HomeMy WebLinkAboutC0.0.Title Sheet (V2)SITE
VALVOLINE INSTANT OIL CHANGE
9835 MICHIGAN ROAD - LOT '1A' of NORTH AUGUSTA
CIVIL CONSTRUCTION PLANS
PROJECT DEVELOPER:
CARMEL, INDIANA 46032
C0.0
VICINITY MAP
SHEET OF
PROJECT NUMBER
DRAWING NUMBER
VIOC.001
PROJECT VICINITY
160 West Carmel Drive, Suite 240
Carmel, Indiana 46032
Phone: (317) 810-1677 Fax: (317) 810-1679
Email: bcross@civilsite.net
GROUP, INC
07/17/2019
VALVOLINE INSTANT OIL CHANGE
100 VALVOLINE WAY
LEXINGTON, KENTUCKY 40509
Email: richard.gallegos@valvoline.com
Phone: (972) 202-6674
ATTN: Richard Gallegos, Project Manager
CONSTRUCTION PLAN INDEX
PROF
E
SS
ION A L E NG INEERIND
IA NA
PE10910647
STATE OF
-oNREGIS TER
E
DBR IA N S CR
O
SSREVISION RECORD
DEVELOPMENT SUMMARY
PROPOSED USE: AUTOMOBILE OIL CHANGE FACILITY
TOTAL SITE AREA = 0.98± Ac.
TOTAL DISTURBED AREA = 41,183± SF = 0.95± Ac
PROPOSED BUILDING GROSS SQUARE FOOTAGE = 2,030 S.F.
PROPOSED BUILDING COVERAGE RATIO = 4.8% OF SITE AREA
OVERLAY ZONE = US 421 - MICHIGAN ROAD CORRIDOR
CURRENT ZONING = B3 (BUSINESS DISTRICT)
MAX. FRONT YARD SETBACK DISTANCE = 120'
BUILDING SETBACKS BUILDING SETBACKS REQUIRED
FRONT = 37.7' FRONT = 30'
REAR = 174.1' REAR = 15'
SIDE = 45' SIDE = 15'
**APPROVED VARIANCES**
DOCKET No. 17120014V (9.5' BUILDING SETBACK GRANTED)
DOCKET No. 17120015V (SIGNAGE APPROVAL)
ANTICIPATED CONSTRUCTION START/COMPLETION DATE
SEPTEMBER, 2019 / OCTOBER, 2020
TOTAL PARKING SPACES = 11
EXISTING RIGHT-OF-WAY NOTE
DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL BE RESTORED/REPAIRED TO THE
SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR
IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START
OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY.
ENGINEER:
OPERATING AUTHORITY
CITY OF CARMEL DEPT. OF ENGINEERING
ONE CIVIC SQUARE
CARMEL, INDIANA 46032
PHONE: 317-571-2441 FAX: 317-571-2439
SURVEYOR
CENTRAL STATES CONSULTING, LLC.
23-B NORTH GREEN STREET
BROWNSBURG, INDIANA 46112
Ph: (317) 858-8662
ATTN: Donald Mosson
CARMEL ENGINEERING DEPT. NOTE
ALL PAVING WITHIN THE EXISTING AND PROPOSED CITY RIGHT-OF-WAY SHALL CONFORM TO THE
REQUIREMENTS OF THE DEPARTMENT OF ENGINEERING. THE CONTRACTOR SHALL CONTACT THE
DEPARTMENT OF ENGINEERING TO SCHEDULE A PRE-CONSTRUCTION MEETING TO REVIEW THE
DEPARTMENT'S CONSTRUCTION REQUIREMENTS, STAFF NOTIFICATION REQUIREMENTS, REQUIRED
INSPECTIONS FOR CERTAIN STAGES OF THE WORK AND TO REVIEW THE AUTHORITY OF THE
DEPARTMENT AS IT RELATES TO WORK WITHIN THE EXISTING AND PROPOSED RIGHT-OF-WAY.
LAND DESCRIPTION
BENCHMARK