Loading...
HomeMy WebLinkAboutA401 ENLARGED PLANS AND ELEVATIONSPROVIDE ZX BLOCK IN WALL AS NEEDED SOLID SURFACE (QTZ-1) SHELVES WI ROUNDED EDGE PLASTIC LAMINATE (PLA) MICROWAVE CABINET - RETURN END PANELS TO BACK WALL SOLID SURFACE COUNTERTOP (QTZ-1) WI ROUNDED EDGE PROVIDE 2X BLOCK IN WALL AS NEEDED PLASTIC LAMINATE BASE CABINET (PL-1) WITH ADJUSTABLE SHELVING 1g MICROWAVE CABINET DETAIL A401 3W = 1. 0" BACKSPLASH WALL TILE TO EXTEND FROM COUNTERTOP TO UNDERSIDE OF CEILING (AI T-6" 2' 2'-6' 1 2'-6' 1 2'-0" 1 2'-0" 1 2'-0" 1 2'-0" 1 2'-6' 1 2'-6' 1 CONDIMENT STATION A4a1 1/4" = 1-0" TURN DOWN COUNTERTOP END PANEL, BOTH SIDES OF COUNTERTOP(QTZ-1) BACKSPLASH TO EXTEND FROM COUNTER TO UNDERSIDE OF CEILING (OUT-1) SOLID SURFACE COUNTERTOP W112"DIA. REFUSE OPENING -TURN DOWN AT END PANEL (QTZ- 1) PLASTIC LAMINATE BASE CABINETS WI WIRE PULLS AND FILLER PANELS (PL-1) 3 1g TRASH BIN A401 1/4" = l'-0" SOLID SURFACE SHELVES (QTZ-1) PLASTIC LAMINATE (PL-1) MICROWAVE TOWER -ALIGN WI CABINETS BELOW, BOTH SIDES SOLID SURFACE COUNTERTOP(QTZ-I) PLASTIC LAMINATE BASE CABINETS WI WIRE FULLS AND FILLER PANELS (PLA ) 1�l CONDIMENTS A401 1/4" = V-0" SOLID SURFACE COUNTER (QTZ-1) PLASTIC LAMINATE BASE CABINETS W/ W IRE PULLS AND FILLER PANELS SOLID SURFACE (QTZ-11 2'-6" T-0" 2'-0" 2'-0' 6'-21f2" SOLID SURFACE TURN DOWN COUNTERTOP COUNTER (QTZ-1) EPBOTH SIDES OF tIo COFFEE SHOP 7 IPMENTMENT EQUIPMENT A401 114" = V-0" 30LID SURFACE :OUNTERTOP (QTZ-1) IASTIC LAMINATE(PLA) NOOD GRAIN TO RUN IN IERTICAL DIRECTION RELEASED FOR CONSTRUCTION COFFEE SHOP 1 A401 Subject to compliance with all regulations 114" = l'-0" of State and Local Codes City of Camel DATE: 09/24/19 PLASTIC LAMINATE FILE EXISTING STOREFRONT TO CABINET (PL-i) REMAIN, PROTECT DURING CONSTRUCTION SOLIDSURFACE - COUNTERTOP -REF. FINISH PLANS (Q1Z-1) / SOLID SURFACE (QTZ-1) COUNTERTOP -REF FINISH PLANS. ALIGN TOP OF / COUNTER WI TOP OF EXIST. PLASTIC LAMINATE(PLA) / MULLION FILECABINETS / _ INFILL GAP IN STOREFRONT BELOW COUMERTOP WI - - WALL TYPE'A3' - LAMINATE END PANEL(PLA) RESILIENT F. RESILIENT BASE -REF. FINISH PLANS FINISH FLANS 3I4 1 SECURITY 1� SECURITY FRONT DESK A401 1/4"= 1'-0" A401 114" = V-0" BACKSPLASH TO EXTEND FROM COUNTER TO UNDERSIDE OF CEILING (VII SOLID SURFACE COUNTERTOP(QTZ-i) PLASTIC LAMINATE BASE CABINETS WI WIRE PULLS AND HELER PANELS (PL-1) SOLID SURFACE COUNTERTOP (QTZ-1) WITH TURNDOWN AT END PANEL PLASTIC LAMINATE BASE CABINETS WI WIRE PULLS AND FILLER PANELS (PL-1) 1'-412' 3'-6" 3" COFFEE SHOP 6 A401 1/4" = V-o" BACKSPLASH TO EXTEND FROM SOLID SURFACE COUNTER TO UNDERSIDE OF COUNTERTOP(QTZ-1) CEILING (OUT-1) PLASTIC LAMINATE BASE SOLID SURFACE CABINETS WIWIRE FULLS COUNTERTOP (QTZ-1)WITH AND FILLER PANELS(PLA) 17 DIA. REFUSE OPENING PLASTIC LAMINATE BASE CABINETS WI WIRE PULLS - AND FILLER PANELS (PL-1) a PLASTIC LAMINATE BLANK — COMER BASE CABINET WI FILLER PANELS (PL-1) 13 TRASH PAINT(PT-1) SOLID SURFACE COUNTERTOP(QTZ-1) WITH TURNDOWN AT END PANEL 24A 1'-10" PLASTIC LAMINATE(PL-1) COFFEE SHOP 5 1 A 01 PROVIDE SCHLUTER TRIM PIECE AT WALLICABINET EDGE BACKSPLASH WALL TILE TO EXTEND FROM COUNTERTOP TO UNDERSIDE OF CEILING (OUT-2) 123B �� 2' 5" 1' 6" 3'-3" T-6" 4'. 2" 1' 91, 011 PLASTICLAMINATE END PANEL (PL-1) 12 COFFEE SHOP 9 A401 1W =,'-0' SOLID SURFACE COUNTERTOP (QTZ-1) WITH TURNDOWN AT END PANEL m c CASEWORK LEGEND © DOOADRAWER TO BE LOCKED WITH KEY CYLINDER. COORDINATE WITH OWNER ON KEYING REQUIREMENTS ❑K KEYBOARD TRAYS PROVIDED BY OWNER -30'WIDE UL UNDER UPPER CABINET LIGHT REFER TO ELECTRICAL OWES, APPLY T' LAMINATED APRON © GROMMETS- FINAL LOCATIONS TO BE COORDINATED WITH END USER © ACCESS PANEL FP FILLER PANEL ® EQUIPMENT -BY OTHERS KS KNEESPACE GENERAL CASEWORK NOTES: THE FOLLOWING NOTES ARE SPECIFIC TO CASEWORK AND ARE IN ADDITION TO THE GENERAL FINISH NOTES. A FIELD VERIFY ALL CASEWORK AND SHELVING DIMENSIONS. B ALL SHELVING SHOWN WITH DASHED LINES TO BE ADJUSTABLE D ALL ALE DRAWERS TO ACCEPT LETTER -SIZED FOLDERS, WITH TALL FILE TABS, AND HOLDERS, MINIMUM. D. COUNTERTOPS TO HAVE IIT'RADIUS AT EXPOSED CORNERS. E USE BLACK 212'DIAMETER GROMMETS WHERE GROMMETS ARE INDICATED. F. PROVIDE FINISHED END PANEL AT EXPOSED CASEWORK END S AND BACKS AS NEEDED. PANEL TO MATCH CASEWORK PLASTIC LAMINATE OR MELAMINEFINISH. G. ADD FILLER PANEL AS NEEDED AT CABINETS, WARDROBES, DRAWERS, APPLIANCES,ETC. TO ENSURE FULL D OOR SWING AND DRAWER OPERATI ON, H. ALL UPPER CABINETS TO BE 1 TOUT TO OUT UNLE SS NOTED OTHERWISE. I. ALL COUNTERTOPS TO EXTEND 1" BEYOND FRONT OF CABINET DOOR FACE. J. ALL BASE CABINETS TO BE 23"DEEP UNLESS NOTED OTHERWISE. K ALL COUNTERTOPS TO HAVE POST FORM PROFILE. L. ALL COUNTERTOPS ARE 110 THICK WITH 4"HIGH BACKISIDE SPLASHES UNLESS NOTED OTHERWISE M. PROVIDE SHEET METAL OR FIRE RETARDANT WOOD BLOCKING IN WALL CAVITIES FOR ITEMS THAT ARE REQUIRED TO BE SECURED TO THE WALLS. REFERENCE MECHANICAL, PLUMBING, ELECTRICAL AND TECHNOLOGY DRAWINGS. COORDINATE WITH FURNITURE SUPPLIER WHERE APPROPRIATE. N. PROVIDE ADJUSTABLE SHELVING AT ALL BASE CABINETS THAT WE NOT TRASH BINS HARDWARE: A LOCKABLE CABINETS AND WARDROBES ARE NOTED ON INTERIOR ELEVATIONS. KEYED FLOOR PLAN NOTES (NOTED WITH tO ) 1 NEW ALUMINUM STOREFRONT TO UNDERSIDE OF BULKHEAD ABOVE. 2 EXISTING DOOR, FRAME AND HARDWARE TO REMAIN. PAINT BOTH SIDES OF METAL DOORS TO MATCH ADJACENT WALL 3 FIRE EXTINGUISHER CABINET W/EXTINGUISHER. RE-USESALVAGED FIRE EXTINGUISHERS AND CABINETS FROM DEMOLITION PHASE 4 ALIGN NEW CONSTRUCTION CENTERED AND/OR FLUSH WITH EXISTING GEOMETRY. AT FLUSH CONDITIONS W/DRYWALL, PATCH AND REPAIR AS REQUIRED FOR SEAMLESS TRANSITION 5 AT EXISTING GYPSUM BOARD COLUMN SURROUND, PATCH/INFILL AND REPAIR AS REQUIRED FROM DEMOLITION. FIELD VERIFY FOR DESIGN INTENT. ALL ABANDONED OUTLETS AND FIRE EXTINGUISHER CABINET CAVITIES TO BE REPLACED BY DRYWALL FOR LIKE -NEW FINISH APPEARANCE 6 INFILL NEW WALL TO MATCH ADJACENTAROUND DEMOLISHED DOOR 7 CASEWORK/COUNTERTOP- REFER TO A400 SHEETS 8 REPAIR EXISTING CONSTRUCTION WHERE INTERSECTING WALL WAS DEMOLISHED AT EXTERIOR WINDOW - REF. DETAIL 31101.A 9 TURNSTILES @ SPACING AS SHOWN- REF. SPECIFICATIONS. CENTER TURNSTILE WING WALL ON MULLION AT STAIR EXISTING STOREFRONT RACEWAY STUB WALL 10 BELOW EQUIPMENT 11 BULKHEAD ABOVE- REF. REFLECTED CEILING PLANS OVERHANG 12 NEW DOOR OPENING IN EXISTING WALL, FIELD VERIFY AND COORDINATE WITH DOOR SCHEDULE TURNDOWN SOLID 13 PROTECT EXISTING WINDOW, METAL WINDOW SILL, BULKHEAD AND SURFACE(QTZ-1) WINDOW BLINDS DURING CONSTRUCTION. CAULK EXISTING METAL COUMERTOP SILL PER DETAIL 2/A101.A. REPAIR EXISTING WINDOW SILLS AS (QTZ-l) NEEDED 14 PROTECTEXISTING STOREFRONTAND REPLACEWINDOW PANEWITH ® SOLID ALUM. TRIM AROUND OPENING TO MATCH EXISTING _ STOREFRONT rx Ar TYP. 3 11 COFFEE SHOP 8 SOLID SURFACE COUNTERTOP (QTZ-1) WITH TURNDOWN AT END PANEL PLASTIC LAMINATE (P-A) WOOD GRAIN TO RUN IN VERTICAL DIRECTION PLASTIC LAMINATE (PL-1) RACEWAY STUB WALL BELOW EQUIPMENT OVERHANG TURN DOWN COUNTERTOP PLASTIC LAMINATE(PL-1) 0 COFFEE SHOP 4 EQUIPMEN`T�Q°Tz1)IDesoF �1 COFFEE SHOP 3 A4o1 114" = V-0" A401 114" = V-0" SOLID SURFACE COUNTERTOP(QTZ-1) rc rc a E TURN DOWN COUNTERTOP END PANEL, BOTH SIDES OF EQUIPMENT (QTZ-1) t5 COFFEE SHOP 2 A401 114" = V-0" SOLID SURFACE FULL ISOLIDSURFACE HEIGHTTURNDOWN(QTZ-1) O FULLHEIGHT B8 `" TURNDOWN 13'-33W (QTZl) B3 8" C� p F = _ UGO N O ® 124A ° TURNSTILE MAT SYSTEM WI ADA TRANSITI\ PART OF TNSTOURNSTINS TO B EPASBEMBLVROVIDED AS c COFFEE SOLID SURFACE TER NDQWN(QTZ-1� - eg — — — — — — — — n ROV SHOP iNA401 gl� — 31 T' 2,-8" T-8" 2'-8" 2'-8" 3'-0" 3'-2314" Lm pd� 12/ — iW-�< ADA TYP.TVP. TVA. GATE WING e, ------------- 107 / ----- ---------------- ADA STANDARD STANDARD STANDARD STANDARD GATE SOLID { SOLID SURFACE LANE LANE LANE LANE LANE LANE - SURFACE A(PA' FULL (e2.7� FULLHEIGHT HEIGHT III���IIg�CT7IIII TURNDOWN 1'-7318" 3'-8118" ]ill" -9" 6'-8" 3'-7V6" 1SHALE" TURNDOWN(QTZ- W TURNSTILE ASSEMBLY-C WALL TO (QTZ-i) 1) BE PROVIDED AS PART OF fi/A401 COUNTERTOPS SHALL TURNSTILE ASSEMBLY -CENTER EMEND BEYOND 2� FRAME ON STOREFRONT MULLION SOLID SURFACE TURNDOWN(QTZ-1) WALLS I"TYP. U.N.O. eK TURNSTILE SYSTEM WING WALL TO ' BE PROVIDED AS PART OF TURNSTILE % ASSEMBLY/el, j�eJ 11 COFFEE SHOP TURNSTILE ELEVATION TURNSTILE DETAILS A4o1 114" = V-o" A4a1 1/4" = V-IY Taal 1/4" = V-o" on OAMERICAN O■ STRUCTUREPOINT INC 7260 smpe,ana Srman I imianapo,m, Indiana M256 TEL 317.M7.MM 1 131lI317.393.0270 www.mu ummomaxam GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 CERTIFIED BY ISSUANCEINDEX DATE: 05/31/19 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE NO. DESCRIPTION DATE Project Number 2017.01381 ENLARGED PLANS AND ELEVATIONS A401