Loading...
HomeMy WebLinkAboutP301.A FIRST FLOOR PLUMBING PLAN -AREA ARELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Calmed DATE: 09/24/19 KEYNOTES: 1. 3/4" HW 140+CW DROP, 2" VENT RISE. 2. 3/4"HW 140+3/4"SEW DROP, 3. 3/4" HW + CW DROP, 1 1/2" VENT RISE, 2" WASTE DOWN. 4. 3/4^SCW DROP. 5. 1^SCW DROP. 6. 3/4" CW DROP. CONNECT TO EXISTING WALL HYDRANT. 7. 3/4^ HW+CW DROP, 2^ VENT RISE. 8. 3/4" RO DROP. 9. 3/4^ RO DROP. 10. ROUTE 3/4" RO BELOW COUNTER TO COFFEE MAKER. 11. 4" V DOWN. GENERAL NOTES: A. ALL EQUIPMENT AND PIPING SHOWN WITH THIN/LIGHT SOLID LINES IS EXISTING TO REMAIN. B. ALL EQUIPMENT AND PIPING SHOWN WITH THICKIDARK SOLID LINES IS NEW OR RELOCATED, C. RELEVANT EQUIPMENT AND PIPING SHOWN IS BASED ON EXISTING DRAWINGS AND FIELD SURVEY, NOT ALL EXISTING EQUIPMENT AND PIPING IS SHOWN, CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AFFECTED BY THIS RENOVATION AND NOTIFY THE ENGINEER IF CONDITIONS ARE NOT AS INDICATED. D. DOMESTIC WATER BRANCH PIPING RUN OUTS TO PLUMBING FIXTURES SHALL BE 3/4" DIAMETER, UNLESS OTHERWISE NOTED. E. REMOVE AND RE -INSTALL EXISTING LAY -IN CEILING AS REQUIRED TO COMPLETE WORK. REPLACE DAMAGED CEILING MATERIALS TO MATCH EXISTING CEILING. F. REMOVE EXISTING DRYWALL CEILINGS AS REQUIRED TO COMPLETE WORK. PATCH AND PAINT CEILINGS TO MATCH EXISTING CONDITIONS. G. REMOVE EXISTING DRYWALUMASONRY WALLS AS REQUIRED TO COMPLETE WORK. PATCH AND PAINT WALLS TO MATCH EXISTING CONDITIONS. H. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR THE DESIGN, COORDINATION, AND INSTALLATION OF THE FIRE PROTECTION SYSTEM, INCLUDING REMOVING AND INSTALLING NEW PIPING AS REQUIRED FOR A COORDINATED INSTALLATION. THE FIRE PROTECTION SYSTEM IS TO BE DESIGNED AND INSTALLED IN COMPLIANCE WITH NFPA AND ALL OTHER STATE AND LOCAL CODES. I I I eK eL I eN I T NEW MENS I I I i N 1/2"G4 21/2"CW T P T I " 01p� J yJI 1Z 14 11/4"HW 101P U � J Uc — — — — c — — — — — — m loon 12 4"CW� — � — c be—�3/' /2"EA — e5 II 119 1 r U U — — — 1/2"CAS — — — — — — 1/2"G-2 — — — — — — — — 4. fUU] XNF ENU f 1 MUM NF. d ENSI kNR 1 A in lIA N psoo O f 0 1 2 1 HP RE C E ul HIf 4G 3/4"RO 3/4'RO 21/2"CW -- - - - - - - - - - - - - -__-- - - - - L TV -- coR110o6 P800 Alp —HW SCW 3 4 —HW140 HWC140 1— i08. 11 NC • 9 1 ,/2" 2 1/2" O iH*1aA TD-1 O 3/4" 5 a 11/d CI II 3/4" \L SKA SK-1 NC ___�CW 2"V `NNC COFFEE _ _ 3/4"HW — 1� L� IL F�IJMI IX.ZL. 3 ® NC__-__ 11 NC S-1 HP CONFERENCE IX. LEI) IX E.I PIP I' — — — _""' 11/2"HW — — —— — p IX. EL. 5 3/4"RO—___-_. 11/4"SC T — — Fr-7 `. 3/4"RO— 11/4"HW, 400 E1 3/a"HWC140 — — — EW — 7— �S — — 57 — — — FIEL— — — — — — = 3. MB-1 E11: - QIII I I I I e3 NC— 4" FCO-1 21V F54i — I e FS-# FS 1 I I 70 — — T P800 6 IX.6i ECURIry P800 �/ c 2 ® ® ® ❑ S M O ter— 4 4 'qqI' pp I I I I I NC—: 3 4 SK 1 — — SK 1 — P800 — — — — — VETIBULE 10 V1 — — — — — — — — — — — — 6 4" VTR I I I I I I I I O O O� I I I T T I I I I I B C A D l0 PLUMBING PLAN -AREA A CI ■o C QEeICAN N■ STRUCTUREPOINT 7260SM1adeland Station I Indianapolis, Indiana M256 TE1.317.517.5560 I FA%31].543.02]0 www.anucturepoim.00m *IMEG 8900 KEYSTONE XING PH: 317.848.5045 SUITE 210 FAX 317.844.2201 INDIANAPOLIS, IN www.imegeorp.com 46240 GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 No. PE10505421 "C�rN "YHl n000m. 06/14/19 CERTIFIED BY ISSUANCEINDEX DATE: 06/14/19 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE NO. DESCRIPTION DATE Project Number 18002480.01 FIRST FLOOR PLUMBING PLAN - AREA A P301.A