HomeMy WebLinkAboutD101.A FIRST FLOOR DEMOLITION PLAN -AREA A_DeC eK TYPICAL DEMO AT 12" = V-OF I 2 2 1LI GENERAL DEMOLITION NOTES A. INVESTIGATE ALL EXISTING CONDITIONS (INCLUDING CONCEALED OR UNDOCUMENTED CONDITIONS) PRIORTO DEMOLITION. NOTIFYTHE PROJECT TEAM OF ANY CONFLICTS PRIOR TO PROCEEDING B. ALL FURNITURE AND FURNISHINGS WILL BE REMOVED, RELOCATED ANDIOR STORED BY OWNER UNLESS NOTED OTHERWISE. C. ALL ITEMS BEING REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. CONTRACTOR SHALL COORDINATE WITH OWNER REGARDING DELIVERY OF ALL ITEMS BEING RETAINED; ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS TO BE SALVAGED, RELOCATED OR REINSTALLED REMOVE WALL CONSTRUCTION SHALL BE COMPLETELY REMOVED FROM THE SITE. FLUSH WITH EXISTING BULKHEAD D. THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL TEMPORARY DUST PARTITIONS, CONSTRUCTION BARRIERS, TEMPORARY DOORS, WALK -OFF MATS AND EQUIPMENT PROTECTION WHERE SHOWN ON THE DOCUMENTS OR IF NOT SHOWN, AS REQUIRED BY THE WORK BEING PERFORMED. TEMPORARY DUST PARTITION SHALL BE a� COMPLETELY SEALED TO PREVENT CONSTRUCTION DUST FROM ENTERING OWNER'S — CAREFULLY REMOVE WALL ADJACENT SPACES. DUST PARTITION DOOR TO BE SELF CLOSING, POSITIVE LATCHING, CONSTRUCTION FLUSH TO AND PAD -LOCKABLE. SUCH PROTECTION SHALL BE MAINTAINED AND REPAIRED EXISTING MULLION. REPAIR PROMPTLY IF DAMAGED TO AVOID DUST INFILTRATION INTO ADJACENT AREAS. MULLION AS REQUIRED PROVIDE HEPA FILTER FILTRATION AND NEGATIVE AIR MACHINES WITH MONITORING GAUGES. THE DEMOLITION CONTRACTOR SHALL ERECT TEMPORARY PARTITIONS AS NEEDED BETWEEN THE CURRENT LOBBY AND THE NEW LOBBY FOR CONTINUOUS — CAREFULLY REMOVE WALL OPERATIONS OF LOBBY STAFF. CONSTRUCTION FLUSH TO EXISTING E. COVER ALL RETURN AIR GRILLES AND EXHAUST GRILLES IN CONSTRUCTION AREA WITH METAL WINDOW SILLUDIGYP MIN. MERV 13 FILTER MEDIA CHANGED REGULARLY. IEEE 03DIA1 FOR F. REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DOCUMENTS FOR RESPECTIVE REPAIR DEMOLITION INFORMATION. G. FILL ALL FLOOR CONSTRUCTION WHERE PIPING, CONDUITS, AND OTHER a PENETRATIONS HAVE BEEN REMOVED. H. DEMOLITION WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS UNLESS NOISE WILL EXCEED OSHA THRESHOLDS. IF NOISE IS ANTICIPATED TO EXCEED OSHA THRESHOLDS, CONTRACTOR SHALL COORDINATE WITH OWNER TO ADJUST WORT( HOURS TO MORE APPROPRIATE TIMES. CONTRACTOR SHALL USE ALL METHODS TO DECREASE NOISE IMPACT. L DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES AND ALARMS FOR THE ENTIRE BUILDING SHALL BE CONTINUOUSLY MAINTAINED. DAY-TQDAY FUNCTION OF THE REST OF THE BUILDING SHALL BE FULLY MAINTAINED. J. ASBESTOS CONTAINING MATERIAL IS NOT ANTICIPATED IN THE AREA OF DEMOLTION. IF _L/WINDOW MULLION ACWs MMED AEESUSPECTED OR ENCOUNTED, CONTRACTOR SHALL NOTIFY THE ARCHITECT K. REMOVE ALL WALL COVERING, OTHER WALL TREATMENT, AND ATTACHMENTS. PATCH, SKIM COAT, AND PREPARE FOR FINAL FINISH ON WALLS NOT BEING COVERED BY NEW CONSTRUCTION. L. IF USING A DEMOLITION CHUTE, IT SHALL BE FULLY ENCLOSED. M. CONTRACTOR TO REMOVE ALL PROJECTOR EQUIPMENT AND MOUNTINGS AND TURN OVER TO OWNER. KEYED DEMO PLAN NOTES (NOTED WITH O) 1 REMOVE WALL CONSTRUCTION IN ITS ENTIRETY. PRIOR TO DEMOLITION, CAREFULLY INVESTIGATE CONCEALED CONDITIONS TO VERIFY THERE IS NO ACTIVE INFRASTRUCTURE. WHERE WALL TO BE DEMOLISHED STOPS SHORT OF CEILING, CAREFULLY REMOVE WALL CONSTRUCTION TO MINIMIZE CEILING GRID REPAIR UNLESS NOTED OTHERWISE 2 DEMO CASEWORK 3 ALLABANDONED OR UNECESSARV FIXTURES, OUTLETS OR COVERPLATES TO BE REMOVED. MEP TRADES TO REMOVE/CAP ITEMS AS REQUIRED SO THEY ARE FULLY CONCEALED BY NEW CONSTRUCTIOWFINISHES. EXPOSED COVERPLATES OR CAPS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY APPROVED BY PROJECT TEAM. THIS NOTE IS TYPICAL, THROUGHOUT ENTIRE FIRST FLOOR 4 REMOVE DOOR AND/OR GLAZING INCLUDING FRAME AND HARDWARE. TURN HARDWARE OVER TO OWNER 5 REMOVE CEILING TILE, GRID AND SUSPENSION SYSTEM IN ITS ENTIRETY. RE -SUPPORT REMAINING ADJACENT CEILING GRID AS REQUIRED. COORDINATE WITH NEW CONSTRUCTION 6 REMOVE FLOORING. REMOVE ADHESIVE/GROUT REMOVE EXISTING PLUMBING FIXTURE; PLUMBING TRADES TO CAP/REMOVE PIPING AS REQUIRED 8 FOOD SERVICE CONTRACTOR TO REMOVE EQUIPMENT AND STORE FOR OWNER TO RELOCATE. Q 9 R ONE ISTI WAL ONS UCTI AS UIR FOR W O U E 10 REMOVE EXISTING DOOR AND HARDWARE FROM STOREFRONT AS SHOWN IN ELEVATIONS AND PREP FOR NEW OPENING. TURN DOOR OVER TO OWNER WHEN COMPLETE DOOR AND ALUMINUM FRAME - TURN HARDWARE OVER TO OWNER 12 EXISTING MEP ROOMS TO REMAIN uL u•�� �•u I A-`V N 13 EXISTING WINDOWS, METAL SILL, KNEE WALL, BULKHEAD AND BLINDS TO REMAIN. PROTECT AS REQUIRED 0014 EXISTING GYPSUM BOARD COLUMN SURROUND TO BE REMOVED AND e5. :� - - - - - - - - - - - - - - - - - J - - - - e5 REINSTALLED AS PART OF NEW WORK. ADJACENT CONSTRUCTION THAT IS BEING DEMOLISHED SHOULD BE CAREFULLY REMOVED TO 3�l EXTINMINIMGUISHER CABINET HOUSINGS REMOVE AND THEY ETAINXIST FIRE EXTINGUISHER XTING ISHER FOR WHERE THEY EXIST. RETAIN le4 8,� EXISTING FIRE EXTINGUISHERS FOR RE -USE y 15 WHERE INDOW MULLION, R WALLTO DETAIL INTERSECTS EXTERIOR WINDOW MULLION, REFER TO DETAIL CONSTRUCTION I 16 REMOVE ACCORDION GRILLE, FRAME, AND HARDWARE IN ENTIRETY iT REMOVE BULKHEAD IN ENTIRETY 18 DEMOLISH ALL CEILING TILES. EXISTING CEILING GRID TO BE REPAIRED THEN RE -INSTALLED AS REQUIRED FOR NEW CONSTRUCTION 19 DEMOLISH DAMAGED CEILING TILES ONLY, TH IS ROOM. EXISTING CEILING GRID TO BE REPAIRED THEN RE -INSTALLED AS REQUIRED FOR NEW CONSTRUCTION 20 REMOVE PORTION OF WALL TO DIMENSION INDICATED ' - - 04.2 21 REMOVE AND SALVAGE DIR17 WALL AND STORE FOR OW NER 22 REMOVEEXISTING STOREFRONT AND TURN OVERTOOWNERTO -4 23 REMOVEANDSALVAGE FIRE EXTINGUISHER CABINET AND FIRE �e4� RELOCATE 9 12'-6' I ------~ 6 6 - EXTINGUISHER IN ENTIRETY FOR REUSE IN NEW CONSTRUCTION ---- A ---- 23' S112---- r----———— ----=r _--=------------_r—_— --- ___ __ _ �e3T L I I as:asT - �rT'�T-�i4� - '4�� - - - _. �� i2I y 3�C V/"111 A`- I /� i121 - �- - -- --� ;2oI (1i J w�3�1� �' 1�F1 ��zfi�� 3'r1 B I I(sl (20,I 1201 I I I r� �° 1231� �11 12.I?o,� I L. �LJ� •�I����� I _,I� I I (iz1 (1zI �1zI le35� - L 1-1 2�I --- - - jj --, j �y 7i r"k r',�� -'---- — - I - zo7 - 41201jl - - - - _ - - �321 II[, I r�l I I —���� 1 . , 1 '741� II1� �e3� 2'I ^,I j II '2o II i •-I'� �.3. I I t141 ti'8� 1 2111 % l - 22 I v f� I I IIIt� N I I �s� C1o�> �s;� _� 1j I I I MI ,tiI �s �s ;201_ '`2j1 I I I I U 11 s�-n _ 41 '-'1IIj�I a3 -A 3 '�3 - k�,_6 a .'. , _ tije2w � eM eN e0 eP I eG I iz;:a�l LJL II IIr-1 I s �131 \? � I II 13 eG eH el eK eL RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Calmed ��1Y�Jl DATE: 09/24/19 NOTES: A. REFER TO 3I3TSCALE SHEETS FOR PLAN KEYNOTES. B. REFER TO SHEET D121 FOR CEILING DEMOLITION. C. ALL DEMOLITION DIMENSIONS WE PROVIDED FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS. D. SHADED AREA INDICATES AREA OF PREVIOUS AND FUTURE WORK N KEY PLAN �12. = V-0= V-D' GEICO _N O EeICAN ®■ STRUCTUREPOINT 7260 SM1adeland Slation I Indianapolis, Indiana M256 TEL 31].54].5560 1 fA%31].503.02]0 www.Snetumpnim.00m GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 CERTIFIED BY ISSUANCEINDEX DATE: 05/37N9 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE NO. I DESCRIPTION I DATE Project Number 2017.01381 FIRST FLOOR DEMOLITION PLAN - AREA A/D D 1010A