HomeMy WebLinkAboutD121 FIRST FLOOR DEMOLITION REFLECTED CEILING PLANGENERAL DEMOLITION NOTES 1zr RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Cannel A1mi\G3 andI OVERALL FIRST FLOOR DEMOLITION RCP 1/16' = 1'-T A. INVESTIGATE ALL EXISTING CONDITIONS (INCLUDING CONCEALED OR UNDOCUMENTED CONDITIONS) PRIOR TO DEMOLITION. NOTIFY THE PROJECTTEAM OF ANY CONFLICTS PRIOR TO PROCEEDING B. ALL FURNITURE AND FURNISHINGS WILL BE REMOVED, RELOCATED ANDOR STORED BY OWNER UNLESS NOTED OTHERWISE. C. ALL ITEMS BEING REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. CONTRACTOR SHALL COORDINATE WITH OWNER REGARDING DELIVERY OF ALL ITEMS BEING RETAINED; ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS TO BE SALVAGED, RELOCATED OR REINSTALLED SHALL BE COMPLETELY REMOVED FROM THE SITE D. THE DEMOLITION CONTRACTOR SHALL PROVIDE AND INSTALL TEMPORARY DUST PARTITIONS, CONSTRUCTION BARRIERS, TEMPORARY DOORS, WAU(-OFF MATS AND EQUIPMENT PROTECTION WHERE SHOWN ON THE DOCUMENTS OR IF NOT SHOWN, AS RE WIRED BY THE WORK BEING PERFORMED. TEMPORARY DUST PARTITION SHALL BE COMPLETELY SEALED TO PREVENT CONSTRUCTION DUST FROM ENTERING OWNER'S ADJACENT SPACES. DUST PARTITION DOOR TO BE SELF CLOSING, POSITIVE LATCHING, AND PAD{OCKABLE. SUCH PROTECTION SHALL BE MAINTAINED AND REPAIRED PROMPTLY IF DAMAGED TO AVOID DUST INFILTRATION INTO ADJACENT AREAS. PROVIDE HEPA FILTER FILTRATION AND NEGATIVE AIR MACHINES WITH MONITORING GAUGES. THE DEMOLITION CONTRACTOR SHALL ERECTTEMPORARY PARTITIONS AS NEEDED BETWEEN THE CURRENT LOBBY AND THE NEW LOBBY FOR CONTINUOUS OPERATIONS OF LOBBY STAFF. E. COVER ALL RETURN AIR GRILLES AND EXHAUST GRILLES IN CONSTRUCTION AREA WITH MIN. MERV 13 FILTER MEDIA, CHANGED REGULARLY. F. REFER TO MECHANICAL, ELECTRICAL, AND PLUMBING DOCUMENTS FOR RESPECTIVE DEMOLITION INFORMATION. G. FILL ALL FLOOR CONSTRUCTION WHERE PIPING, CONDUITS, AND OTHER PENETRATIONS HAVE BEEN REMOVED. H. DEMOLITION WORK SHALL BE PERFORMED DURING NORMAL WORKING HOURS UNLESS NOISE WILL EXCEED OSHA THRESHOLDS. IF NOISE IS ANTICIPATED TO EXCEED OSHA THRESHOLDS, CONTRACTOR SHALL COORDINATE WITH OWNER TO ADJUST WORK HOURS TO MORE APPROPRIATE TIMES. CONTRACTOR SHALL USE ALL METHODS TO DECREASE NOISE IMPACT. I. DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION, ALL EXISTING EXITS, EXIT LIGHTING, FIRE PROTECTIVE DEVICES AND ALARMS FOR THE ENTIRE BUILDING SHALL BE CONTINUOUSLY MAINTAINED. DAY -TODAY FUNCTION OF THE REST OF THE BUILDING SHALL BE FULLY MAINTAINED. J. ASBESTOS CONTAINING MATERIAL IS NOT ANTICIPATED IN THE AREA OF DEMOLTION.IF ACM's ARE SUSPECTED OR ENCOUNTER CONTRACTOR SHALL NOTIFY THE ARCHITECT IMMEDIATELY K. REMOVE ALL WALL COVERING, OTHER WALL TREATMENT, AND ATTACHMENTS. PATCH, SKIM COAT, AND PREPARE FOR FINAL FINISH ON WALLS NOT BEING COVERED BY NEW CONSTRUCTION. L. IF USING A DEMOLITION CHUTE, IT SHALL BE FULLY ENCLOSED. M. CONTRACTOR TO REMOVE ALL PROJECTOR EQUIPMENT AND MOUNTINGS AND TURN OVER TO OWNER. KEYED DEMO PLAN NOTES (NOTED WITH O) 1 REMOVE WALL CONSTRUCTION IN ITS ENTIRETY. PRIOR TO DEMOLITION, CAREFULLY INVESTIGATE CONCEALED CONDITIONS TO VERIFY THERE IS NO ACTIVE INFRASTRUCTURE. WHEREWALLTOBE DEMOLISHED STOPS SHORT OF CEILING, CAREFULLY REMOVE WALL CONSTRUCTION TO MINIMIZE CEILING GRID REPAIR UNLESS NOTED OTHERWISE 2 DEMOCASEWORK 3 ALL ABANDONED OR UNECESSARY FIXTURES, OUTLETS OR COVERPLATES TO BE REMOVED. MEP TRADES TO REMOVE/CAP ITEMS AS REQUIRED SO THEY ARE FULLY CONCEALED BY NEW CONSTRUCTIOWFINISHES. EXPOSED COVERPLATES OR CAPS ARE NOT ACCEPTABLE UNLESS SPECIFICALLY APPROVED BY PROJECT TEAM. THIS NOTE IS TYPICAL, THROUGHOUT ENTIRE FIRST FLOOR 4 REMOVE DOOR AND/OR GLAZING INCLUDING FRAME AND HARDWARE. TURN HARDWARE OVER TO OWNER 5 REMOVE CEILING TILE, GRID AND SUSPENSION SYSTEM IN IT'S ENTIRETY. RE -SUPPORT REMAINING ADJACENT CEILING GRID AS REQUIRED. COORDINATE WITH NEW CONSTRUCTION 6 REMOVE FLOORING. REMOVE ADHESIVE/GROUT 7 REMOVE EXISTING PLUMBING FIXTURE; PLUMBING TRADES TO CAP/REMOVE PIPING AS REQUIRED 8 FOOD SERVICE CONTRACTOR TO REMOVE EQUIPMENT AND STORE FOR OWNER TO RELOCATE. 9 REMOVE EXISTING WALL CONSTRUCTION AS REQUIRED FOR NEW DOOR ROUGH OPENING 10 REMOVE EXISTING DOOR AND HARDWARE FROM STOREFRONT AS SHOWN IN ELEVATIONS AND PREP FOR NEW OPENING. TURN DOOR OVER TO OWNER WHEN COMPLETE 11 REMOVE EXISTING DOOR AND FRAME IN PREPARATION FOR NEW DOOR AND ALUMINUM FRAME - TURN HARDWARE OVER TO OWNER 12 EXISTING MEP ROOMS TO REMAIN 13 EXISTING WINDOWS, METAL SILL, KNEE WALL, BULKHEAD AND BLINDS TO REMAIN. PROTECT AS REQUIRED 14 EXISTING GYPSUM BOARD COLUMN SURROUND TO BE REMOVED AND REINSTALLED AS PART OF NEW WORK. ADJACENT CONSTRUCTION THAT IS BEING DEMOLISHED SHOULD BE CAREFULLY REMOVED TO MINIMIZE REPAIR AND PATCHING. REMOVE AND RETAIN FIRE EXTINGUISHER CABINET HOUSINGS WHERE THEY EXIST. RETAIN EXISTING FIRE EXTINGUISHERS FOR RE -USE 15 WHERE DEMOLISHED WALL CONSTRUCTION INTERSECTS EXTERIOR WINDOW MULLION, REFER TO DETAIL 2/13101.A 16 REMOVE ACCORDION GRILLE, FRAME, AND HARDWARE IN ENTIRETY 17 REMOVE BULKHEAD IN ENTIRETY 18 DEMOLISH ALL CEILING TILES. EXISTING CEILING GRID TO BE REPAIRED THEN RE -INSTALLED AS REQUIRED FOR NEW CONSTRUCTION 19 DEMOLISH DAMAGED CEILING TILES ONLY, THIS ROOM. EXISTING CEILING GRID TO BE REPAIRED THEN RE -INSTALLED AS REQUIRED FOR NEW CONSTRUCTION 20 REMOVE PORTION OF WALL TO DIMENSION INDICATED 21 REMOVE AND SALVAGE DIRTT WALL AND STORE FOR OWNER 22 REMOVE EXISTING STOREFRONTAND TURN OVER TO OWNER TO RELOCATE 23 REMOVE AND SALVAGE FIRE EXTINGUISHER CABINET AND FIRE EXTINGUISHER IN ENTIRETY FOR REUSE IN NEW CONSTRUCTION NOTES: A. REFER TO 3/3Z'SCALE SHEETS FOR PLAN KEYNOTES. B. REFER TO SHEET D121 FOR CEILING DEMOLITION. C. ALL DEMOLRION DIMENSIONS WE PROVIDED FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY ALL MEASUREMENTS. D. SHADED AREA INDICATES AREA OF PREVIOUS AND FUTURE WORK N KEY PLAN 12' = 1'-T GEICO so OAPAMCAN ®■ STRUCTUREPOINT 7260 SM1adeland Smon I Indianapolis, Indiana M256 TEL 317.M7.55M I FU317.M3.0270 www.m eturepoim.00m GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 CERTIFIED BY ISSUANCEINDEX DATE: 05/31/19 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE NO. DESCRIPTION DATE 1 ADDENDUM 001 07/12/19 Project Number 2017.01381 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN D121 DATE: 09/24/19