HomeMy WebLinkAboutA121.A ENLARGED FIRST FLOOR REFLECTED CEILING PLANI
— — — — — — a
GVF'
14'-10 UB" '-,j
91
`0
a j
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Cannel
eH el eJ K eL
N
FIRST FLOOR RCP
121. 3/32" = V-0"
KEYED REF. CEILING PLAN NOTES (NOTED WITH 0 )
1 ALIGN FACE OF BULKHEAD W/ FACE OF ADJACENT WALL
2 V 6 6 E EE /�2/
ARM STRONG 24"X24" WOODWORKS GRILLE TEGULAR TILES ON A
Q SUSPENSION SYSTEM WITH HORIZONTAL SLATS WITH 4' AXIOM
WO TRIM
4 IG E W H / O TI L D-
PATCH EXISTING BULKHEAD SO TRANSITION APPEARS SEAMLESS
5 EXPOSED CEILING
6 EXISTING BULKHEAD TO REMAIN
7 AREA OF NEW CEIING GRID INFILLAND NEW CEILING TILES.
CONTRACTOR TO COORDINATE CONNECTION TO RE -USED CEILING
GRID AS REQUIRED FOR UNIFORM CEILING HEIGHT AND
APPEARANCE
8 AREA OF RE -USED CEILING GRID WITH NEW CEILING TILES.
CONTRACTOR TO CORDINATE CONNECTION BETWEEN NEW AND
EXISTING CEILING GRID; SPLICE AND REHANG CEILING AS REQUIRE
FOR A UNIFORM HEIGHTAND APPEARANCE. PROVIDE 20%
CONTINGENCY TO CLEAN, REPAIR AND PAINT EXISTING GRID WHERE
DAMAGED
9 EXISTING CEILING TO REMAIN, PATCH AND REPAIR AS NEEDED
10 OVERHEAD SECURITY GRILLE - REF. SHEETA501
eK
02 COFFEE SHOP RCP
A! 1/4" = V-0"
REFLECTED CEILING PLAN LEGEND
A. PLL CEILINGS TO BE ACT-1 U.N.O.
B. ALL A.C.T. CEILINGSTO BE 9-TA.F.F. USING 1511TWHITE METALTEE GRID. U.N.O.
C. PROVIDE 3-112" SOUND BATTS OVER CEILING IN ENTIRE ROOM AND 24" BEYOND OUTSIDE WALL AT ALL
TOILETS AND CONFERENCE ROOMS WITH SOUND RATED WALLS,
D. ALL GYPSUM BOARD CEILINGS TO BE T-TA.FF. UNLESS NOTED OTHERWISE
E. GYPSUM BOARD CONTROL JOINTS:
a. PROVIDE AT INTERIOR CEILINGS (WITH PERIMETER RELIEF)OVER W-0'IN LENGTH IN MY DIRECTION.
TOTAL AREA BETWEEN CONTROL JOINTS SHALL NOT EXCEED 2500 SOFT
b. PROVIDE AT INTERIOR CEILINGS (WITHOUT PERIMETER RELIEF)OVER 30'-0"IN LENGTH IN ANY DIRECTION.
TOT& AREA BETWEEN CONTROL JOINTS SHPLL NOT EXCEED NO SQFT
c. PROVIDE AT EXTERIOR CEILINGS AND SOFFITS OVER 30'-0" IN LENGTH IN ANY DIRECTION. TOTAL AREA
BETWEEN CONTROL JOINTS SHALL NOT EXCEED 900 SOFT
d. COORDINATE LOCATIONS WITH ARCHITECTURAL ELEMENTS ANDIOR AT THE DIRECTION OF THE
ARCHITECT.
F. REFERENCE INTERIOR ELEVATIONS FOR GYPSUM BOARD SOFFITS ABOVE CABINETS.
G. SEE INTERIOR ELEVATION ANDIOR SECTIONS FOR MOUNTING HEIGHTS OF ANY WPLL MOUNTED LIGHT
FIXTURES.
® 2k4'SUSPENDED ACOUSTICAL CEILING W/2X2 LOOK
GYPSUM BOARD CEILING
CEILING TYPE
ACT-1
P80. CEILING IDENTIFICATION
FINISH HEIGHT(AFF)
CEILING TYPE LEGEND
ACT-1 - a4 ACOUSTICAL PANELS W/2X2 LOOK (DUNE' BY ARMSTRONG)
GYP-1- 59' TYPE'X GYPSUM BOARD, PAINTED
ACT-4- 2X4 ACOUSTICAL PANELS W/2X2 LOOK, SCRUBBABLEI WASHABLE('IOTCHEN ZONE' BY
ARMSTRONG
— e18
e4 2
e2.7
e2.4
e2.3
— e2
NOTES:
A. REFER TO 3I3TSCALE SHEETS FOR PLAN KEYNOTES.
B. REFER TO SHEET D121 FOR CEILING DEMOLITION.
C. ALL DEMOLITION DIMENSIONS WE PROVIDED FOR
REFERENCE ONLY CONTRACTOR SHALL FIELD VERIFY ALL
MEASUREMENTS.
D. SHADED AREA INDICATES AREA OF PREVIOUS AND
FUTURE WORK
N
*(�:) KEY PLAN
12" = T-0"
31
OAMERICAN
M■
STRUCTUREPOINT
INC
7260 smeelane srman I imianapoim, Indiana M256
TEL 317.M7.Ra0 I FI1I317.393.0270
www.mururepoim.nam
GEICO CORPORATE
FIRST FLOOR
RENOVATION PHASE 3
101 W. 103RD ST.
INDIANAPOLIS, IN 46290
CERTIFIED BY
ISSUANCEINDEX
DATE:
O5/31/'19
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
PHASE 3
REVISION SCHEDULE
NO.
DESCRIPTION
DATE
1
ADDENDUM 001
07/12/19
3
IPRO01
1 09/05/19
Project Number 2017.01381
ENLARGED FIRST
FLOOR REFLECTED
CEILING PLAN
A121.A
DATE: 09/24/19