Loading...
HomeMy WebLinkAboutA121 OVERALL FIRST FLOOR REFLECTED CEILING PLAN96" GYPSUM BOARD OVER 3 ESE METAL STUDS @ 1V' O.C. MAX - {A 4rjft] 59" GYPSUM BOARD OVER EXTEND TO STRUCTURE ABOVE 35I6"OR 6"METAL STUDS @16"OC BRACE BACK TO STRUCTURE @ STUDS 46" O.C. MAX STRUCTURE ABOVE. BULKHEAD WIDTHTOMA C WIDTH TO MATCH ADJACENT WALL CORNER BEADS@ALL I THICESS CH 1*04119gd4511 V!I :b7V/"i REF. TO FLOOR PLANS FOR WALL TYPE INFORMATION Lf METAL STUD HEADER 5'6" GYPSUM BOARD OVER CORNER BEADS @ ALL 3 5/6" METAL STUDS @ 16" O.C. EXPOSED CORNERS, TYP. MAX. -EXTEND STUDS TO STRUCTURE ABOVE BULKHEAD DETAIL TYP. BULKHEAD DETAIL A121 1 1/2" = T-0" A121 1 1/1 T-0" eA A.7 T eC, eD1 eE eF eG, eH 1 e10i Ie9.7! e9.3 RELEASED FOR CONSTRUCTION e� eJ eK1 REFLECTED CEILING PLAN LEGEND A. ALL CEILINGS TOM ACT-1 U.N.O. B. ALL A.C.T. CEILINGS TOM 9-Y'A.F.F. USING 15I16"WHITE METAL TEE GRID. LLN.O, C. PROVIDE 310SOUND BATTS OVER CEILING IN ENTIRE ROOM AND 24"BEYOND OUTSIDEWALL ATALL TOILETS AND CONFERENCE ROOMS WITH SOUND RATED WALLS, 0, ALL GYPSUM BOARD CEILINGS TO BE 3'-0"AF.F. UNLESS NOTED OTHERWISE. E. GYPSUM BOARD CONTROL JOINTS: a PROVIDE AT INTERIOR CEILINGS (WITH PERIMETER RELIEF)OVER 50-0'IN LENGTH IN ANY DIRECTION. TOTAL AREA BETWEEN CONTROL JOINTS SHALL NOT EXCEED 2500 SOFT. b. PROVIDE AT INTERIOR CEILINGS (WITHOUT PERIMETER RELIEF) OVER W4' IN LENGTH IN ANY DIRECTION. TOTAL AREA BETWEEN CONTROL JOINTS SHALL NOT EXCEED NO SOFT. c. PROVIDE AT EXTERIOR CEILINGS AND SOFFITS OVER 30-0"IN LENGTH IN ANY DIRECTION. TOTAL AREA BETWEEN CONTROL JOINTS SHALL NOT EXCEED 900 SOFT. it COORDINATE LOCATIONS WITH ARCHITECTURAL ELEMENTS ANDIOR AT THE DIRECTION OF THE ARCHITECT. F. REFERENCE INTERIOR ELEVATIONS FOR GYPSUM BOARD SOFFITS ABOVE CABINETS. G. SEE INTERIOR ELEVATION ANDIOR SECTIONS FOR MOUNTING HEIGHTS OF ANY WALL MOUNTED LIGHT FIXTURES. ® 2k4'SUSPENDED ACOUSTICAL CEILING W/2X2 LOOK GYPSUM BOARD CEILING CEILING TYPE AQ 1 CEILING IDENTIFICA FINISH HEIGHT(AFF) CEILING TYPE LEGEND ACT-1 — 2x4 ACOUSTICAL PANELS WI 2X2 LOOK ('DUNE BY ARMSTRONG) 'SUM BOARD, PAINTED L PANELS WI 2X2 LOOK, SCRUBBABLEI WASHABLE ('KITCHEN ZONE' BY NOTES: A. REFER TO 313TSCALE SHEETS FOR PLAN KEYNOTES. B. REFER TO SHEET 0121 FOR CEILING DEMOLITION. C. ALL DEMOLTION DIMENSIONS ARE PROVIDED FOR REFERENCE ONLY CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS. D. SHADED AREA INDICATES AREA OF PREVIOUS AND FUTURE WORK. n OAMERICAN M■ STRUCTUREPOINT INC III 7260 alwpelanp ehtian I IMisnapolle, Indiana M256 TEL 31].31].5580 1 131I317.393.0270 www.wmormmoim.nom GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 CERTIFIED BY ISSUANCEINDEX DATE: O5/31N9 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE NO. DESCRIPTION DATE Project Number 2017.01381 OVERALL FIRST FLOOR REFLECTED CEILING PLAN Subject to compliance with all regulations at State and Local Codes City of Cam ed DATE: 09/24/19 N OVERALL FIRST FLOOR RCP N KEY PLAN 12" = V-0• A121