HomeMy WebLinkAboutC901 - STORMWATER POLLUTION AND PREVENTION NOTESC9018AB3456712CDEFGH83456712ABCDEFGHDESCRIPTIONDATENO
REVISION RECORD
DATE:
DWG SCALE:
DRAWN BY:
CHECKED BY:
APPROVED BY:
PROJECT NO:SHEETOFDRAWING NO.:193-104
SEPT. 18, 2019
21GEA ARCHITECTS
CARMEL HEALTH & WELLNESS COMPLEX
820 CITY CENTER DRIVE
CARMEL, INDIANA 530 E. Ohio Street · Suite G - Indianapolis, IN 46204
317-655-7777 · 877-746-0749
www.cecinc.comPROFESSIONAL ENGI
N
E
ERINDIANA A
A
RON C. HURTPE10300058STATE OF-oNR
EGISTERED* HAND SIGNATURE ON FILE
AS NOTED20STORMWATER POLLUTION &
PREVENTION NOTES (13) MATERIAL HANDLING AND SPILL PREVENTION(4) POST CONSTRUCTION STORMWATER QUALITY(3) STORMWATER QUALITY IMPLEMENTATION(1) POTENTIAL LANDUSE POLLUTANTS EROSION CONTROL MAINTENANCE REQUIREMENTSK. MONITORING AND MAINTENANCE GUIDELINES(2) LOCATION, DIMENSIONS, SPECIFICATIONS, AND CONSTRUCTION DETAILS OF EACH STORMWATER QUALITY MEASURE(10) LOCATION OF PROPOSED SOIL STOCKPILES(12) EROSION CONTROL MEASURES FOR INDIVIDUAL BUILDING LOTSSWPPP FOR POST CONSTRUCTION- CITY OF CARMEL(3) ESTIMATED PEAK DISCHARGE(7) POTENTIAL CONSTRUCTION POLLUTANTS(2) RECEIVING WATERS(1) HYDROLOGIC UNIT CODESWPPP FOR CONSTRUCTION SITES- CITY OF CARMEL(6) SOIL MAP(5) LOCATION WHERE STORMWATER MAY BE DIRECTLYDISCHARGED INTO GROUNDWATER(4) LOCATION WHERE SPECIFIC POINTS OF STORMWATER DISCHARGE LEAVING THE SITE(8) TEMPORARY & PERMANENT STORMWATER QUALITY MEASURESC. CONCENTRATED FLOW SEDIMENT CONTROLB. SHEET FLOW SEDIMENT CONTROLA. CONSTRUCTION ENTRANCE INFORMATION(11-B) PERMANENT SURFACE STABILIZATION(11-A) TEMPORARY SURFACE STABILIZATION DESCRIPTION MEASURES:D. INLET PROTECTION LOCATIONS AND SPECS.E. RUNOFF CONTROL MEASURESF. OUTLET PROTECTION SPECIFICATIONSG. GRADE STABILIZATION MEASURESH. STORMWATER QUALITY DETAILSI. TEMPORARY SURFACE STABILIZATIONJ. PERMANENT SURFACE STABILIZATION(9) GENERAL CONSTRUCTION SEQUENCE(5) POST CONSTRUCTION MAINTENANCE GUIDELINES (14) CONTACT INFORMATIONSOILS MAP LEGEND