HomeMy WebLinkAboutP301.A FIRST FLOOR PLUMBING PLAN -AREA ARELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Calmed
DATE: 09/24/19
KEYNOTES:
1. 3/4" HW 140+CW DROP, 2" VENT RISE.
2. 3/4"HW 140+3/4"SEW DROP,
3. 3/4" HW + CW DROP, 1 1/2" VENT RISE, 2"
WASTE DOWN.
4. 3/4^SCW DROP.
5. 1^SCW DROP.
6. 3/4" CW DROP. CONNECT TO EXISTING WALL
HYDRANT.
7. 3/4^ HW+CW DROP, 2^ VENT RISE.
8. 3/4" RO DROP.
9. 3/4^ RO DROP.
10. ROUTE 3/4" RO BELOW COUNTER TO COFFEE
MAKER.
11. 4" V DOWN.
GENERAL NOTES:
A. ALL EQUIPMENT AND PIPING SHOWN WITH THIN/LIGHT SOLID LINES IS EXISTING TO
REMAIN.
B. ALL EQUIPMENT AND PIPING SHOWN WITH THICKIDARK SOLID LINES IS NEW OR
RELOCATED,
C. RELEVANT EQUIPMENT AND PIPING SHOWN IS BASED ON EXISTING DRAWINGS AND
FIELD SURVEY, NOT ALL EXISTING EQUIPMENT AND PIPING IS SHOWN, CONTRACTOR
SHALL FIELD VERIFY ALL CONDITIONS AFFECTED BY THIS RENOVATION AND NOTIFY THE
ENGINEER IF CONDITIONS ARE NOT AS INDICATED.
D. DOMESTIC WATER BRANCH PIPING RUN OUTS TO PLUMBING FIXTURES SHALL BE 3/4"
DIAMETER, UNLESS OTHERWISE NOTED.
E. REMOVE AND RE -INSTALL EXISTING LAY -IN CEILING AS REQUIRED TO COMPLETE
WORK. REPLACE DAMAGED CEILING MATERIALS TO MATCH EXISTING CEILING.
F. REMOVE EXISTING DRYWALL CEILINGS AS REQUIRED TO COMPLETE WORK. PATCH
AND PAINT CEILINGS TO MATCH EXISTING CONDITIONS.
G. REMOVE EXISTING DRYWALUMASONRY WALLS AS REQUIRED TO COMPLETE WORK.
PATCH AND PAINT WALLS TO MATCH EXISTING CONDITIONS.
H. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR THE DESIGN,
COORDINATION, AND INSTALLATION OF THE FIRE PROTECTION SYSTEM, INCLUDING
REMOVING AND INSTALLING NEW PIPING AS REQUIRED FOR A COORDINATED
INSTALLATION. THE FIRE PROTECTION SYSTEM IS TO BE DESIGNED AND INSTALLED IN
COMPLIANCE WITH NFPA AND ALL OTHER STATE AND LOCAL CODES.
I
I
I
eK eL I
eN I T
NEW MENS
I I I
i N 1/2"G4 21/2"CW T P T I " 01p� J yJI
1Z 14 11/4"HW 101P U � J Uc
— — — —
c — — — — — —
m loon
12
4"CW� — � — c be—�3/'
/2"EA — e5
II 119
1
r U U — — — 1/2"CAS — — — — — — 1/2"G-2
— — — — — — — — 4.
fUU]
XNF ENU f 1
MUM NF. d ENSI kNR 1 A
in lIA
N psoo
O f 0 1
2 1
HP RE C E ul
HIf
4G
3/4"RO 3/4'RO 21/2"CW
-- - - - - - - - - - - - - -__-- - - - - L
TV
-- coR110o6
P800 Alp
—HW SCW 3
4 —HW140 HWC140
1—
i08. 11 NC • 9 1 ,/2" 2 1/2" O
iH*1aA TD-1 O 3/4" 5 a 11/d CI
II
3/4" \L SKA
SK-1 NC ___�CW 2"V `NNC
COFFEE _ _ 3/4"HW
— 1� L� IL F�IJMI
IX.ZL. 3 ® NC__-__
11 NC S-1
HP CONFERENCE IX. LEI)
IX E.I PIP I' — — — _""' 11/2"HW — — —— — p
IX. EL. 5 3/4"RO—___-_. 11/4"SC T — — Fr-7 `.
3/4"RO— 11/4"HW, 400
E1 3/a"HWC140
— — — EW — 7— �S — — 57 — — — FIEL— — — — — — = 3.
MB-1
E11:
- QIII I I I I e3
NC— 4"
FCO-1 21V
F54i —
I e FS-# FS 1 I I 70 — — T
P800
6
IX.6i ECURIry P800 �/ c 2 ® ® ® ❑
S M O ter— 4 4
'qqI' pp I I I I I
NC—: 3 4
SK 1 — — SK 1 — P800 — — — — —
VETIBULE 10
V1
— — — — — — — — — — — —
6
4" VTR
I I I I I I I I
O
O O�
I I I T T I I I I
I
B C
A D
l0
PLUMBING PLAN -AREA A
CI
■o
C
QEeICAN
N■
STRUCTUREPOINT
7260SM1adeland Station I Indianapolis, Indiana M256
TE1.317.517.5560 I FA%31].543.02]0
www.anucturepoim.00m
*IMEG
8900 KEYSTONE XING PH: 317.848.5045
SUITE 210 FAX 317.844.2201
INDIANAPOLIS, IN www.imegeorp.com
46240
GEICO CORPORATE
FIRST FLOOR
RENOVATION PHASE 3
101 W. 103RD ST.
INDIANAPOLIS, IN 46290
No.
PE10505421
"C�rN "YHl n000m. 06/14/19
CERTIFIED BY
ISSUANCEINDEX
DATE:
06/14/19
PROJECT PHASE:
CONSTRUCTION DOCUMENTS
PHASE 3
REVISION SCHEDULE
NO. DESCRIPTION DATE
Project Number 18002480.01
FIRST FLOOR
PLUMBING PLAN -
AREA A
P301.A