HomeMy WebLinkAboutP200.A UNDERFLOOR PLUMBING DEMOLITION PLAN -AREA AKEYNOTES:
1, DISCONNECTAND REMOVE GREASE
INTERCEPTOR. CAP AND ABANDON INCOMING
GREASE SANITARY AND DISCHARGE SANITARY
LINES.
2. UNDERSLAB WASTE LINES ARE SHOWN BASED
ON EXTENT OF INFORMATION AVAILABLE.
WHERE EXISTING FIXTURES ARE REMOVED,
CAP ASSOCIATED SANITARY LINE BELOW
SLAB.
eH el eJ eK eL eM eN e0 eP�
CW
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
at State and Local Codes
City of Carmel
DATE: 09/24/19
NDERFLOOR PLUMBING DEMOLITION PLAN -AREA A
-
0
DEMOLITION NOTES:
1. ALL EQUIPMENTAND PIPING SHOWN WITH
THI WLIGHT SOLID LINES IS EXISTING TO
REMAIN.
2. ALL EQUIPMENTAND PIPING SHOWN WITH
THICKIDARK DASHED LINES IS EXISTING TO BE
REMOVED OR RELOCATED.
3. RELEVANT EQUIPMENT AND PIPING SHOWN IS
BASED ON EXISTING DRAWINGS AND FIELD
SURVEY. NOT ALL EXISTING EQUIPMENT AND
PIPING IS SHOWN. CONTRACTOR SHALL FIELD
VERIFY ALL CONDITIONS AFFECTED BY THIS
RENOVATION AND NOTIFY THE ENGINEER IF
CONDITIONS ARE NOTAS INDICATED.
4. OWNER SHALL HAVE FIRST RIGHT OF REFUSAL
UPON REMOVAL OF ALL SALVAGED ITEMS.
OTHERWISE, REMOVE ALL DEMOLISHED ITEMS
FROM THE SITE.
5. REFER TO "NEW WORK" PLANS FOR PIPING
CONTINUATIONS AND/OR REPLACEMENTS.
6. AFTER PIPING REMOVAL, PATCH HOLES
THROUGH WALLS AND FLOORS TO MATCH
SURROUNDING CONDITIONS.
7. REMOVE AND RE -INSTALL EXISTING LAY -IN
CEILING AS REQUIRED TO COMPLETE WORK.
REPLACE DAMAGED CEILING MATERIALS TO
MATCH EXISTING CEILING.
8. REMOVE EXISTING DRYWALL CEILINGS AS
REQUIRED TO COMPLETE WORK. PATCH AND
PAINT CEILINGS TO MATCH EXISTING
CONDITIONS.
9. REMOVE EXISTING DRYWALUMASONRY WALLS
AS REQUIRED TO COMPLETE WORK. PATCH
AND PAINT WALLS TO MATCH EXISTING
CONDITIONS.
�IMEG oPR� W0,10
MEG GVRP RESERVES PROPRIETARY RIGHTS. INCLUDING COPYRIGHTS. TO THIS
DRAWING AND THE DATA SHOWN THEREON. SLID DRAWING AND/W RLTAARE
IHEMMUSh PRWERIYC£MWC PPNDSHNLNOTMUSEDOR
REsxODUCED MR ANYOTHER PROJECT WITHOUT THE EWRE55 W RITEN
APPigVALANDPARTCPATICNKIAEGCONP. 020181MEGCOV.
REFERENCESCLHEININCHIM
0 1
GEICO
■o
O AMER ICAN
WE STRUCTUREPOINT
7260 SM1adeland Smon I Indianapolis, Indiana M256
TEL 31].54].5560 1 FA%31].543.02]0
waw.muaurepwaNcom
8900 KEYSTONE XING PH: 317.848.5045
SUITE 210 FAX 317.844.2201
INDIANAPOLIS, IN www.imegeorp.com
46240
GEICO CORPORATE
FIRST FLOOR
RENOVATION PHASE 3
101 W. 103RD ST.
INDIANAPOLIS, IN 46290
ACE : No. "',`*
PE10505421
STATE OF
Zq
CERTIFIED BY
ISSUANCEINDEX
DATE:
06/14/19
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
PHASE 3
REVISION SCHEDULE
NO. I DESCRIPTION I DATE
Project Number 18002480.01
UNDERFLOOR
PLUMBING
DEMOLITION PLAN -
AREA A
P200 0A