HomeMy WebLinkAboutE401.A FIRST FLOOR POWER PLAN -AREA APANEL / CIRCUIT LEGEND
NW4=RINW4
NWS=RI NAI
NW6=RINW-6
SW1 = R,SW-1
SW2 = R1SW-2
RPP13 = RPP-13
E, = E1NW-1
SHEET GENERAL NOTES:
A. REFER TO SHEET E000 FOR ELECTRICAL
SYMBOLS, ABBREVIATIONS AND NOTES.
B. CIRCUITS SHOWN FOR CONNECTING LOADS.
ELECTRICAL CONTRACTOR HAS OPTION TO
UTILIZE EXISTING POWER CIRCUIT IN AREA.
THTING
r._
2
m
eE eF t
I
I I I
IMMOR
n
STING RPP13 G6
t
I I
OFFI
„e
I I I
I I
I I I
I I
I I
I
I
I
KEYNOTES:
1. SECURITY TURNSTILE POWER CONNECTION AT
FLOOR. ROUTE POWER UNDER SYSTEM
BASEPLATE TO EACH CABINET. REFER TO
MANUFACTURERS INSTALLATION
INSTRUCTIONS FOR MORE INFORMATION.
CONNECT TO EXISTING PANEL'RPP13'
LOCATED IN LAN 119.
2. POWER FOR DOOR SECURITY SYSTEM.
CONNECT TO EXISTING PANEL'RPP13'
LOCATED IN LAN 119.
3. 400A-3P BUS DUCT DISCONNECT FOR NEW
PANEL'RiNWS LOCATED IN KITCHEN. MATCH
EXISTING BUS DUCT RATING AND
CONSTRUCTION. REFER TO SHEET E601 FOR
ADDITIONAL INFORMATION.
4. EXISTING 15OA-3P BUS DUCT DISCONNECT FOR
NEW PANEL'R,NW4' LOCATED IN COFFEE
SHOP. REFER TO SHEET E601 FOR ADDITIONAL
INFORMATION., n
eH el eJ eK eL eM eN eO 5. CONNECTION TO WATER HEATER. CONNECT
TO EXISTING PANEL'PiSW-1'. COORDINATE
WITH MECHANICAL CONTRACTOR.
6. PROVIDE (2) 40A-3P BREAKERS IN EXISTING
SPACE OF EXISTING PANEL1P1SW-1'.
7. COORDINATE MOUNTING HEIGHT AND
LOCATION WITH TV MOUNTING BRACKET
PRIOR TO ROUGH -IN.
8. CONNECT UNIT TO EXISTING PANEL'H1SW-1'.
I I I I I I I I I
I I I I I I I I I
,�eeNa II ®®®., u�„ ,ma \ / sw,-s
�® ❑ sw,-s
I I I I Os-s I I I
— — — — — — — e5
-, 5 II
26,28,3E SW2-42
— — — — — SW2-36— — _ I} — — ,/ A dI
RELEASED FOR CONSTRUCTION CM
Subject to compliance with all regulations do R j
at State and meal Codes
City of Cannel
EXISTING P1SW
XI TINGR1SW
I
— e2
OAMERICAN
M■
STRUCTUREPOINT
INC
7260 SMEaIanE Soman I IMiwamiN, Indiana M256
TEL 317.M7.5560 I FAX317.593.0270
w.w.wruarureaoim.aam
r� u1 *4 -A
8900 KEYSTONE XING PH: 317.848.5045
SUITE 210 FAX 317.844.2201
INDIANAPOLIS, IN www.imegeorp.com
46240
GEICO CORPORATE
FIRST FLOOR
RENOVATION PHASE 3
101 W. 103RD ST.
INDIANAPOLIS, IN 46290
"' NO.
* 111400159
?o'`... STATE OF t�5
/ONA lnnE�Ga�ofi/ 1 4/ 1 9
CERTIFIED BYYY
ISSUANCEINDEX
DATE:
06N4/19
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
PHASE 3
REVISION SCHEDULE
INO.1 DESCRIPTION I DATE
Project Number 18002480.01
FIRST FLOOR POWER
PLAN - AREA A
E401.A
DATE: 09/24/19