HomeMy WebLinkAboutM304 ROOF MECHANICAL PLANRELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
at State and Local Codes
City of Cara el (�
�VT�a1lEwLCi1,DML
DATE: 09/24/19
1. REFER TO CAPTIVEAIRE SHEET 6 FOR MAKE
UP AIR UNIT INFORMATION.
2. REFER TO CAPTIVEAIRE SHEET 5 FOR FAN
INFORMATION.
3. SHEET METAL CONTRACTOR TO PROVIDE
INSULATED CUSTOM CURB ADAPTOR ANO
FRAMING FOR NEW KITCHEN EXHAUST FAN
AND DUCT ROOF PENETRATION.
eF eG eH el eJ eK
I I I I I I
GENERAL NOTES:
A. ALL EQUIPMENT AND DUCTWORK SHOWN
WITH THINILIGHT SOLID LINES IS EXISTING TO
REMAIN.
B. ALL EQUIPMENT AND DUCTWORK SHOWN
WITH THICK/DARK SOLID LINES IS NEW OR
RELOCATED.
C. RELEVANT EQUIPMENT AND DUCTWORK
SHOWN IS BASED ON EXISTING DRAWINGS
AND FIELD SURVEY. NOT ALL EXISTING
EQUIPMENT AND DUCTWORK IS SHOWN.
CONTRACTOR SHALL FIELD VERIFY ALL
CONDITIONS AFFECTED BY THIS RENOVATION
AND NOTIFY THE ENGINEER IF CONDITIONS
ARE NOT AS INDICATED.
D. BRANCH DUCTWORK RUNOUTS TO DIFFUSERS
AND TERMINAL BOXES SHALL MATCH THE
INLET SIZES OF THE DIFFUSERS AND
TERMINAL BOXES, UNLESS OTHERWISE
NOTED.
E. REMOVE EXISTING DRYWALUMASONRY WALLS
AS REQUIRED TO COMPLETE WORK. PATCH
AND PAINT WALLS TO MATCH EXISTING
CONDITIONS.
- e9
e8
7.
- e7
- e6
- -
I I I I I I I I I I IQ I I,
3 — 2
r24XI8 SA
- - - - - - - - - - - - - - - I-
EF-1
�
M801
- - - - - - - - - -
G
KEF-2�
2 I I I I I I I I I
I I I I I I I I I I n Q
I I I I I I I I I
I I I I I I I I I I I I I I I I I I I I
B C
ROOF MECHANICAL PLAN A D
OH1
MEG CORP RESERVES FROFRIETARY RIGHTS. INCLUMNG COPYRIGHTS. TO THIS
DRAWING AND THE DATA SHOWN THEREON. SEND SHOWING PNOIdi CATA ME
THE IXCLUSNE PRWERTY OF MEG CGRPONDSI NOT BE USED OR
REPRODUCED MR MY OTHER PROMECT WITHOUT THE EMPRESS WRITTEN
PPFROVFLFND PARTCPATION OF' IMEG CORP. 04181MEG CORP.
REFERENCE SMILE IN INCHES
1 2
GEICO
so
OAMEDICAN
®■
STRUCTUREPOINT
7260 SM1adeland Smtion I Indianapolis, Indiana M256
TEL 31].54].5580 1 FA%31].543.02]0
www."Mc umpoim.00m
*IMEG
8900 KEYSTONE XING PH: 317.8t8.5045
SUITE 210 FAX 317.844.2201
INDIANAPOLIS, IN www.imegeorp.com
46240
GEICO CORPORATE
FIRST FLOOR
RENOVATION PHASE 3
101 W. 103RD ST.
INDIANAPOLIS, IN 46290
No.
PE10505421
/uIH ITAD nouooc' ul 06/14/19
O yq"I
CERTIFIED BY
ISSUANCE INDEX
DATE:
06/14/19
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
PHASE 3
REVISION SCHEDULE
INO. DESCRIPTION DATE DESCRIPTION DATE
Project Number 18002480.01
ROOF MECHANICAL
PLAN
M304