B) August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG02 Truss Type Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307480 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:04 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-NsGGj0C?cxTpmI9NHpQOuc12GulvjaBoEy6dDGyk_z1 Scale = 1:33.8 1 2 3 4 5 6 7 8 14 13 12 11 10 9 15 16 17 18 19 20 21 22 23 24 25 26 27 5x12 5x12 3x6 2x4 6x10 6x10 2x4 3x6 2x4 3x12 2x4 3x6 3x6 1-10-5 1-10-5 4-1-8 2-3-3 14-1-8 10-0-0 16-8-13 2-7-5 18-3-0 1-6-3 -0-11-0 0-11-0 1-10-5 1-10-5 4-1-8 2-3-3 9-1-8 5-0-0 14-1-8 5-0-0 16-8-13 2-7-5 18-3-0 1-6-3 1-7-03-7-33-9-01-11-121-10-01-9-314.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-9-10,0-2-8], [5:0-2-4,0-1-8], [7:0-9-10,0-2-8], [11:0-5-4,0-3-12], [12:0-5-4,0-3-12] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.55 0.85 0.53 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.16 -0.46 0.26 (loc) 11-12 11-12 9 l/defl >999 >474 n/a L/d 240 180 n/a PLATES MT20 Weight: 88 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 3-12,7-11: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-8-14 oc purlins, except end verticals, and 2-0-0 oc purlins (3-3-0 max.): 3-7. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)14=1085/0-5-8, 9=999/0-5-8 Max Horz 14=119(LC 12) Max Uplift 14=-287(LC 4), 9=-277(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-1043/400, 3-4=-2467/697, 4-5=-2509/720, 5-6=-2392/585, 6-7=-2366/570, 7-8=-809/264, 2-14=-1054/368, 8-9=-974/314 BOT CHORD 12-13=-302/727, 11-12=-1115/3227, 10-11=-192/583 WEBS 3-13=-479/39, 3-12=-504/2180, 4-12=-428/240, 5-12=-739/435, 5-11=-880/522, 6-11=-274/154, 7-11=-461/2137, 7-10=-593/124, 2-13=-207/656, 8-10=-234/618 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 14, 9 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 14=287, 9=277. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 77 lb down and 100 lb up at 1-10-5, 55 lb down and 63 lb up at 3-11-1, 55 lb down and 63 lb up at 5-11-1, 55 lb down and 63 lb up at 7-11-1, 55 lb down and 63 lb up at 9-4-6, 55 lb down and 63 lb up at 10-7-10, 55 lb down and 63 lb up at 12-7-10, and 55 lb down and 63 lb up at 14-7-10, and 99 lb down and 87 lb up at 16-8-13 on top chord, and 57 lb down and 26 lb up at 1-11-1, 32 lb down at 4-1-8, 32 lb down at 5-11-1, 32 lb down at 7-11-1, 32 lb down at 9-4-6, 32 lb down at 10-7-10, 32 lb down at 12-7-10, and 32 lb down at 14-7-10, and 35 lb down and 23 lb up at 16-7-10 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard Continued on page 2 August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG02 Truss Type Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307480 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:04 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-NsGGj0C?cxTpmI9NHpQOuc12GulvjaBoEy6dDGyk_z1 LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-7=-60, 7-8=-60, 12-14=-20, 11-12=-20, 9-11=-20 Concentrated Loads (lb) Vert: 3=-58(F) 7=-41(F) 12=-22(F) 13=-33(F) 10=-13(F) 15=-41(F) 16=-41(F) 17=-41(F) 18=-41(F) 19=-41(F) 20=-41(F) 21=-41(F) 22=-22(F) 23=-22(F) 24=-22(F) 25=-22(F) 26=-22(F) 27=-22(F) 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG03 Truss Type Half Hip Girder Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307481 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:04 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-NsGGj0C?cxTpmI9NHpQOuc199uySjiXoEy6dDGyk_z1 Scale = 1:15.1 1 2 3 4 6 5 7 3x4 2x4 2x4 2x4 2x4 2-6-0 2-6-0 -0-11-0 0-11-0 2-0-0 2-0-0 2-6-0 0-6-0 1-1-02-5-08.00 12 Plate Offsets (X,Y)-- [3:0-2-0,0-2-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.11 0.04 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 2-6-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)5=95/Mechanical, 6=168/0-3-8 Max Horz 6=72(LC 4) Max Uplift 5=-51(LC 4), 6=-28(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 2) Provide adequate drainage to prevent water ponding. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Refer to girder(s) for truss to truss connections. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 6. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 17 lb down and 34 lb up at 2-4-4 on top chord, and 13 lb down at 2-0-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-6=-20 Concentrated Loads (lb) Vert: 4=-17(F) 7=-6(F) August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG04 Truss Type Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307482 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:06 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-JEO07iEG8ZjX?cJmPETs_17KThUbBPA5iGbkH8yk_z? Scale = 1:79.0 1 2 3 4 5 6 7 8 9 10 11 19 18 17 16 15 14 13 12 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 5x8 3x6 8x8 4x8 4x8 4x6 3x6 4x6 4x6 6x6 3x8 4x10 4x6 10x10 5x6 4x8 7-9-0 7-9-0 18-0-14 10-3-14 28-4-12 10-3-14 35-2-0 6-9-4 42-11-0 7-9-0 -0-11-0 0-11-0 4-0-4 4-0-4 7-9-0 3-8-12 14-7-4 6-10-4 21-5-8 6-10-4 28-3-12 6-10-4 35-2-0 6-10-4 38-10-12 3-8-12 42-11-0 4-0-4 1-1-06-0-116-3-01-1-06-0-118.00 12 Plate Offsets (X,Y)-- [2:Edge,0-3-8], [2:0-1-12,0-1-3], [4:0-4-9,Edge], [8:0-3-8,0-1-8], [11:Edge,0-2-0], [11:0-1-12,0-1-3] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.83 0.58 0.89 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.19 -0.28 0.04 (loc) 16-18 16-18 15 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 216 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 *Except* 14-17: 2x6 SP 2400F 2.0E WEBS 2x4 SPF-S Stud *Except* 5-18,6-15,8-13: 2x4 SPF No.2, 2-19,11-12: 2x4 SPF 2100F 1.8E BRACING- TOP CHORD Structural wood sheathing directly applied or 3-8-5 oc purlins, except end verticals, and 2-0-0 oc purlins (4-2-4 max.): 4-9. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. WEBS 1 Row at midpt 5-18, 6-15, 8-15 REACTIONS.(lb/size)15=2932/0-3-8, 19=1615/0-3-8, 12=669/0-3-8 Max Horz 19=153(LC 12) Max Uplift 15=-1859(LC 4), 19=-765(LC 5), 12=-189(LC 6) Max Grav 15=2932(LC 1), 19=1619(LC 9), 12=684(LC 10) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-824/375, 3-4=-1814/1062, 4-5=-1501/925, 5-6=-1425/966, 6-8=-398/628, 8-9=-331/194, 9-10=-421/174, 10-11=-703/286, 2-19=-627/288, 11-12=-474/192 BOT CHORD 18-19=-870/1459, 16-18=-1169/1697, 15-16=-714/978, 13-15=-650/472, 12-13=-86/441 WEBS 4-18=-300/584, 5-18=-324/370, 5-16=-526/338, 6-16=-546/906, 6-15=-2059/1402, 8-15=-1381/860, 8-13=-643/1234, 3-19=-1120/651, 10-12=-191/277 NOTES-(9-10) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 15=1859, 19=765, 12=189. 6) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 7) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 61 lb down and 101 lb up at 8-0-12, 67 lb down and 101 lb up at 10-0-12, 67 lb down and 101 lb up at 12-0-12, 67 lb down and 101 lb up at 14-0-12, 67 lb down and 101 lb up at 16-0-12, 67 lb down and 101 lb up at 18-0-12, 67 lb down and 101 lb up at 20-0-12, 67 lb down and 101 lb up at 22-0-12, 67 lb down and 101 lb up at 24-0-12, 67 lb down and 101 lb up at 26-0-12, 67 lb down and 101 lb up at 28-0-12, 67 lb down and 101 lb up at 30-0-12, and 67 lb down and 101 lb up at 32-0-12, and 67 lb down and 101 lb up at 34-0-12 on top chord, and 118 lb down and 65 lb up at 2-0-12, 121 lb down and 66 lb up at 4-0-12, 121 lb down and 99 lb up at 6-0-12, 38 lb down and 58 lb up at 8-0-12, 38 lb down and 58 lb up at 10-0-12, 38 lb down and 58 lb up at 12-0-12, 38 lb down and 58 lb up at 14-0-12, 38 lb down and 58 lb up at 16-0-12, 38 lb down and 58 lb up at 18-0-12, 38 lb down and 58 lb up at 20-0-12, 38 lb down and 58 lb up at 22-0-12, 38 lb down and 58 lb up at 24-0-12, 38 lb down and 58 lb up at 26-0-12, 38 lb down and 58 lb up at 28-0-12, 38 lb down and 58 lb up at 30-0-12, 38 lb down and 58 lb up at 32-0-12, 38 lb down and 58 lb up at 34-0-12, 121 lb down and 115 lb up at 36-0-12, 121 lb down and 78 lb up at 38-0-12, and 121 lb down and 66 lb up at 38-10-4, and 118 lb down and 65 lb up at 40-10-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 8) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). Continued on page 2 August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG04 Truss Type Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307482 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:06 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-JEO07iEG8ZjX?cJmPETs_17KThUbBPA5iGbkH8yk_z? 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-4=-60, 4-9=-60, 9-11=-60, 12-19=-20 Concentrated Loads (lb) Vert: 17=-19(F) 16=-19(F) 8=-46(F) 20=-46(F) 21=-46(F) 22=-46(F) 23=-46(F) 24=-46(F) 25=-46(F) 26=-46(F) 27=-46(F) 28=-46(F) 29=-46(F) 30=-46(F) 31=-46(F) 32=-46(F) 33=-118(F) 34=-121(F) 35=-121(F) 36=-19(F) 37=-19(F) 38=-19(F) 39=-19(F) 40=-19(F) 41=-19(F) 42=-19(F) 43=-19(F) 44=-19(F) 45=-19(F) 46=-19(F) 47=-19(F) 48=-121(F) 49=-121(F) 50=-121(F) 51=-118(F) 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG05 Truss Type Half Hip Girder Qty 2 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307483 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:07 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-nRxPL2FuusrOdmuyzy_5WFfe55zGw3XEwwLIpayk_z_ Scale = 1:14.9 1 2 3 4 7 6 5 8 9 5x6 2x4 3x4 3x4 2x4 3x4 2-0-0 2-0-0 4-0-0 2-0-0 -0-11-0 0-11-0 0-8-9 0-8-9 4-0-0 3-3-7 1-7-02-3-32-5-02-3-314.00 12 Plate Offsets (X,Y)-- [3:0-3-10,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.19 0.04 0.05 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 -0.00 (loc) 6 6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 20 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 4-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins: 3-4. BOT CHORD Structural wood sheathing directly applied or 6-0-0 oc bracing. REACTIONS.(lb/size)5=133/Mechanical, 7=190/0-3-8 Max Horz 7=73(LC 4) Max Uplift 5=-52(LC 4), 7=-90(LC 5) Max Grav 5=138(LC 10), 7=190(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 5, 7. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 34 lb down and 113 lb up at 0-8-9, and 43 lb down and 27 lb up at 1-11-4 on top chord, and 5 lb down and 33 lb up at 0-8-9, and 3 lb down and 16 lb up at 1-11-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 3=36(F) 6=1(F) August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG06 Truss Type Roof Special Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307484 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:08 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FdVnYOGWfAzEFwT9WfVK3SCnmVD_fIOO9a4rL1yk_yz Scale = 1:46.6 1 2 3 4 5 6 7 8 16 15 14 13 12 11 10 9 17 18 6x6 5x6 5x12 6x6 4x6 2x4 4x6 4x8 3x6 3x6 3x6 4x8 2x4 4x6 2x4 4x8 3-2-10 3-2-10 10-8-13 7-6-3 18-3-0 7-6-3 19-8-8 1-5-8 23-9-8 4-1-0 25-10-8 2-1-0 3-2-10 3-2-10 8-2-12 5-0-2 13-2-14 5-0-2 18-3-0 5-0-2 19-8-8 1-5-8 23-9-8 4-1-0 25-10-8 2-1-0 4-1-46-0-115-1-06-3-02-10-36-0-118.00 12 14.00 12 Plate Offsets (X,Y)-- [7:0-4-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.33 0.39 0.90 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.04 -0.12 0.03 (loc) 14 12-14 9 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 148 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 *Except* 5-6: 2x6 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (5-2-5 max.): 2-5, 6-7. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. WEBS 1 Row at midpt 3-15 REACTIONS.(lb/size)16=1056/0-3-8, 9=1325/Mechanical Max Horz 16=-177(LC 3) Max Uplift 16=-157(LC 4), 9=-379(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-683/151, 2-3=-550/141, 3-4=-1221/258, 4-5=-1168/315, 5-6=-1366/346, 6-7=-569/223, 7-8=-854/289, 1-16=-1046/162, 8-9=-1321/403 BOT CHORD 14-15=-306/1085, 12-14=-355/1290, 11-12=-395/1225, 10-11=-401/1230 WEBS 3-15=-840/234, 3-14=-51/351, 4-12=-291/192, 5-12=-119/506, 6-12=-223/274, 6-10=-1036/286, 7-10=-177/424, 1-15=-149/826, 8-10=-312/867 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Refer to girder(s) for truss to truss connections. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 16=157, 9=379. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 25 lb up at 1-7-4, 142 lb down and 135 lb up at 19-7-4, and 142 lb down and 135 lb up at 21-7-4, and 121 lb down and 116 lb up at 23-7-4 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-5=-60, 5-6=-60, 6-7=-60, 7-8=-60, 9-16=-20 Continued on page 2 August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG06 Truss Type Roof Special Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307484 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:08 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-FdVnYOGWfAzEFwT9WfVK3SCnmVD_fIOO9a4rL1yk_yz LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 11=-119(F) 10=-121(F) 17=25(F) 18=-119(F) 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG07 Truss Type Hip Girder Qty 1 Ply 2 3 Heritage at Spring Mill Job Reference (optional) I38307485 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:10 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-B0dXz3HmBnDyUDdXe4Xo8tH8nIui7MTgduZyPvyk_yx Scale = 1:17.9 1 2 3 4 7 6 5 8 9 10 11 12 13 14 15 3x6 4x6 4x6 3x6 2x4 2x4 6x16 3-7-12 3-7-12 7-3-8 3-7-12 0-10-0 0-10-0 6-5-8 5-7-8 7-3-8 0-10-0 1-7-02-6-111-7-02-6-1114.00 12 Plate Offsets (X,Y)-- [2:0-4-8,0-1-12], [3:0-4-8,0-1-12], [6:0-8-0,0-3-4] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.29 0.50 0.29 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.02 -0.04 0.00 (loc) 5-6 5-6 5 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 76 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 2-3. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)7=925/0-5-8, 5=1773/0-3-8 Max Horz 7=-65(LC 3) Max Uplift 7=-502(LC 3), 5=-572(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-985/426, 2-3=-1459/535, 3-4=-985/426, 1-7=-1002/427, 4-5=-1002/426 WEBS 2-6=-340/1067, 3-6=-339/1067, 1-6=-298/656, 4-6=-298/656 NOTES-(10-11) 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-7-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Unbalanced roof live loads have been considered for this design. 4) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 5) Provide adequate drainage to prevent water ponding. 6) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 7) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 7=502, 5=572. 8) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 9) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 65 lb down and 157 lb up at 0-10-0, 38 lb down and 82 lb up at 2-10-12, and 38 lb down and 82 lb up at 4-4-12, and 63 lb down and 157 lb up at 6-5-8 on top chord, and 10 lb down and 138 lb up at 0-10-0, 6 lb down and 87 lb up at 2-10-12, 1305 lb down and 391 lb up at 4-0-12, 6 lb down and 87 lb up at 4-4-12, and 1003 lb down and 49 lb up at 6-0-12, and 10 lb down and 138 lb up at 6-3-11 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Continued on page 2 August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG07 Truss Type Hip Girder Qty 1 Ply 2 3 Heritage at Spring Mill Job Reference (optional) I38307485 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:10 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-B0dXz3HmBnDyUDdXe4Xo8tH8nIui7MTgduZyPvyk_yx LOAD CASE(S) Standard Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-4=-60, 5-7=-20 Concentrated Loads (lb) Vert: 2=52(F) 3=52(F) 8=27(F) 9=27(F) 10=6(F) 12=-1305(B) 14=-1003(B) 15=6(F) 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG08 Truss Type Flat Girder Qty 1 Ply 2 3 Heritage at Spring Mill Job Reference (optional) I38307486 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:10 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-B0dXz3HmBnDyUDdXe4Xo8tHCNI?F7QygduZyPvyk_yx Scale: 1"=1' 1 2 4 3 5 2x4 3x4 2x4 4x6 2-10-0 2-10-0 2-10-0 2-10-0 1-9-15LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.06 0.02 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in -0.00 -0.00 0.00 (loc) 4 4 3 l/defl >999 >999 n/a L/d 240 180 n/a PLATES MT20 Weight: 26 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD 2-0-0 oc purlins: 1-2, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)4=103/0-3-8, 3=103/0-3-8 Max Horz 4=-42(LC 3) Max Uplift 4=-20(LC 3), 3=-20(LC 4) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(9-10) 1) 2-ply truss to be connected together with 10d (0.131"x3") nails as follows: Top chords connected as follows: 2x4 - 1 row at 0-9-0 oc. Bottom chords connected as follows: 2x6 - 2 rows staggered at 0-9-0 oc. Webs connected as follows: 2x4 - 1 row at 0-9-0 oc. 2) All loads are considered equally applied to all plies, except if noted as front (F) or back (B) face in the LOAD CASE(S) section. Ply to ply connections have been provided to distribute only loads noted as (F) or (B), unless otherwise indicated. 3) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 4) Provide adequate drainage to prevent water ponding. 5) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 4, 3. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 3 lb down at 1-2-12 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 10) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 3-4=-20 Concentrated Loads (lb) Vert: 5=-3(F) August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG14 Truss Type Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307487 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:12 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-8OlIOlJ1jOTgjXnwlVZGDINP96YsbA1z4C22Uoyk_yv Scale = 1:25.0 1 2 3 4 5 6 7 11 10 9 8 12 13 14 15 16 17 6x16 10x10 10x10 3x4 6x16 3x6 5x6 3x6 5x6 1-8-10 1-8-10 11-2-6 9-5-12 12-11-0 1-8-10 -0-11-0 0-11-0 2-0-0 2-0-0 6-5-8 4-5-8 10-11-0 4-5-8 12-11-0 2-0-0 13-10-0 0-11-0 1-7-03-11-01-7-01-0-132-10-314.00 12 9.00 12 Plate Offsets (X,Y)-- [3:0-7-0,0-3-0], [5:0-7-0,0-3-0], [8:0-2-8,0-2-8], [11:0-2-8,0-2-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.62 0.52 0.61 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.32 -0.27 -0.09 (loc) 9-10 9-10 8 l/defl >476 >562 n/a L/d 240 180 n/a PLATES MT20 Weight: 68 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x6 SPF No.2 WEBS 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals, and 2-0-0 oc purlins (6-0-0 max.): 3-5. BOT CHORD Structural wood sheathing directly applied or 6-3-6 oc bracing. REACTIONS.(lb/size)11=806/0-3-8, 8=806/0-3-8 Max Horz 11=-106(LC 3) Max Uplift 11=-579(LC 4), 8=-579(LC 3) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 2-3=-265/339, 3-4=-561/608, 4-5=-561/565, 5-6=-265/325, 2-11=-303/329, 6-8=-303/318 BOT CHORD 10-11=-1074/981, 9-10=-726/858, 8-9=-989/949 WEBS 3-10=-1300/1178, 4-10=-343/188, 4-9=-343/190, 5-9=-1283/1169, 3-11=-1224/1203, 5-8=-1224/1233 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 11, 8 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 11=579, 8=579. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 66 lb down and 82 lb up at 1-8-10, 111 lb down and 154 lb up at 2-0-12, 111 lb down and 154 lb up at 4-0-12, 111 lb down and 154 lb up at 6-0-12, 111 lb down and 154 lb up at 6-10-4, 111 lb down and 154 lb up at 8-10-4, and 111 lb down and 154 lb up at 10-10-4, and 66 lb down and 82 lb up at 11-2-6 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-2=-60, 2-3=-60, 3-5=-60, 5-6=-60, 6-7=-60, 10-11=-20, 9-10=-20, 8-9=-20 Continued on page 2 August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG14 Truss Type Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307487 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:12 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-8OlIOlJ1jOTgjXnwlVZGDINP96YsbA1z4C22Uoyk_yv LOAD CASE(S) Standard Concentrated Loads (lb) Vert: 10=-50(B) 9=-50(B) 12=-62(B) 13=-62(B) 14=-62(B) 15=-62(B) 16=-62(B) 17=-62(B) 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG15 Truss Type Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307488 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:13 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-cbJgb5JfUibXLhL6JC5VmWvbOWpLKYX7Jsoc0Eyk_yu Scale = 1:58.1 1 2 3 4 5 6 7 16 15 14 13 12 11 10 9 8 17 18 19 20 21 22 6x6 4x8 4x8 3x4 8x8 3x6 6x10 4x10 3x8 2x4 3x8 2x4 5x8 4x6 2x4 5x6 3-2-6 3-2-6 6-1-4 2-10-14 11-9-0 5-7-12 16-9-11 5-0-11 21-8-11 4-10-15 26-9-6 5-0-11 30-0-0 3-2-10 6-1-4 6-1-4 11-9-0 5-7-12 16-9-11 5-0-11 21-8-11 4-10-15 26-9-6 5-0-11 30-0-0 3-2-10 1-3-149-1-144-1-42-10-146-3-08.00 12 6.00 12 Plate Offsets (X,Y)-- [3:0-4-12,0-2-0], [6:0-6-4,0-2-0] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 NO IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.53 0.89 0.91 DEFL. Vert(LL) Vert(TL) Horz(TL) in 0.19 -0.41 0.28 (loc) 13-14 13-14 8 l/defl >999 >860 n/a L/d 240 180 n/a PLATES MT20 Weight: 141 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x4 SPF-S Stud *Except* 1-16: 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-5-5 oc purlins, except end verticals, and 2-0-0 oc purlins (4-6-6 max.): 3-6. BOT CHORD Structural wood sheathing directly applied or 5-8-15 oc bracing. WEBS 1 Row at midpt 2-13 REACTIONS.(lb/size)16=1242/0-3-8, 8=1284/0-3-8 Max Horz 16=245(LC 15) Max Uplift 16=-199(LC 5), 8=-369(LC 4) Max Grav 16=1243(LC 11), 8=1285(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. TOP CHORD 1-2=-2366/599, 2-3=-1949/603, 3-4=-1564/531, 4-5=-1317/489, 5-6=-1317/489, 6-7=-811/272, 1-16=-1304/326, 7-8=-1259/391 BOT CHORD 15-16=-321/249, 14-15=-1033/3173, 13-14=-901/2741, 11-13=-656/1610, 10-11=-656/1610, 9-10=-260/626 WEBS 2-15=-1463/404, 2-14=-382/1475, 2-13=-1287/368, 3-13=-234/741, 4-13=-212/276, 4-11=-88/273, 4-10=-469/164, 5-10=-310/128, 6-10=-449/1078, 6-9=-647/256, 1-15=-381/1665, 7-9=-379/987 NOTES-(10-11) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone; cantilever left and right exposed ; end vertical left and right exposed; Lumber DOL=1.60 plate grip DOL=1.60 3) Provide adequate drainage to prevent water ponding. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Bearing at joint(s) 16 considers parallel to grain value using ANSI/TPI 1 angle to grain formula. Building designer should verify capacity of bearing surface. 6) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) except (jt=lb) 16=199, 8=369. 7) Graphical purlin representation does not depict the size or the orientation of the purlin along the top and/or bottom chord. 8) Hanger(s) or other connection device(s) shall be provided sufficient to support concentrated load(s) 38 lb down and 58 lb up at 12-2-0, 38 lb down and 58 lb up at 14-2-0, 38 lb down and 58 lb up at 16-2-0, 38 lb down and 58 lb up at 18-2-0, 38 lb down and 58 lb up at 20-2-0, 38 lb down and 58 lb up at 22-2-0, and 38 lb down and 58 lb up at 24-2-0, and 38 lb down and 58 lb up at 26-2-0 on bottom chord. The design/selection of such connection device(s) is the responsibility of others. 9) In the LOAD CASE(S) section, loads applied to the face of the truss are noted as front (F) or back (B). 10) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 11) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). LOAD CASE(S) Standard Continued on page 2 August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss TG15 Truss Type Hip Girder Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307488 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:13 2019 Page 2 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-cbJgb5JfUibXLhL6JC5VmWvbOWpLKYX7Jsoc0Eyk_yu LOAD CASE(S) Standard 1) Dead + Roof Live (balanced): Lumber Increase=1.15, Plate Increase=1.15 Uniform Loads (plf) Vert: 1-3=-60, 3-6=-60, 6-7=-60, 14-16=-20, 8-14=-20 Concentrated Loads (lb) Vert: 12=-19(F) 13=-19(F) 17=-19(F) 18=-19(F) 19=-19(F) 20=-19(F) 21=-19(F) 22=-19(F) 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V01 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307489 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:14 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-4ns2pRKHF0jOzrwItwckIjSpWwL13BSGXWX9Ygyk_yt Scale = 1:44.9 1 2 3 4 5 8 7 63x4 6x6 3x4 2x4 2x4 2x4 2x4 2x4 12-4-13 12-4-13 6-2-7 6-2-7 12-4-13 6-2-7 0-0-47-2-130-0-414.00 12 Plate Offsets (X,Y)-- [3:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.31 0.09 0.16 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 38 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 12-4-13. (lb) - Max Horz 1=-168(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 1, 5 except 8=-172(LC 6), 6=-172(LC 7) Max Grav All reactions 250 lb or less at joint(s) 1, 5, 7 except 8=283(LC 10), 6=283(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 5 except (jt=lb) 8=172, 6=172. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V02 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307490 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:15 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-YzQQ0nLv0JrFa?VVRd7zrx?ylJegoeCPmAHj57yk_ys Scale = 1:38.4 1 2 3 44x8 6x6 4x8 2x4 10-1-6 10-1-6 5-0-11 5-0-11 10-1-6 5-0-11 0-0-45-10-130-0-414.00 12 Plate Offsets (X,Y)-- [1:0-6-10,Edge], [2:0-1-12,0-2-0], [3:0-4-11,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.41 0.26 0.13 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 28 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=211/10-1-6, 3=211/10-1-6, 4=344/10-1-6 Max Horz 1=-136(LC 4) Max Uplift 1=-15(LC 7), 3=-9(LC 6), 4=-11(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V03 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307491 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:15 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-YzQQ0nLv0JrFa?VVRd7zrx?x?JeKogHPmAHj57yk_ys Scale = 1:31.2 1 2 3 42x4 3x4 2x4 2x4 7-9-15 7-9-15 3-11-0 3-11-0 7-9-15 3-11-0 0-0-44-6-130-0-414.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.45 0.28 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 19 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=183/7-9-15, 3=183/7-9-15, 4=223/7-9-15 Max Horz 1=-105(LC 4) Max Uplift 1=-35(LC 7), 3=-29(LC 6) Max Grav 1=183(LC 1), 3=183(LC 1), 4=228(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V04 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307492 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:16 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-0A_oE7MXnd_6C84h_LeCO8XATjwcX7VZ?q0GdZyk_yr Scale = 1:22.6 1 2 3 2x4 2x4 2x4 5-6-8 5-6-8 2-9-4 2-9-4 5-6-8 2-9-4 0-0-43-2-130-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.22 0.53 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-6-8 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=204/5-6-8, 3=204/5-6-8 Max Horz 1=-72(LC 4) Max Uplift 1=-8(LC 7), 3=-8(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V05 Truss Type Valley Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307493 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:17 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:ErDeBhooCW6W7KTmKQR8snz73g9-UMYBRTN9Yx6zqIftY29RwM4NX7MdGaliEUmp9?yk_yq Scale = 1:12.4 1 2 3 2x4 2x4 2x4 0-0-3 0-0-3 3-3-2 3-2-14 1-7-9 1-7-9 3-3-2 1-7-9 0-0-41-10-130-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.07 0.16 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-2 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=112/3-2-11, 3=112/3-2-11 Max Horz 1=-40(LC 4) Max Uplift 1=-4(LC 7), 3=-4(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V06 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307494 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:18 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yY6ZfoNnJEEqSSE46mggTZdTEXcn?1?sS8VNhSyk_yp Scale = 1:28.8 1 2 3 2x4 2x4 2x4 7-4-7 7-4-7 3-8-4 3-8-4 7-4-7 3-8-4 0-0-44-3-100-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.39 0.49 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 17 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=273/7-4-7, 3=273/7-4-7 Max Horz 1=97(LC 5) Max Uplift 1=-10(LC 7), 3=-10(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V07 Truss Type Valley Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307495 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:18 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-yY6ZfoNnJEEqSSE46mggTZdXXXdV?1?sS8VNhSyk_yp Scale = 1:21.2 1 2 3 2x4 2x4 2x4 5-0-13 5-0-13 5-1-0 0-0-3 2-6-8 2-6-8 5-1-0 2-6-8 0-0-42-11-100-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.18 0.44 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-1-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=185/5-0-10, 3=185/5-0-10 Max Horz 1=-66(LC 4) Max Uplift 1=-7(LC 7), 3=-7(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V08 Truss Type Valley Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307496 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:19 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Rkgxs8OQ4YMh3cpGgTBv?n9kLx2qkUE?hoFwEuyk_yo Scale = 1:11.0 1 2 3 2x4 2x4 2x4 0-0-3 0-0-3 2-9-10 2-9-6 1-4-13 1-4-13 2-9-10 1-4-13 0-0-41-7-100-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.05 0.12 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 5 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 2-9-10 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=94/2-9-3, 3=94/2-9-3 Max Horz 1=-33(LC 4) Max Uplift 1=-4(LC 7), 3=-4(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V09 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307497 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:20 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-vxEJ3UP2rsUXhmOSDAj8Y_iqsKONTuW9wS_UmKyk_yn Scale = 1:46.7 1 2 3 4 5 9 8 7 6 2x4 2x4 6x6 3x4 2x4 2x4 2x4 2x4 2x4 10-9-0 10-9-0 4-6-8 4-6-8 10-9-0 6-2-8 1-11-57-2-140-0-414.00 12 Plate Offsets (X,Y)-- [3:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.38 0.10 0.25 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 5 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 36 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x4 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 10-9-0. (lb) - Max Horz 9=-188(LC 4) Max Uplift All uplift 100 lb or less at joint(s) 7 except 9=-214(LC 4), 5=-130(LC 5), 8=-335(LC 6), 6=-172(LC 7) Max Grav All reactions 250 lb or less at joint(s) 9, 5 except 7=299(LC 1), 8=368(LC 10), 6=284(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-8=-298/331 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 7 except (jt=lb) 9=214, 5=130, 8=335, 6=172. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V10 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307498 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:21 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-N7ohHqQgb9cOJwzenuEN5CE_GkiaCNtI96k1Imyk_ym Scale = 1:40.1 1 2 3 43x8 4x6 3x8 2x4 9-7-4 9-7-4 4-6-8 4-6-8 9-7-4 5-0-12 0-7-55-10-140-0-414.00 12 Plate Offsets (X,Y)-- [1:0-0-0,0-0-11], [1:0-0-0,0-3-6], [1:0-3-8,Edge], [2:Edge,0-1-14], [3:0-2-15,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.40 0.23 0.12 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 30 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF-S Stud BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 WEDGE Left: 2x4 SPF-S Stud BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=201/9-7-4, 3=213/9-7-4, 4=317/9-7-4 Max Horz 1=-135(LC 4) Max Uplift 1=-17(LC 7), 3=-11(LC 6), 4=-7(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V11 Truss Type Valley Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307499 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:21 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-N7ohHqQgb9cOJwzenuEN5CEzSkhiCOmI96k1Imyk_ym Scale = 1:31.3 1 2 3 42x4 3x4 2x4 2x4 0-0-3 0-0-3 7-10-2 7-9-14 3-11-1 3-11-1 7-10-2 3-11-1 0-0-44-6-140-0-414.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.46 0.28 0.06 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 19 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=184/7-9-11, 3=184/7-9-11, 4=224/7-9-11 Max Horz 1=105(LC 5) Max Uplift 1=-35(LC 7), 3=-29(LC 6) Max Grav 1=184(LC 1), 3=184(LC 1), 4=229(LC 2) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V12 Truss Type Valley Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307500 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:22 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-rJL4UAQIMTkFw3YrLblcdPnCx8zyxr_RNmTaqDyk_yl Scale = 1:22.7 1 2 3 2x4 2x4 2x4 0-0-3 0-0-3 5-6-11 5-6-7 2-9-5 2-9-5 5-6-11 2-9-5 0-0-43-2-140-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.22 0.54 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 11 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-6-11 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=204/5-6-4, 3=204/5-6-4 Max Horz 1=72(LC 5) Max Uplift 1=-8(LC 7), 3=-8(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V13 Truss Type Valley Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307501 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:23 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:nvRCrVWLYVz8PozCMqfRhAyef5_-JWvSiWRw7ns6YD61vJGrAdKP0YP_gIEbcQD8Nfyk_yk Scale = 1:12.4 1 2 3 2x4 2x4 2x4 0-0-3 0-0-3 3-3-4 3-3-0 1-7-10 1-7-10 3-3-4 1-7-10 0-0-41-10-140-0-414.00 12 Plate Offsets (X,Y)-- [2:Edge,0-1-8] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.07 0.17 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 6 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 3-3-4 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=113/3-2-13, 3=113/3-2-13 Max Horz 1=-40(LC 4) Max Uplift 1=-4(LC 7), 3=-4(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V14 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307502 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:24 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-niTqvsSYu4_zANhDS0n4iqsWOyiIPjlkr4yhv5yk_yj Scale = 1:40.0 1 2 3 4 5 10 9 8 7 64x6 4x6 2x4 2x4 2x4 2x4 2x4 2x4 2x4 2x4 16-8-4 16-8-4 9-7-4 9-7-4 16-8-4 7-1-0 0-0-46-4-131-8-38.00 12 Plate Offsets (X,Y)-- [1:0-1-13,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.35 0.35 0.18 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 6 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 47 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x4 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.All bearings 16-8-4. (lb) - Max Horz 1=160(LC 5) Max Uplift All uplift 100 lb or less at joint(s) 1, 6, 7 except 10=-115(LC 6) Max Grav All reactions 250 lb or less at joint(s) 1, 6 except 8=259(LC 1), 10=445(LC 10), 7=312(LC 11) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-10=-333/164 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 6, 7 except (jt=lb) 10=115. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V15 Truss Type GABLE Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307503 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:24 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-niTqvsSYu4_zANhDS0n4iqsS_yjOPkpkr4yhv5yk_yj Scale = 1:25.2 1 2 3 43x12 6x8 3x12 2x4 12-2-8 12-2-8 6-1-4 6-1-4 12-2-8 6-1-4 0-0-44-0-130-0-48.00 12 Plate Offsets (X,Y)-- [1:0-9-13,Edge], [2:0-5-4,0-2-8], [3:0-4-15,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-R 0.63 0.28 0.11 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 30 lb FT = 20% GRIP 169/123 LUMBER- TOP CHORD 2x4 SPF-S Stud BOT CHORD 2x4 SPF No.2 OTHERS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 6-0-0 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=209/12-2-8, 3=209/12-2-8, 4=481/12-2-8 Max Horz 1=-87(LC 4) Max Uplift 1=-18(LC 6), 3=-23(LC 7), 4=-4(LC 6) Max Grav 1=210(LC 10), 3=210(LC 11), 4=481(LC 1) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. WEBS 2-4=-298/73 NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3, 4. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V16 Truss Type Valley Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307504 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:25 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-Fu1C7CTAfO6qnXGQ0kIJF2PkxL0Q8Cku3kiFRYyk_yi Scale = 1:13.3 1 2 3 2x4 2x4 2x4 0-0-6 0-0-6 5-2-8 5-2-2 2-7-4 2-7-4 5-2-8 2-7-4 0-0-41-8-130-0-48.00 12 Plate Offsets (X,Y)-- [2:0-2-0,Edge] LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.17 0.42 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 9 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 5-2-8 oc purlins. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=180/5-1-12, 3=180/5-1-12 Max Horz 1=-35(LC 4) Max Uplift 1=-8(LC 6), 3=-8(LC 7) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(6-7) 1) Unbalanced roof live loads have been considered for this design. 2) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 3) Gable requires continuous bottom chord bearing. 4) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 5) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 1, 3. 6) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 7) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 16023 Swingley Ridge Rd Chesterfield, MO 63017 Design valid for use only with MiTek® connectors. This design is based only upon parameters shown, and is for an individual building component, not a truss system. Before use, the building designer must verify the applicability of design parameters and properly incorporate this design into the overall building design. Bracing indicated is to prevent buckling of individual truss web and/or chord members only. Additional temporary and permanent bracing is always required for stability and to prevent collapse with possible personal injury and property damage. For general guidance regarding the fabrication, storage, delivery, erection and bracing of trusses and truss systems, see ANSI/TPI1 Quality Criteria, DSB-89 and BCSI Building Component available from Truss Plate Institute, 218 N. Lee Street, Suite 312, Alexandria, VA 22314.Safety Information WARNING - Verify design parameters and READ NOTES ON THIS AND INCLUDED MITEK REFERENCE PAGE MII-7473 rev. 10/03/2015 BEFORE USE. Job 3_Heritage_at_Spring_Mill Truss V17 Truss Type Valley Qty 1 Ply 1 3 Heritage at Spring Mill Job Reference (optional) I38307505 8.240 s Jul 14 2019 MiTek Industries, Inc. Mon Aug 26 11:18:26 2019 Page 1 ProBuild (Carter-Lee), Mooresville, IN - 46158, ID:EvWg2tiHQVSzJMSEDMv2ODzW2H3-j5baKYUpQiEhPhrcaRpYoFypVlNrtfz1INRoz_yk_yh Scale = 1:18.1 1 2 3 2x4 2x4 2x4 4-7-0 4-7-0 0-0-43-0-118.00 12 LOADING (psf) TCLL TCDL BCLL BCDL 20.0 10.0 0.0 10.0 SPACING- Plate Grip DOL Lumber DOL Rep Stress Incr Code 2-0-0 1.15 1.15 YES IRC2006/TPI2002 CSI. TC BC WB Matrix-P 0.57 0.35 0.00 DEFL. Vert(LL) Vert(TL) Horz(TL) in n/a n/a 0.00 (loc) - - 3 l/defl n/a n/a n/a L/d 999 999 n/a PLATES MT20 Weight: 10 lb FT = 20% GRIP 197/144 LUMBER- TOP CHORD 2x3 SPF No.2 BOT CHORD 2x3 SPF No.2 WEBS 2x3 SPF No.2 BRACING- TOP CHORD Structural wood sheathing directly applied or 4-7-0 oc purlins, except end verticals. BOT CHORD Structural wood sheathing directly applied or 10-0-0 oc bracing. REACTIONS.(lb/size)1=165/4-6-10, 3=165/4-6-10 Max Horz 1=83(LC 5) Max Uplift 3=-28(LC 6) FORCES.(lb) - Max. Comp./Max. Ten. - All forces 250 (lb) or less except when shown. NOTES-(5-6) 1) Wind: ASCE 7-05; 90mph; TCDL=6.0psf; BCDL=6.0psf; h=25ft; Cat. II; Exp B; Enclosed; MWFRS (low-rise) gable end zone and C-C Exterior(2) zone; cantilever left and right exposed ; end vertical left and right exposed;C-C for members and forces & MWFRS for reactions shown; Lumber DOL=1.60 plate grip DOL=1.60 2) Gable requires continuous bottom chord bearing. 3) This truss has been designed for a 10.0 psf bottom chord live load nonconcurrent with any other live loads. 4) Provide mechanical connection (by others) of truss to bearing plate capable of withstanding 100 lb uplift at joint(s) 3. 5) Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI-B1 6) It is extremely important to properly install temporary lateral restraint and diagonal bracing, in accordance with BCSI-B2 or using proprietary methods (e.g. Stabilizer, etc.). August 26,2019 PRODUCT CODE APPROVALSLATERAL BRACING LOCATIONIndicates location where bearings(supports) occur. Icons vary butreaction section indicates jointnumber where bearings occur.Min size shown is for crushing only.Indicated by symbol shown and/orby text in the bracing section of theoutput. Use T or I bracingif indicated.The first dimension is the plate width measured perpendicular to slots. Second dimension isthe length parallel to slots.Center plate on joint unless x, yoffsets are indicated.Dimensions are in ft-in-sixteenths.Apply plates to both sides of trussand fully embed teeth.1. Additional stability bracing for truss system, e.g. diagonal or X-bracing, is always required. See BCSI.2. Truss bracing must be designed by an engineer. For wide truss spacing, individual lateral braces themselves may require bracing, or alternative Tor I bracing should be considered.3. Never exceed the design loading shown and never stack materials on inadequately braced trusses.4. Provide copies of this truss design to the building designer, erection supervisor, property owner and all other interested parties.5. Cut members to bear tightly against each other.6. Place plates on each face of truss at each joint and embed fully. Knots and wane at joint locations are regulated by ANSI/TPI 1.7. Design assumes trusses will be suitably protected from the environment in accord with ANSI/TPI 1.8. Unless otherwise noted, moisture content of lumber shall not exceed 19% at time of fabrication.9. Unless expressly noted, this design is not applicable for use with fire retardant, preservative treated, or green lumber.10. Camber is a non-structural consideration and is the responsibility of truss fabricator. General practice is to camber for dead load deflection.11. Plate type, size, orientation and location dimensions indicated are minimum plating requirements.12. Lumber used shall be of the species and size, and in all respects, equal to or better than that specified.13. Top chords must be sheathed or purlins provided at spacing indicated on design.14. Bottom chords require lateral bracing at 10 ft. spacing, or less, if no ceiling is installed, unless otherwise noted.15. Connections not shown are the responsibility of others.16. Do not cut or alter truss member or plate without prior approval of an engineer.17. Install and load vertically unless indicated otherwise.18. Use of green or treated lumber may pose unacceptable environmental, health or performance risks. Consult with project engineer before use.19. Review all portions of this design (front, back, words and pictures) before use. Reviewing pictures alone is not sufficient.20. Design assumes manufacture in accordance with ANSI/TPI 1 Quality Criteria.Failure to Follow Could Cause PropertyDamage or Personal Injury (Drawings not to scale)© 2012 MiTek® All Rights ReservedMiTek Engineering Reference Sheet: MII-7473 rev. 10/03/2015edge of truss.from outside"16/1-0ICC-ES Reports:ESR-1311, ESR-1352, ESR1988ER-3907, ESR-2362, ESR-1397, ESR-3282JOINTS ARE GENERALLY NUMBERED/LETTERED CLOCKWISEAROUND THE TRUSS STARTING AT THE JOINT FARTHEST TOTHE LEFT.CHORDS AND WEBS ARE IDENTIFIED BY END JOINTNUMBERS/LETTERS.W 4 - 6 W3-6W3 - 7 W2-7W1-7C1-8 C5-6C6-7C7-8C4-5 C3-4C2-3C1-2TOP CHORD TOP CHORD 87654321BOTTOM CHORDSTOP CHORDSBEARING4 x 4PLATE SIZEThis symbol indicates the required direction of slots inconnector plates."16/1For 4 x 2 orientation, locateplates 0- 1"4/3PLATE LOCATION AND ORIENTATIONSymbolsNumbering SystemGeneral Safety Notes *Plate location details available in MiTek 20/20software or upon request.Industry Standards:ANSI/TPI1: National Design Specification for Metal Plate Connected Wood Truss Construction.DSB-89: Design Standard for Bracing.BCSI: Building Component Safety Information, Guide to Good Practice for Handling, Installing & Bracing of Metal Plate Connected Wood Trusses.6-4-8WEBSTrusses are designed for wind loads in the plane of the truss unless otherwise shown.Lumber design values are in accordance with ANSI/TPI 1 section 6.3 These truss designs rely on lumber values established by others.dimensions shown in ft-in-sixteenths