HomeMy WebLinkAboutD101 OVERALL FIRST FLOOR DEMOLITION PLANGENERAL DEMOLITION NOTES
e10
e9.7
R8
e7.8
e3.5
e3.2
e3 —
e2.T` —
e2.4
e2.3
2
EL
En
RELEASED FOR CONSTRUCTION
A. INVESTIGATE ALL EXISTING CONDITIONS (INCLUDING CONCEALED OR UNDOCUMENTED
CONDITIONS)PRIORTODEMOUTION. NOTIFY THE PROJECT TEAM OF ANY CONFLICTS
PRIOR TO PROCEEDING
B. ALL FURNITURE AND FURNISHINGS WILL BE REMOVED, RELOCATED ANDIOR STORED BY
OWNER UNLESS NOTED OTHERWISE.
C. ALL ITEMS BEING REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL
CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH
ITEMS. CONTRACTOR SHALL COORDINATE WITH OWNER REGARDING DELIVERY OF ALL
ITEMS BEING RETAINED; ALL ITEMS NOT BEING RETAINED BY THE OWNER OR
DESIGNATED ON THE DRAWINGS TO BE SALVAGED, RELOCATED OR REINSTALLED
SHALL BE COMPLETELY REMOVED FROM THE SITE.
Q THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INS TALL TEMPORARY DUST
PARTITIONS, CONSTRUCTION BARRIERS, TEMPORARY DOORS, WALK -OFF MATS AND
EQUIPMENT PROTECTION WHERE SHOWN ON THE DOCUMENTS OR IF NOT SHOWN, AS
REQUIRED BY THE WORK BEING PERFORMED. TEMPORARY DUST PARTITION SHALL BE
COMPLETELY SEALED TO PREVENT CONSTRUCTION DUST FROM ENTEWNG OWNER'S
ADJACENT SPACES. DUST PARTITION DOOR TO BE SELF CLOSING, POSITIVE LATCHING,
AND PAD -LOCKABLE. SUCH PROTECTION SHALL BE MAINTAINED AND REPAIRED
PROMPTLY IF DAMAGED TO AVOID DUST INFILTRATION INTO ADJACENT AREAS.
PROVIDE HEPA FILTER FILTRATION AND NEGATIVE AIR MACHINES WITH MONITORING
GAUGES. THE DEMOLITION CONTRACTOR SHALL ERECT TEMPORARY PARTITIONS AS
NEEDED BETWEEN THE CURRENT LOBBY AND THE NEW LOBBY FOR CONTINUOUS
OPERATIONS OF LOBBY STAFF.
E. COVER ALL RETURN AIR GRILLES AND EXHAUST GRILLES IN CONSTRUCTION AREA WITH
MIN. MERV 13 FILTER MEDIA, CHANGED REGULARLY.
F. REFER TO MECHANICAL,ELECTRICAL, AND PLUMBING DOCUMENTS FOR RESPECTIVE
DEMOLITION INFORMATION.
G. FILL ALL FLOOR CONSTRUCTION WHERE PIPING, CONDUITS, AND OTHER
PENETRATIONS HAVE BEEN REMOVED.
H. DEMOLITION WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS UNLESS
NOISE WILL EXCEED OSHA THRESHOLDS. IF NOSE IS ANTICIPATED TO EXCEED OSHA
THRESHOLDS, CONTRACTOR SHALL COORDINATE WITH OWNER TO ADJUST WORK
HOURS TO MORE APPROPRIATE TIMES. CONTRACTOR SHALL USE ALL METHODS TO
DECREASE NOISE IMPACT.
I. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITS,
EXIT LIGHTING, FIRE PROTECTIVE DEVICES AND ALARMS FOR THE ENTIRE BUILDING
SHALL BE CONTINUOUSLY MAINTAINED. DAY-TO-DAY FUNCTION OF THE REST OF THE
BUILDING SHALL BE FULLY MAINTAINED.
J. ASBESTOS CONTAINING MATERIAL IS NOT ANTICIPATED IN THE AREA OF DEMOLTION. IF
ACMs ARE SUSPECTED OR ENCOUNTED, CONTRACTOR SHALL NOTIFY THE ARCHITECT
IMMEDIATELY.
K. REMOVE ALL WALL COVERING, OTHER WALL TREATMENT, AND ATTACHMENTS. PATCH,
SKIM COAT, AND PREPARE FOR FINAL FINISH ON WALLS NOT BEING COVERED BY NEW
CONSTRUCTION.
L. IF USING A DEMOLITION CHUTE, IT SHALL BE FULLY ENCLOSED.
M. CONTRACTOR TO REMOVE ALL PROJECTOR EQUIPMENT AND MOUNTINGS AND TURN
OVER TO OWNER.
KEYED DEMO PLAN NOTES (NOTED WITH O )
1 REMOVE WALL CONSTRUCTION IN IT'S ENTIRETY. PRIOR TO
DEMOLITION, CAREFULLY INVESTIGATE CONCEALED CONDITIONS TO
VERIFY THERE IS NO ACTIVE INFRASTRUCTURE. WHERE WALL TO BE
DEMOLISHED STOPS SHORT OF CEILING, CAREFULLY REMOVE WALL
CONSTRUCTION TO MINIMIZE CEILING GRID REPAIR UNLESS NOTED
OTHERWISE
2 DEMO CASEWORK
3 ALL ABANDONED OR UNECESSARY FIXTURES, OUTLETS OR
COVERPLATES TO BE REMOVED. MEP TRADES TO REMOVE/CAP ITEMS
AS REQUIRED SO THEY ARE FULLY CONCEALED BY NEW
CONSTRUCTION/FINISHES. EXPOSED COVERPLATES OR CAPS ARE
NOT ACCEPTABLE UNLESS SPECIFICALLY APPROVED BY PROJECT
TEAM. THIS NOTE IS TYPICAL, THROUGHOUT ENTIRE FIRST FLOOR
4 REMOVE DOOR AND/OR GLAZING INCLUDING FRAME AND HARDWARE.
TURN HARDWARE OVER TO OWNER
5 REMOVE CEILING TILE, GRID AND SUSPENSION SYSTEM IN IT'S
ENTIRETY. RE -SUPPORT REMAINING ADJACENT CEILING GRID AS
REQUIRED. COORDINATE WITH NEW CONSTRUCTION
6 REMOVE FLOORING. REMOVE ADHESIVE/GROUT
7 REMOVE EXISTING PLUMBING FIXTURE; PLUMBING TRADES TO
CAP/REMOVE PIPING AS REQUIRED
8 FOOD SERVICE CONTRACTOR TO REMOVE EQUIPMENT AND STORE
FOR OWNER TO RELOCATE.
9 REMOVE EXISTING WALL CONSTRUCTION AS REQUIRED FOR NEW
DOOR ROUGH OPENING
10 REMOVE SECTION OF EXISITNG STOREFRONT AS SHOWN IN
ELEVATIONS AND PREP FOR NEW OPENING
11 REMOVE EXISTING DOOR AND FRAME IN PREPARATION FOR NEW
DOOR AND ALUMINUM FRAME - TURN HARDWARE OVER TO OWNER
12 EXISTING MEP ROOMS TO REMAIN
13 EXISTING WINDOWS, METAL SILL, KNEE WALL, BULKHEAD AND BLINDS
TO REMAIN. PROTECTAS REQUIRED
14 EXISTING GYPSUM BOARD COLUMN SURROUND TO BE REMOVED AND
REINSTALLED AS PART OF NEW WORK. ADJACENT CONSTRUCTION
THAT IS BEING DEMOLISHED SHOULD BE CAREFULLY REMOVED TO
MINIMIZE REPAIR AND PATCHING. REMOVE AND RETAIN FIRE
EXTINGUISHER CABINET HOUSINGS WHERE THEY EXIST. RETAIN
EXISTING FIRE EXTINGUISHERS FOR RE -USE
15 WHERE DEMOLISHED WALL CONSTRUCTION INTERSECTS EXTERIOR
WINDOW MULLION, REFER TO DETAIL 20101.A
16 REMOVE ACCORDION GRILLE, FRAME, AND HARDWARE IN ENTIRETY
17 REMOVE BULKHEAD IN ENTIRETY
18 DEMOLISH ALL CEILING TILES. EXISTING CEILING GRID TO BE
REPAIRED THEN RE -INSTALLED AS REQUIRED FOR NEW
CONSTRUCTION
19 DEMOLISH DAMAGED CEILING TILES ONLY, THIS ROOM. EXISTING
CEILING GRID TO BE REPAIRED THEN RE -INSTALLED AS REQUIRED FOR
NEW CONSTRUCTION
20 REMOVE PORTION OF WALL TO DIMENSION INDICATED
21 REMOVE AND SALVAGE DIRTT WALL AND STORE FOR OWNER
22 REMOVE EXISTING STOREFRONT AND TURN OVER TO OWNER TO
RELOCATE
NOTES:
A. REFER TO 3137SCALE SHEETS FOR PLAN KEYNOTES.
B. REFER TO SHEET D121 FOR CEILING DEMOLITION.
C. ALL DEMOLITION DIMENSIONS ARE PROVIDED FOR
REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY ALL
MEASUREMENTS.
D. SHADED AREA INDICATES AREA OF PREVIOUS AND
FUTURE WORK
n
OAMERICAN
Mâ– STRUCTUREPOINT
INC
7260 smeelane erman I imianapoiie, Indiana M236
TEL 317.M7.MM I fIX317.393.0270
www.muorurepoim.nam
GEICO CORPORATE
FIRST FLOOR
RENOVATION PHASE 3
101 W. 103RD ST.
INDIANAPOLIS, IN 46290
CERTIFIED BY
ISSUANCEINDEX
DATE:
O5/31/19
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
PHASE 3
REVISION SCHEDULE
NO. DESCRIPTION DATE
Project Number 2017.01381
OVERALL FIRST
FLOOR DEMOLITION
PLAN
Subject to compliance with all regulations
of State and Local Codes
City of Carmel
DATE: 09/24/19
OVERALL FIRST FLOOR DEMOLITION PLAN
1/16" = V-0'
N KEY PLAN
12•=VLOR
D101