Loading...
HomeMy WebLinkAboutM000 MECHANICAL COVERSHEETa RELEASED FOR CONSTRUCTION VIEW KEY �NAME LEVEL NAME �� INDICATES NOTE USED TO DESCRIBE 10'-0"�HEIGHTABOVE ADDITIONAL INFORMATION ABOUT PROJECT 0'-0" WORK REQUIRED, SPECIFIC TO THE SHEET AND/OR DETAIL INDICATES DIRECTION OF TRUE NORTH PLAN OR DETAIL NUMBER PLAN OR DETAIL NAME VIEW NAME `� PLAN OR DETAIL SCALE �ORZX 0 INDICATES SIMILAR DETAIL SINK REFERENCED IN MULTIPLE LOCATIONS DETAIL REFERRED TO BY SECTION CUT M101 SHEET DETAIL IS LOCATED ON INDICATES SIMILAR DETAIL Sim'REFERENCED IN MULTIPLE LOCATIONS DETAIL REFERRED TO BY ELEVATION 4 3 T101�SHEET DETAIL IS LOCATED ON LINE TYPE KEY: NEW WORK BY THIS CONTRACTOR (DARK SOLID LINE) -NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR (DARK LONG DASHED LINE) NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN (LIGHT SOLID LINE) - - - - - - - EXISTING TO BE REMOVED BY THIS CONTRACTOR (DARK SHORT DASHED LINE) MECHANICAL SYMBOL LIST NOT ALL SYMBOLS MAY APPLY. SYMBOL: DESCRIPTION: �D- BOILER BLOW DOWN �F- BOILER FEED WATER -CA- COMPRESSED AIR ---- CR- CONDENSER WATER RETURN -CS- CONDENSER WATER SUPPLY --CS15- CLEAN STEAM- NUMBER INDICATES PRESSURE IN PSIG. ---CWR- CHILLED WATER RETURN -CWS- CHILLED WATER SUPPLY -DPP- DRAIN �- NATURAL GAS -GV- GAS REGULATOR VENT -GWR- GLYCOL WATER RETURN �WS- GLYCOL WATER SUPPLY -HCR- HEATING/CHILLED WATER RETURN -HCS- HEATING/CHILLED WATER SUPPLY -HG- REFRIGERANT HOT GAS -HPC- HIGH PRESSURE CONDENSATE -HPS- HIGH PRESSURE STEAM -HWR- HEATING WATER RETURN -HWS- HEATING WATER SUPPLY -LCS- LOW PRESSURE CLEAN STEAM -LIQ- REFRIGERANT LIQUID -LPC- LOW PRESSURE CONDENSATE BPS- LOW PRESSURE STEAM -LWR- LOOP WATER RETURN -LWS- LOOP WATER SUPPLY -MV- MEDICALVACUUM -OR- OIL RETURN OIL SUPPLY ---OS- -PC- PUMPED CONDENSATE -P D- PUMPED DISCHARGE -RWR- REHEAT WATER RETURN -RWS- REHEAT WATER SUPPLY -SUC- REFRIGERANT SUCTION ASV- SAFETY RELIEF VENT -VAC- LAB VACUUM PIPE CAP ­E1 Q PIPE DOWN 0 PIPE UP OR UP/DOWN PITCH PIPE IN DIRECTION DIRECTION OF FLOW IN PIPE NEW CONNECTION DIELECTRIC CONNECTION UNION/FLANGE } D4 SHUTOFF VALVE NORMALLY OPEN SHUTOFF VALVE NORMALLY CLOSED - THROTTLING VALVE ­111I BALANCING VALVE (NUMBER INDICATES GPM) dh AUTOMATIC BALANCING VALVE MIXING VALVE CONTROL VALVE (THREE-WAY) CONTROL VALVE (TWO-WAY) SOLENOID VALVE CHECK VALVE ­4...�h SAFETY/RELIEF VALVE PRESSURE REDUCING VALVE (LIQUID/GAS) PRESSURE REDUCING VALVE (STEAM) TRIPLE DUTYVALVE(ANGLE TYPE) TRIPLE DUTYVALVE(IN-LINE TYPE) t3 PUMP Y VACUUM BREAKER 'WYE"- STRAINER `WYE"- STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP BASKETSTRAINER LJ FLEXIBLE CONNECTION PRESSURE/TEMPERATURE TEST PLUG REDUCER- REFERENCE SPECIFICATION FOR CONCENTRIC/ECCENTRIC AND FOTIFOB P SUCTION DIFFUSER WITH SUPPORT FOOT AUTOMATIC AIR VENT Ti MANUAL AIR VENT ♦t DRAIN VALVE WITH HOSE CONNECTION AND CAP _ ❑ PRESSURE SENSOR (FURNISHED WITH BALL VALVE) © PRESSURE GAUGE (FURNISHED WITH BALL VALVE) 11110�111 DIFFERENTIAL PRESSURE SENSOR t t L Sp STATIC SWITCH FM FLOW METER FLOW SWITCH FS FLOW SENSOR STEAM TRAP (REFER TO SCHEDULE) DT-' F&T STEAM TRAP (REFER TO SCHEDULE) INVERTED BUCKET STEAM TRAP (REFER TO SCHEDULE) - T-' ALIGNMENTGUIDE = PIPE ANCHOR EXPANSION JOINT METER MECHANICAL SYMBOL LIST NOT ALL SYMBOLS MAY APPLY. SYMBOL: DESCRIPTION: DIRECTION OF AIR FLOW FLEXIBLE DUCT MANUAL VOLUME DAMPER RISE IN DIRECTION OF AIR FLOW DROP IN DIRECTION OF AIR FLOW DUCT CAP DUCT DOWN DUCTUP SUPPLY/OUTSIDE AIR DUCT SECTION }� }� ® zRETURN AIR DUCT SECTION ® EXHAUST/RELIEF AIR DUCT SECTION ® 4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION CD-1 AIR TERMINAL PROPERTIESSYMBOL 7115 NECK SIZE/CFM 1� 4 i ### TERMINAL AIR BOX (REFER TO SCHEDULE) �I�ppp TERMINAL AIR BOX W REHEAT COIL (REFER TO SCHEDULE) QSERIES FAN POWERED TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE) PARALLEL FAN POWERED TERMINAL AIR BOX wIREHEAT COIL (REFER TO SCHEDULE) HUMIDIFIER ® OPPOSED BLADE DAMPER (REFER TO SCHEDULE) PARALLEL BLADE DAMPER (REFER TO SCHEDULE) ® DIFFERENTIAL PRESSURE SENSOR HO HUMIDISTAT SENSOR ❑H HUMIDISTAT/SENSOR © CARBON MONOXIDE SENSOR © CARBON DIOXIDE SENSOR 2 OO OCCUPANCYSENSOR ® PRESSURE SENSOR/MONITOR © PRESSURE SENSOR (DUCT MOUNTED) Q THERMOSTAT/SENSOR Q TEMPERATURE SENSOR ® THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURE 4 TEMPERATURE SENSOR WITH WELL Y THERMOMETER WITH WELL (DIAL TYPE) THERMOMETER WITH WELL (FILLED TYPE) AIRFLOW MEASUREMENT SYMBOL 4 1:�O-XX-Y XX-AHUSYMBOL Y - SEQUENTIAL NUMBER MECHANICAL ABBREVIATION KEY ABBR: DESCRIPTION: AD ACCESS DOOR AFF ABOVE FINISHED FLOOR C COMMON CO CLEANOUT CD-E CEILING DIFFUSER - EXISTING CFSD CONTROUFIRE/SMOKE DAMPER DPG(0-2") DIFFERENTIAL PRESSURE GAUGE(RANGE) DPS DIFFERENTIAL PRESSURE SWITCH EA EXHAUST/RELIEF AIR ECFSD EXISTING CONTROL FIRE SMOKE DAMPER EFD EXISTING FIRE DAMPER EFSD EXISTING FIRE SMOKE DAMPER EP ELECTRICAL TO PNEUMATIC VALVE ESD EXISTING SMOKE DAMPER FD FIRE DAMPER FOB FLAT ON BOTTOM FOT FLAT ON TOP FED FIRE/SMOKE DAMPER MA MIXED AIR MV MIXING VALVE NC NEWCONNECTION N.C. NORMALLYCLOSED NIC NOT IN CONTRACT N.O. NORMALLY OPEN CA OUTSIDE AIR PS PRESSURE SWITCH RA RETURNAIR SA SUPPLYAIR SD SMOKE DAMPER TAB TERMINAL AIR BOX TD TRANSFER DUCT TYR TYPICAL UC-1 DOOR UNDERCUT BY OTHERS IV TYPICAL) UNO UNLESS NOTED OTHERWISE MECHANICAL GENERAL NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE DIAGRAMMATIC AND MAY NOTALWAYS REFLECT EXACT INSTALLATION CONDITIONS. DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC., AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT. 2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLYAT SITE. REVIEW ALL DRAWINGS INCLUDING THOSE OF OTHER TRADES. 3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES OR CONFLICTS TO THE ATTENTION OF THE ARCHITECVENGINEER BEFORE PROCEEDING WITH FABRICATION OR EQUIPMENT ORDERS. 4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER ACCESS. 5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR EXPENSE TO OTHERS. 6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF DESIGN. 7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY AUDIONISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES, OTHER THAN SPRINKLERS. 8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND FINISH. 9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING. 10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS PENETRATE. 11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON -FIRE RATED WALL, PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS WITHIN ROOMS. 12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT. 13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS, PIPING, DUCTWORK, ETC. 14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES. 15. MAINTAIN MINIMUM T-6" CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR STARTERS, SWITCHES, AND DISCONNECTS. 16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL EXTEND MINIMUM 6" BEYOND ALL SIDES OF EQUIPMENT. 17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER NONSTRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS. MECHANICAL RENOVATION NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING. 2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK. 3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD CONDITIONS. 4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HISIHER WORK AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HISIHER AREA OF WORK. 5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS. CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING 6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO BIDDING. 7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT DOES NOT CONFLICT W ITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK. 8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT REMAIN ACTIVE. 9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW SYSTEMS ARE INSTALLED. 10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR TIE IN AND SW ITCHOVER. DRAIN SYSTEM ONLY TO MAKE SW ITCHOVERS AND CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE. 11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT THAT HAS BEEN REMOVED. MECHANICAL PHASING NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL, ELECTRICALAND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA. 2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC. WITH AFFECTED ADJACENTAREAS. 3. PROVIDE TEMPORARY DUCTWORK,PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF PROJECT. 4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT 5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME. n OAMERICAN M■ STRUCTUREPOINT INC 7260 sMpnlan4 Suman I Indianapolis, Indiana M256 TEL 317.M7.R60I RM317.343.0270 www.wromimpoim.nom *IMEG 8900 KEYSTONE XING PH: 317.848.5045 SUITE 210 FAX 317.844.2201 INDIANAPOLIS, IN www.imegeorp.com 46240 GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 ` No. V PE10505421 "inrbg"VA ,Lnmmoc" 06/14/19 CERTIFIED BY ISSUANCEINDEX DATE: 06/14/19 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE NO. DESCRIPTION DATE Project Number 18002480.01 MECHANICAL COVERSHEET Subject to compliance with all regulations of State and Local Codes City of Carmel DATE: 09/24/19 THE MCLUSIVE PROPERTY Of MEG CORPAND SHALL NOT BE USED OR REPRODUCED FOR ANYOTHER PROJECT WITHOUT THE E�RESS WRITTEN APPROVALANDPARnCIPATION OF MEG COMP CM18 MEG COMP M000