HomeMy WebLinkAboutC4.0.SWPP Plan (V2)EROSION CONTROL NOTES 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. LAND ALTERATION WHICH STRIPS THE LAND OF VEGETATION, INCLUDING REGRADING, SHALL BE DONE IN A WAY THAT WILL MINIMIZE EROSION. 3. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE AS THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING THE SITE. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED IF DEEMED NECESSARY BY ON -SITE INSPECTION. 4. SEDIMENT LADEN WATER SHALL BE DETAINED BY EROSION CONTROL PRACTICES AS NEEDED TO MINIMIZE SEDIMENTATION IN THE RECEIVING STREAM. NO STORM WATER SHALL BE DISCHARGED FROM THE SITE IN A MANNER THAT CAUSES EROSION AT THE POINT OF DISCHARGE. 5. WASTES AND UNUSED BUILDING MATERIALS SHALL NOT BE ALLOWED TO BE CARRIED FROM THE SITE BY STORMWATER RUNOFF. PROPER DISPOSAL OF ALL WASTES AND UNUSED BUILDING MATERIALS IS REQUIRED. 6. SEDIMENT BEING TRACED ONTO PUBLIC OR PRIVATE ROADWAYS SHALL BE MINIMIZED. CLEARING OF ACCUMULATED SEDIMENT SHALL NOT INCLUDE FLUSHING WITH WATER. CLEARED SEDIMENT SHALL BE RETURNED TO THE SITE FOR DISPOSAL. 7. SOIL WHICH HAS ACCUMULATED NEXT TO EROSION CONTROL DEVICES SHALL BE COLLECTED AND REDISTRIBUTED ON SITE AFTER EACH RAINFALL EVENT, AND AT LEAST ONCE A WEEK. 8. IF INSTALLATION OF STORM DRAINAGE SYSTEM SHOULD BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE ENDS SHALL BE COVERED WITH FILTER FABRIC. 9. ALL EXISTING STRUCTURES, FENCING, TREES AND ETC., WITHIN CONSTRUCTION AREA SHALL BE REMOVED AND DISPOSED OF OFF SITE. BURNING IS NOT ALLOWED ON -SITE. 10. SCHEDULE OF EARTHWORK ACTIVITIES: a) THE DURATION OF TIME WHICH AN AREA REMAINS EXPOSED SHALL BE KEPT TO A PRACTICAL MINIMUM. THE AREA SHALL BE STABILIZED SOON AS POSSIBLE. TEMPORARY VEGETATION OR MULCHING SHALL BE USED TO PROTECT EXPOSED AREAS IF PERMANENT VEGETATION CANNOT BE SEEDED WITHIN 14 DAYS OR ACTIVITY CEASES FOR MORE THAN 21 DAYS OR AS DIRECTED BY THE ENGINEER. GRADING NOTES 1. ALL CONSTRUCTION METHODS AND MATERIALS MUST CONFORM TO CURRENT STANDARDS AND SPECIFICATIONS OF THE FEDERAL, STATE, COUNTY, CITY OR LOCAL REQUIREMENTS, WHICHEVER HAS JURISDICTION. 2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO STARTING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL FIELD DIMENSIONS. IF ANY DISCREPANCIES ARE FOUND IN THESE PLANS FROM THE ACTUAL FIELD CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY. 3. THE EXCAVATING CONTRACTOR MUST TAKE PARTICULAR CARE WHEN EXCAVATING IN AND AROUND EXISTING UTILITY LINES AND EQUIPMENT. VERIFY COVER REQUIREMENTS BY UTILITY CONTRACTORS AND/OR UTILITY COMPANIES SO AS NOT TO CAUSE DAMAGE. 4. THE CONTRACTOR SHALL NOTIFY ALL UTILITY COMPANIES 72 HOURS BEFORE CONSTRUCTION IS TO START, TO VERIFY IF ANY UTILITIES ARE PRESENT ON SITE. ALL VERIFICATIONS (LOCATION, SIZE AND DEPTH) SHALL BE MADE BY THE APPROPRIATE UTILITY COMPANIES. WHEN EXCAVATING IS AROUND OR OVER EXISTING UTILITIES, THE CONTRACTOR MUST NOTIFY THE UTILITY COMPANY GENERAL NOTES TOPOGRAPHIC & BOUNDARY NOTE ALL EXISTING HORIZONTAL AND VERTICAL INFORMATION HAS BEEN SHOWN PER AN ALTA/NSPS/TOPOGRAPHIC SURVEY PREPARED BY CENTRAL STATES CONSULTING, LLC. DATED 04/11 /2017; THEREFORE, CIVIL SITE GROUP, INC. CANNOT BE HELD RESPONSIBLE IF ACTUAL HORIZONTAL AND VERTICAL DATA IS DIFFERENT FROM THAT SHOWN ON THESE PLANS. CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF ALL EXISTING CONDITIONS PRIOR TO COMMENCING WITH CONSTRUCTION. THESE DRAWINGS REFLECT ABOVE GROUND INDICATIONS OF EXISTING UTILITIES. THE SURVEYOR MAKES NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM THE INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES. PROPERTY CORNER MONUMENTS NOTE FALLPERTY CORNER MONUMENTS SHOULD BE MARKED COMMENCING WITH CONSTRUCTION AND TED DURING ALL CONSTRUCTION ACTIVITY. FERTILIZER NOTE F PHOSPHOROUS CONTAINING -12-12) UNLESS SOIL TESTS HOSPHOROUS DEFICIENCY. OWNER: VALVOLINE INSTANT OIL CHANGE Attn: RICHARD GALLEGOS, P.M. 100 VALVOLINE WAY LEXINGTON, KY 40509 (972) 202-6674 ENGINEER: CIVIL SITE GROUP, INC. 160 WEST CARMEL DRIVE SUITE 240 CARMEL, INDIANA 46032 (317) 810-1677 ARCHITECT: CESO, INC. Attn: ANDY McLOUD 175 MONTROSE WEST AVE. SUITE 400 AKRON, OHIO 44321 (937) 401-3824 REVISION RECORD REV DATE DESCRIPTION DES BY APP BY 1 09/13/19 REV. PER CARMEL TAC REVIEW COMMENTS I KPB I BSC SURVEYOR: MULCHING NOTE lZ CENTRAL STATES CONSULTING, LLC. Ix 23-B N. GREEN STREET WHERE REQUIRED. CRIMPED/ANCHORED MULCH OR (317) 8 BURG, INDIANA 46112 MULCH WITH A TACKING AGENT SHALL BE USED. THE \ Drainage ZG Attn: DONALD62 �� Attn: DONALD MOSSON APPLICATION RATE SHOULD MEET GUIDELINES PER \ Rim=883.0 A PRACTICE 3.15 OF THE INDIANA HANDBOOK FOR Inv(N/S)=8. EROSION CONTROL IN DEVELOPING AREAS. (asphalt) \ \ \ Inv(E)=878.5 i ADDITIONAL EROSION CONTROL Aqua Swirl Aqua Swir \ 15 RCP ((1 `` Curb Inlet Rim=883.42 Rim=883.77 \ \ / (n:P �` Rim=882.39 MEASURES MAY BE REQUIRED IN Inv(Bottom)=877.42 Inv(W)=879.45 \\ \ /�`� (asphalt) `, Inv(W)=879.09 THE FIELD BY THE INSPECTOR � 2.2 Standing Water Inv(E)=879.5 �� Q Aqua Swirl Inv(S)--879.52 Inl. � Rim=883.48D \ Rim �G'..42 Inv(W/S/E)=879.63 D Inv(L (0'8.96 / � Inlet \ `� b) TOPSOIL REPLACEMENT SHALL TAKE PLACE FROM MARCH 1 TO / Rim=883.43 15" OCTOBER 31. STOCKPILE TOPSOIL AT ALL OTHER TIME OF THE YEAR. EEP// V Inv(W)=879.73 A i PERMANENT AND FINAL VEGETATION AND STRUCTURAL EROSION \O \�� q irl Cuyb \ CONTROL DEVICES SHALL BE INSTALLED WITHIN SEVEN (7) DAYS AFTER NS\g\E�OF / / Inv(E)=879.68Rim=883.66 FINAL GRADING OR AS SOON AS POSSIBLE. S?0 FRE ES Inlet --�55 Inv(Bottom)=877.56 STORM SEWER SYSTEM NOTE ALL STORM SEWER INFRASTRUCTURE TO BE CONSTRUCTED WITH THIS PROJECT SHALL BE PRIVATELY OWNED AND MAINTAINED BY CURRENT PROPERTY OWNER & ALL HEIRS, SUCCESSORS, & ASSIGNS. " Curb 6"Curb-/ Curb Inlet \ Rim=883.15 880.39 Drainage M Rim=883.51 R Inv(S)=878.09 PG�OR�NGS\�P P�\,�\M Rim=883.99 / j 2.1' Standing t" M� a \\ ON�R Nep G nv(W)=880.27 / as q� NORTH G V BOG �R\SI Inv(E)=880.17 20 0 10 20 CONCRETE WASHOUT BMP 30 CY ROLLOFF PROVIDED BY REPUBLIC WASTE SERVICES 6% ury� S / 1� / `� ( IN FEET ) OR SEE DETAIL 01/C4.0 / 1 inch = 20ft. P§ ' \\ (asphalt) \ \ \ Rim=883.78 \ PS \ Inv(N)=880.28 \ \ \ Inv(E)=880.23 \(asphalt) \ \ \ \ PS aa5 0 \\ \ \ \ \ 6"Curb \ i / / a�m0 aa�a aa�10 a �\O0 0 ` �02 \\ \ \ \� a 0 0 0 0\� O 0 o� \ \ (grass) / / i �� T MPORARY 0 0 00 0 0 0�\`aa�6 ` 0 0 TRUCTION 0 0 00 0 0 NTRANCE o 0 0 ° 0 o �M. / a goo S o \ \ E. a . o F � m " 0 0 aa�' PS 0'� � � EXISTING POND E ��'NORMAL POOL = 874.0 & PS i i i� F 100-YR STAGE = 881.14 7 0 \ \ 9 ------ r>.. Lp 0,2 � O \ � \ � �r ;�:.... as • \5 8a • 9 \ P S �:::: ' .:::::... as as \ \O \ \ 515 0 j'. , \\ \� � �a 1' as ¢►I - \ Q.V PS �5 , �O � V aa�• 95 pS I aa4o 0 \ \ \ I aa35o Q o a\ r f1 6"C rb ` �� \\\ PS \ 88. i 883.70 C c JQ \ 9O, , O \ 8 883.20 M\ 24" Roll Curb PS \ GQ Carb Inlet \\ ` \ BR A 30 Rim=8 .78 [ m Inv(W)= 25 \ 2S � IGAm Drai ge MH p � SS \\\ `S \ eehive Inlet � S Rim- 82.94 \ Rim=881.25 \ \ \ a2a \ Inv(NE)=878. E• jarcv"1'�.RAW VV id.. 9•�\ ; , (4'0 FIRST DEFENSE UNIT - �� aa, 20 aa360 PS aa�o PS 1P ,5 65 aaa ao aa� 60 5 �0 aah 0° cJF / PROPERTY BOUNDARY > 0 0 PROPOSED SWALE FLOWLINE TOP OF CURB GRADE 798.73 PAVEMENT GRADE 798.25 PAVEMENT OR EARTH GRADE CONSTRUCTION LIMITS 000 - _ Existing Contour Check Dam/Sediment Filter - Spacing at 100' within swales (Rock Check Dam). See detail 07/C4.1 PROPOSED SILT FENCE -Typical in all areas SF where sediment could leave the site. SEE DETAIL 06/C4.1 --{ SS (8" 0 Standard Duty "SILT SOCK" or approved equal) PROPOSED SILT SOCK -Typical in all paved areas where sediment could leave the site. PS TS PERMANENT SEEDING WITH STRAW MULCH - TYPICAL AFTER FINAL GRADING IS COMPLETED. NS NURSERY SOD PROPOSED EROSION CONTROL BLANKET EB SEE DETAIL 05/C4.1 TS TEMPORARY SEEDING WITH STRAW MULCH - TYPICAL WHERE CONSTRUCTION ACTIVITIES WILL REMAIN IDLE FOR A PERIOD OF 15 DAYS OR MORE. Inlet Protection - "Flexstorm" inlet protection typical for all paved area inlets AFTER pavement is installed; Silt Fence cage & "Flexstorm" inlet protection BEFORE pavement is installed. Point where stormwater will leave the site. 000 PROPOSED CONTOUR 0 0 0 0 o PROPOSED TEMPORARY CONSTRUCTION ENTRANCE 0 0 o SEE DETAIL 03/C4.1 NOTE: INSTALL TEMPORARY SEEDING AFTER A SPECIFIC STAGE OF CONSTRUCTION HAS BEEN COMPLETED (TEMPORARY OR FINAL) WHERE AREAS WILL BE IDLE OF CONSTRUCTION ACTIVITIES FOR A PERIOD OF 15 DAYS OR MORE. DEVELOPMENT SUMMARY TOTAL SITE AREA = 0.98 ACRES +/- TOTAL DISTURBED AREA = 0.95 ACRES +/- EROSION CONTROL NOTES 1. EROSION CONTROL PLAN MUST BE EXECUTED BEFORE COMMENCING WITH CONSTRUCTION. 2. ALL EROSION CONTROL MATERIAL NEEDS TO BE APPROVED BY THE CITY INSPECTORS PRIOR TO INSTALLATION. PS u 2.9 A. ®\ \\\ i 2. C 6" rb \ - - - - - - - \�I F- 3. PS a�2�ME. \ \ y \ \ \ \ 4. 1 24" Cub \ \ \ �v� �� I 5. 1 GENERAL NOTES ;ONTRACTOR TO SCHEDULE A PRE -CONSTRUCTION MEETING WITH ­IE CITY OF CARMEL STORM WATER ENGINEERING (DAN GRESKAMP). RIOR TO COMMENCING WITH CONSTRUCTION. 317-571-2441 EMPORARY TRAFFIC CONTROL DURING CONSTRUCTION TO ONFORM TO APPLICABLE LOCAL AND STATE STANDARDS. ALL CONSTRUCTION ACTIVITY ON THIS SITE TO BE PERFORMED IN COMPLIANCE WITH APPLICABLE O.S.H.A. STANDARDS FOR WORKER SAFETY. T SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL UTILITY LOCATIONS BEFORE CONSTRUCTION BEGINS. T SHALL BE THE CONTRACTORS RESPONSIBILITY TO FIELD VERIFY ALL EXISTING ELEVATIONS BEFORE CONSTRUCTION BEGINS. (asphalt) / ::��nlet CONTRACTOR NOTE i P \\ Rim=/S)=8 \ \ \ I NO EARTH DISTURBING ACTIVITY MAY COMMENCE OGEE Inv(W/S)=877.32 �\ \ \ WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT OF \\ I \ \ FL �RPG1 oOR X30 GON vs O ��\SIM \�0-0 \ SOILS DESCRIPTIONS & LIMITATIONS nIet Rim= 2.64 \\ Inv(SW/E)=877.59 Inlet \\ SEEDING NOTE Rim=882.33� 877.28 INSTALL TEMPORARY SEEDING AFTER A SPECIFIC STAGE OF CONSTRUCTION HAS BEEN COMPLETED (TEMPORARY OR FINAL) WHERE AREAS WILL BE IDLE OF CONSTRUCTION ACTIVITIES FOR A PERIOD OF 15 DAYS OR MORE. FLOOD NOTE THIS LOT LIES ENTIRELY IN FLOOD HAZARD ZONE "X" AS SCALED FROM THE FLOOD INSURANCE RATE MAP (FIRM) FOR HAMILTON COUNTY, INDIANA, COMMUNITY NAME CITY OF CARMEL, COMMUNITY NUMBER 180081, MAP NUMBER 18057CO225 G, PANEL NUMBER 0225 G, DATED NOVEMBER 19, 2014. REFERENCE NAP FIRM MAP #: 18057CO225 G EFFECTIVE DATE: NOVEMBER 19, 2014. STORM SEWER INLET NOTE ALL STORM WATER INLETS & CATCH BASIN CASTINGS SHALL BE LABELLED WITH ENVIRONMENTAL MESSAGING "NO DUMPING, DRAINS TO STREAM" CAST IN RAISED OR RECESSED LETTERS AT A MIN. 1-INCH HEIGHT. A SYMBOL OF A FISH SHALL ALSO BE CAST WITH THE LETTERS 1. Brookston Silty Clay Loam (Br - 0.90% Site) The Brookston series consists of very deep, poorly drained soils formed in up to 20 inches of silty material and the underlying loamy till in depressions on till plains and moraines. Permeability is moderate in the subsoil and moderately slow in the underlying material. Slope ranges from 0 to 2 percent. Subject soil does not present any foreseeable limitations to the proposed development. 2. Crosby Silty Loam (CrA - 99.1 % Site) The Crosby series consists of very deep, somewhat poorly drained soils that are moderately deep to dense till on till plains. These soils formed in loamy till that can be capped with up to 22 inches of loess or silty material. Permeability is moderate or moderately slow in and above the argillic horizon and slow or very slow below the argillic horizon. Slope ranges from 0 to 2 percent. Subject soil does not present any foreseeable limitations to the proposed development. **IF CONSTRUCTION IS TAKING PLACE DURING WET SEASONS, SOILS MAY REQUIRE LIME STABILIZATION. SOILS MAP SCALE: 1 " = 100' W - z a O Ln O 00 OftftftN V1 O N ago 0 O � �C O o Ua) 00 �Q V � ♦�� p,N SCR No •• e PE10910647 e = -13 STATE OF o • P v ``' 41-*1411111 lilt, DATE: 07/17/2019 �^^ W co v w W �O(o > ,-,moo W C o ^�^ � c) I 0 O Lr) O U � > co 0 O V1 PROJECT NUMBER VIOC.001 DRAWING NUMBER C4m0 SHEET 6 OF 16 DWN BY: KPB CHKD. BY: BSC SCALE: 1 " = 20' DATE: 07 17 19