Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
P000 PLUMBING COVERSHEET
2 VIEW KEY NAME LEVEL NAME iQ� INDICATES NOTE USED TO DESCRIBE 10'HEIGHTABOVE ADDITIONAL INFORMATION ABOUT PROJECT 0'-0" WORK REQUIRED, SPECIFIC TO THE SHEET AND/OR DETAIL INDICATES DIRECTION OF TRUE NORTH PLAN OR DETAIL NUMBER PLAN OR DETAIL NAME /\ VIEW NAME PLAN OR DETAIL SCALE ORS INDICATES SIMILAR DETAIL SINK REFERENCED IN MULTIPLE LOCATIONS DETAIL REFERRED TO BY SECTION CUT 1 M701 SHEET DETAIL IS LOCATED ON INDICATES SIMILAR DETAIL SI REFERENCED IN MULTIPLE LOCATIONS -DETAIL REFERRED TO BY ELEVATION 4 3 T101�SHEET DETAIL IS LOCATED ON LINE TYPE KEY: NEW WORK BY THIS CONTRACTOR (DARK SOLID LINE) -NEW WORK UNDERFLOOR OR UNDERGROUND BY THIS CONTRACTOR (DARK LONG DASHED LINE) NEW WORK BY OTHERS AND/OR EXISTING TO REMAIN (LIGHT SOLID LINE) -------EXISTING TO BE REMOVED BY THIS CONTRACTOR (DARK SHORT DASHED LINE) RELEASED FOR CONSTRUCTION PLUMBING SYMBOL LIST NOT ALL SYMBOLS MAY APPLY. SYMBOL: DESCRIPTION: -AV ACID VENT -AW ACID WASTE -CA COMPRESSEDAIR -CW COLD WATER - POTABLE -D DRAIN -DI DEIONIZED WATER nT DRAIN TILE -G NATURAL GAS -GRV GAS REGULATOR VENT �SAN SANITARY DRAINAGE(GREASE SANITARY DRAINAGE) -GV GREASEVENT �iW HOT WATER -POTABLE -HW HOT WATER CIRCULATING - POTABLE -FiW140 HOTWATER- POTABLE NUMBER INDICATES TEMP -HWC140 HOTWATER CIRC.- POTABLE NUMBER INDICATES TEMP -IA INSTRUMENTAIR -MA MEDICALAIR -MV MEDICALVACUUM -N NITROGEN -NCW NON -POTABLE COLD WATER -NHW NON -POTABLE HOT WATER -N NITROUS OXIDE ---- OR OIL RETURN -OS OIL SUPPLY OXYGEN -P PROPANE GAS -PO PUMPED DISCHARGE -PW PURE WATER -R REVERSE OSMOSIS WATER -SAN SANITARY DRAINAGE SCW SOFT COLD WATER SHW SOFT HOT WATER -ST(1,000) STORM DRAINAGE (ROOF SQUARE FOOTAGE) -STS STORM DRAINAGE (SECONDARY) STW SOFT TEMPERED WATER -TW TEMPERED WATER -V VENT -VA LABVACUUM SERVICE WATER - POTABLE �V -WAGO WASTE ANETHESIA GAS DISPOSAL PIPE CONTINUATION ------- 0 PIPE CAP PIPEDOWN ------ 0 PIPE UP OR UP/DOWN �F PIPE SERVING FIXTURE ON FLOORABOVE (EXAMPLE: FD=FLOOR DRAIN) PITCH PIPE IN DIRECTION DIRECTION OF FLOW IN PIPE ROUTE TO DRAIN 6"(1000) ROOF DRAIN PROPERTIES SYMBOL SIZE (ROOF SQ. FT.) NEW CONNECTION DIELECTRIC CONNECTION UNION/FLANGE SHUTOFF VALVE NORMALLY OPEN SHUTOFF VALVE NORMALLY CLOSED GPM BALANCING VALVE (NUMBER INDICATES GPM) CHECK VALVE SOLENOID VALVE SAFETY/RELIEF VALVE T VACUUM BREAKER 44-0 PRESSURE GAUGE (FURNISHED WITH BALL VALVE) © PRESSURE SENSOR (FURNISHED WITH BALL VALVE) 4 TEMPERATURE SENSOR WITH WELL C� THERMOMETER WITH WELL (DIAL TYPE) THERMOMETER WITH WELL (FILLED TYPE) REDUCER - REFERENCE SPECIFICATION FOR CONCENTRIC/ECCENTRIC AND FOT/FOB 4 PRESSURE REDUCING VALVE (LIQUID/GAS) PUMP METER ALIGNMENTGUIDE = PIPE ANCHOR EXPANSION JOINT AD ACCESS DOOR AFF ABOVE FINISHED FLOOR BFP BACKFLOW PREVENTER BT BATHTUB CB CATCH BASIN CI CAST IRON CO CLEANOUT CS CLINICAL SINK DB DIALYSIS BOX DF DRINKING FOUNTAIN DI DUCTILE IRON E EXISTING EE EMERGENCY EYEWASH ES EMERGENCYSHOWER ESE EMERGENCY SHOWER/EYEWASH EWC ELECTRIC WATER COOLER FCO FLOOR CLEANOUT FD FLOOR DRAIN FM FLOW METER FS FLOOR SINK GD GARBAGE DISPOSER GI GREASE INTERCEPTOR HB HOSE BIBB I.E. INVERT ELEVATION (FOR REFERENCE ONLY) LAV LAVATORY MB MOP BASIN MH MANHOLE MV MIXING VALVE INC NEW CONNECTION NIC NOT IN CONTRACT NT NEUTRALIZATION TANK OS OILSEPARATOR RD ROOF DRAIN SH SHOWER SK SINK SS SERVICE SINK TD TRENCH DRAIN TP TRAP PRIMER TYP TYPICAL UR URINAL VTR VENT THROUGH ROOF WC WATER CLOSET WCO WALL CLEANOUT WF WASH FOUNTAIN WH WATER HEATER WMF WASHING MACHINE FIXTURE WM WATER METER WS WATER SOFTENER UB UTILITY BOX UNO UNLESS NOTED OTHERWISE YCO YARD CLEANOUT MECHANICAL RENOVATION NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND REPORTANY CONFLICTS BEFORE PROCEEDING. 2. NOTALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK. 3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD CONDITIONS. 4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK AND SHALL NOTIFYTHE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF WORK. 5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF ROOFS WALLS AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS. CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING 6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BYALL CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO BIDDING. 7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL EITHERARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH FASHION THAT IT DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK. 8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT REMAIN ACTIVE. 9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY REASON. MAINTAIN SERVICE TO ALL COMPONENTS THATARE TO REMAIN UNTIL NEW SYSTEMS ARE INSTALLED. 10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR TIE IN AND SW ITCHOVER. DRAIN SYSTEM ONLY TO MAKE SW ITCHOVERS AND CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE. 11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT THAT HAS BEEN REMOVED. MECHANICAL PHASING NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO ARCHITECTS INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF THE PHASING CRITERIA. 2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC. WITH AFFECTED ADJACENT AREAS. 3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF PROJECT. 4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT 5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME. iL4171►rexcl4►1:1IC7_m►[oil 11*1 1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT. 2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE BASIS OF DESIGN. 3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL APPLICABLE STATE LOCAL AND GOVERNING AUTHORITIES. 4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874 5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY ALL ELEVATIONS BEFORE BEGINNING WORK. 6. VERIFY UNDERGROUND PIPE SEES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO BEGINNING ANY WORK. 7. REFER TO THE PLUMBING ROUGH -IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO PLUMBING FIXTURES. B. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL DEMOLITION INFORMATION. 9. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL INFORMATION. MECHANICAL GENERAL NOTES: THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED TO, FIRE PROTECTION, PLUMBING, VENTILATION, PIPING AND TEMPERATURE CONTROL. 1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS. DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC., AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELYAS ACTUAL BUILDING CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT. 2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES. 3. COORDINATE ALLWORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING WITH FABRICATION OR EQUIPMENT ORDERS. 4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER ACCESS. 5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR EXPENSE TO OTHERS. 6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF DESIGN. 7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING MOUNTED DEVICES, OTHER THAN SPRINKLERS. 8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS, FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND FINISH. 9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS PANELS PRIOR TO BIDDING. 10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING, AND DUCTS PENETRATE. 11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON -FIRE RATED WALL, PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED INC LEVELS WITHIN ROOMS. 12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT. 13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARYAMONG DIFFERENT MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SEES AND REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS, PIPING, DUCTWORK, ETC. 14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES. 15. MAINTAIN MINIMUM T-6" CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR STARTERS, SWITCHES, AND DISCONNECTS. 16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL EXTEND MINIMUM 6" BEYOND ALL SIDES OF EQUIPMENT. 17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS. PLUMBING FIXTURE ROUGH -IN SCHEDULE NOTES: 1) SANITARY RISER UP IN WALL TO FIXTURE SHALL BE A MINUMUM OF 2'. 2) 12' CW AND HW APPLIES ONLY TO THE FINAL VERTICAL RISE -DROP TO EACH FIXTURE, BRANCH PIPING TO VERTICAL RISE -DROP SHALL BE A MINIMUM OF 314" UNLESS NOTED OTHERWISE. 3) SIZES SHOWN ARE MINIMUMS. SIZES SHOWN ON THE DRAWING THAT ARE LARGER THAN THE SIZES LISTED IN THE SCHEDULE SHALL DICTATE THE ROUGH -IN SIZE, DOMESTIC DOMESTIC FIXTURE CW HW SANITARY VENT DESCRIPTION (NOTE 3) (NOTE 3) (NOTE 3) (NOTE 3) REMARKS FLOOR - - 2" 11/2" - DRAIN/FLOOR SINK FLOOR - - 3" 11/2" - DRAIN/FLOOR SINK FLOOR - - 4" 2" - DRAIN/FLOOR SINK LAVATORY 1/2' 1/2' 11/4" 11/4" NOTE 182 MOP BASIN 3/4" 1 3/4" 3" 1 11/2" UTILITY BOX- 3/4" 3/4" 2" 11/4" - WASHING MACHINE *IMEG'�� ;,a, �;,,o n OAMERICAN M■ STRUCTUREPOINT INC •60 SMpnlana Shtian I Indianapolis, Indiana M256 TEL 317.M7.MM I FILL311F.M3.0270 www.mumurepoim.nan *IMEG 8900 KEYSTONE XING PH: 317.848.5045 SUITE 210 FAX 317.844.2201 INDIANAPOLIS, IN www.imegeorp.com 46240 GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 No. / PE10505421 �\ $rATE OF ANn pN. \ nF'oroocc°�06�14/19 CERTIFIED BY ISSUANCEINDEX DATE: 06/14119 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE NO. DESCRIPTION DATE Project Number 18002480.01 PLUMBING COVERSHEET Subject to compliance with all regulatims of State and Local Codes City of Carmel (� �VT�a1lEwU'i1,DML DATE: 09/24/19 OVER CORP RESERVES RIORnETAm VPLPHn PARMCPATION OF MEC CORP. 62018110W CORM, REFERENCE SCALE IN INCMg a 1 e a P000