Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
F000 FIRE PROTECTION COVERSHEET
IL En VIEW KEY NAME �LEVELNAME Q~ INDICATES NOTE USED TO DESCRIBE 10'HEIGHTABOVE ADDITIONAL INFORMATION ABOUT PROJECT 0'-0" WORK REQUIRED, SPECIFIC TO THE SHEET AND/OR DETAIL INDICATES DIRECTION OF TRUE NORTH PLAN OR DETAIL NUMBER PLAN OR DETAIL NAME /\ VIEW NAME PLAN OR DETAIL SCALE ORS INDICATES SIMILAR DETAIL SINK REFERENCED IN MULTIPLE LOCATIONS DETAIL REFERRED TO BY SECTION CUT 1 M101 SHEET DETAIL IS LOCATED ON INDICATES SIMILAR DETAIL SI REFERENCED IN MULTIPLE LOCATIONS -DETAIL REFERRED TO BY ELEVATION 4 3 T101f-SHEET DETAIL IS LOCATED ON LINE TYPE KEY: NEW WORK BY THIS CONTRACTOR (DARK SOLID LINE) -NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR (DARK LONG DASHED LINE) NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN (LIGHT SOLID LINE) -------EXISTING TO BE REMOVED BY THIS CONTRACTOR (DARK SHORT DASHED LINE) CONTRACTOR ABBREVIATION KEY ABBR: DESCRIPTION: A.C. ASBESTOS ABATEMENT CONTRACTOR A.T.C. AUTOMATIC TEMPERATURE CONTROL CONTRACTOR A.V.C. AUDIONISUAL CONTRACTOR C.C. CIVIL CONTRACTOR C.M. CONSTRUCTION MANAGER E.C. ELECTRICAL CONTRACTOR F.P.C. FIRE PROTECTION CONTRACTOR F.S.C. FOOD SERVICE CONTRACTOR G.C. GENERALCONTRACTOR H.C. HEATING CONTRACTOR M.C. MECHANICAL CONTRACTOR N.C.C. NURSE CALL CONTRACTOR P.C. PLUMBING CONTRACTOR S.C. SECURITY CONTRACTOR T.C. TECHNOLOGY CONTRACTOR T.C.C. TEMPERATURE CONTROLS CONTRACTOR V.C. VENTILATION CONTRACTOR FIRE PROTECTION ABBREVIATION KEY ABBR: DESCRIPTION: AD ACCESS DOOR AFF ABOVE FINISHED FLOOR BFP BACKFLOW PREVENTER I.E. INVERT ELEVATION NC NEW CONNECTION N.C. NORMALLY CLOSED NIC NOT IN CONTRACT N.O. NORMALLY OPEN TYP TYPICAL UNO UNLESS NOTED OTHERWISE FIRE PROTECTION SYMBOL LIST NOT ALL SYMBOLS MAY APPLY. SYMBOL: DESCRIPTION: -CAF- COMPRESSED AIR - FIRE PROTECTION -DFP- DRAIN -FP- FIRE PROTECTION -FPD- FIRE PROTECTION - DRY SYSTEM -W- SERVICE WATER -POTABLE PIPE CAP PIPE DOWN 0 PIPE UP OR UPMOWN NEW CONNECTION 41 UNION/FLANGE DIRECTION OF FLOW IN PIPE ROUTE TO DRAIN SHUTOFF VALVE NORMALLY OPEN 101 AUTOMATIC DRAIN VALVE aAIR PRESSURE MAINTENANCE DEVICE 04 AIR SUPERVISORY SWITCH ANGLE VALVE BUTTERFLYVALVE WITH MONITOR SWITCH CHECK VALVE INSPECTOR TEST AND DRAIN VALVE OSBY GATE VALVE OSBY GATE VALVE WITH MONITOR SWITCH FLOW SWITCH PRESSURE SWITCH © PRESSURE GAUGE (FURNISHED WITH BALL VALVE) MONITOR SWITCH -� AREA BOUNDARY NO HATCH LIGHT HAZARD ORDINARY GROUP 1 ORDINARY GROUP 2 DEMOLITION EXTRA GROUP 1 EXTRA GROUP 2 110 SPRINKLER - WALL MOUNTED • SPRINKLER O SPRINKLER -CONCEALED C1 SPRINKLER ® SPRINKLER 9 SPRINKLER *A SPRINKLER CIA SPRINKLER FIRE SPRINKLER USAGE SCHEDULE NOTES: 1. SEE FLOOR PLANS FOR ZONING REQUIREMENTS. 2. SPRINKLER SHALL HAVE COLOR CODED BULB THERMAL ELEMENT. 3. ALL SPRINKLERS SHALL BE ULAND FM LISTED. 4. CONTRACTOR TO VERIFY SPRINKLER REQUIREMENTS BASED ON ACTUAL INSTALLATION,USAGE, ARCHITECTURAL CEILING PLAN AND NFPA 13 REQUIREMENTS. 5. SYMBOL IS PRIMARILY FOR IDENTIFIYING SPRINKLERS IN SUBMITTALS. IT MAY OR MAY NOT BE FOUND ELSEWHERE ON THE DRAWINGS. CONTRACTOR TO SUBMIT ALL SPRINKLER TYPES TO BE USED. 6. AREAS ARE GENERAL IN NATURE. CONTRACTOR TO MATCH UNSCHEDULED AREAS TO SIMILAR SPACES. SPRINKLER AREA TYPE AREA TAG NAME RESPONSE TEMPERATURE (NOTE 1 & 6) HAZARD (NOTE 4 & 5) SPRINKLER TYPE CATEGORY FINISH RATING MANUFACTURER & MODEL NOTES AREAS WITHOUT SEE PLANS SPR-1 UPRIGHT QUICK ROUGH (155) VIKING M, RELIABLE F1FR, TYCO NOTE 3 CEILINGS BRASS Tv` -FRB, VICTAULIC V27N. AREAS WITH CEILINGS SEE PLANS SPR-2 RECESSED QUICK CHROME (155) VIKING M, RELIABLE FiFR, TYCO NOTES 2, 3 PENDENT PLATED TY-FRB, VICTAULIC V2708. FIRE PROTECTION MATERIAL LIST TAG NAME DESCRIPTION MANF. & MODEL SPR-1 SPRINKLER, QUICK -RESPONSE UPRIGHT, BULB TYPE, VIKING M, RELIABLE F1 FR, TYCO TY-FRB, VICTAULIC BRIGHT CHROME PLATED FINISH, 135-170 DEGREE F V2704. TEMPERATURE RANGE,''/z' ORIFICE, UUFM. SPR-2 SPRINKLER, QUICK -RESPONSE RECESSED PENDENT, VIKING M, RELIABLE F1 FR, TYCO TY-FRB, VICTAULIC BULB TYPE, BRIGHT CHROME PLATED SPRINKLER & V2708. ESCUTCHEON PLATE,135-170 DEGREE F TEMPERATURE RANGE, %" ORIFICE, UUFM. RELEASED FOR CONSTRUCTION MECHANICAL RENOVATION NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORTANY CONFLICTS BEFORE PROCEEDING. 2. NOTALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK. 3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD CONDITIONS. 4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK AND SHALL NOTIFYTHE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF WORK. 5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS. CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING 6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BYALL CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO BIDDING. 7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL EITHERARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH FASHION THAT IT DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK. 8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT REMAIN ACTIVE. 9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY REASON. MAINTAIN SERVICE TO ALL COMPONENTS THATARE TO REMAIN UNTIL NEW SYSTEMS ARE INSTALLED. 10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR TIE IN AND SW ITCHOVER. DRAIN SYSTEM ONLY TO MAKE SW ITCHOVERS AND CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE. 11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT THAT HAS BEEN REMOVED. MECHANICAL PHASING NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO ARCHITECTS INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENTWORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGSOEPICT THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA. 2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC. WITH AFFECTED ADJACENT AREAS. 3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF PROJECT. 4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT 5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME. JINA2:T9i11:191dIL[C34►14:71>!►[oil 11*3 1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT. 2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER IS THE BASIS OF DESIGN. 3. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT NUMBER OF SPRINKLERS PIPE SIZING AND PIPE ROUTING. 4. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS WITH 2'X4' CEILING TILES CENTERING USING A 2'X2' CEILING PATTERN IS ACCEPTABLE. 5. NEW SPRINKLERS SHALL BE QUICK RESPONSE TYPE, UNLESS OTHERWISE NOTED. CONTRACTOR SHALL NOT MIX STANDARD RESPONSE SPRINKLERS WITH QUICK RESPONSE SPRINKLERS IN UNPARTITIONED SPACES. 6. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48"WIDE. 7. PROVIDE COVERAGE ABOVE AND BELOW FLOATING CEILINGS. REFER TO ARCHITECTURAL PLANS. MECHANICAL GENERAL NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS. DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC., AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELVAS ACTUAL BUILDING CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT. 2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES. 3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH FABRICATION OR EQUIPMENT ORDERS. 4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER ACCESS. 5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR EXPENSE TO OTHERS. 6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF DESIGN. ]. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY AUDIOVISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES, OTHER THAN SPRINKLERS. B. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND FINISH. 9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING. 10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS PENETRATE. 11. CAULK ALL PIPE AND DUCT PENETRATIONS FULL HEIGHT NON -FIRE RATED WALL, PARTITION, FLOOR, AND ROOF ASSEMBLIES.. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS. 12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT. 13. EQUIPMANUFENT ACTURERS. AND SERVICE CLEARANCE REQUIREMENTS EQUIPMENT DIFFERENT MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS, PIPING, DUCTWORK, ETC. 14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES. 15. MAINTAIN MINIMUM CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR STARTERS, SWITCHES, AND DISCONNECTS. 16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL EXTEND MINIMUM 6mBEYOND ALL SIDES OF EQUIPMENT. E 17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS. M*IMEG vaG as INVILANIw eu p110 MEG CORP RESERVES RTORTIETARE' RGH S. INCLUDING Cq+YWGHTS. TO THIS n OAMERICAN M■ STRUCTUREPOINT INC III 7260 sMpnlana Suman I I4isnapolle, Indiana M256 TEL 317.M7.MM I FIA317.543.0270 www.mu ummoim.oan *IMEG 8900 KEYSTONE XING PH: 317.848.5045 SUITE 210 FAX 317.844.2201 INDIANAPOLIS, IN www.imegeorp.com 46240 GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 �r No. ,""(P kPE10505421 STATEOF iC j l �_ rt\.. /Al �s"°�06/14/19 CERTIFIED BY ISSUANCE INDEX DATE: 06/14/19 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE NO. DESCRIPTION DATE Project Number 18002480.01 FIRE PROTECTION COVERSHEET Subject to compliance with all regulations of State and Local Codes City of Cannel (� �VT�L1lEw3Ci1,DML DATE: 09/24/19 VPL AND PARTCPATGN CT INNER CORP. 0A181I Cd REFERENCE SCALE IN INCHES a 1 2 3 F000