Loading...
HomeMy WebLinkAboutP600 ENLARGED PLUMBING PLANENLARGED WATER R( RELEASED FOR CONSTRUCTION Subject to compliance with all regulations at State and Local Codes City of Cannel A\vv\Gloai — e5 _ — e4 GENERAL NOTES: A. ALL EQUIPMENT AND PIPING SHOWN WITH THIN/LIGHT SOLID LINES IS EXISTING TO REMAIN. B. ALL EQUIPMENT AND PIPING SHOWN WITH THICK/DARK SOLID LINES IS NEW OR RELOCATED. C. RELEVANT EQUIPMENT AND PIPING SHOWN IS BASED ON EXISTING DRAWINGS AND FIELD SURVEY. NOT ALL EXISTING EQUIPMENT AND PIPING IS SHOWN. CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AFFECTED BY THIS RENOVATION AND NOTIFY THE ENGINEER IF CONDITIONS ARE NOT AS INDICATED. D. DOMESTIC WATER BRANCH PIPING RUN OUTS TO PLUMBING FIXTURES SHALL BE 3/4" DIAMETER, UNLESS OTHERWISE NOTED. E. REMOVE AND RE -INSTALL EXISTING LAY -IN CEILING AS REQUIRED TO COMPLETE WORK. REPLACE DAMAGED CEILING MATERIALS TO MATCH EXISTING CEILING. F. REMOVE EXISTING DRYWALL CEILINGS AS REQUIRED TO COMPLETE WORK. PATCH AND PAINT CEILINGS TO MATCH EXISTING CONDITIONS. G. REMOVE EXISTING DRYWALLMASONRY WALLS AS REQUIRED TO COMPLETE WORK. PATCH AND PAINT WALLS TO MATCH EXISTING CONDITIONS. H. THE FIRE PROTECTION CONTRACTOR IS RESPONSIBLE FOR THE DESIGN, COORDINATION, AND INSTALLATION OF THE FIRE PROTECTION SYSTEM, INCLUDING REMOVING AND INSTALLING NEW PIPING AS REQUIRED FOR A COORDINATED INSTALLATION. THE FIRE PROTECTION SYSTEM IS TO BE DESIGNED AND INSTALLED IN COMPLIANCE WITH NFPA AND ALL OTHER STATE AND LOCAL CODES. KEYNOTES: 1. FD-1 SET IN 18" DIAMETER x 18" HIGH CONCRETE PIPE SET IN FLOOR SLAB. 2. 3/4"CW+RO DROP TO RO-1. _ 4. 1TI/2" CW 7 SCW DROP TO OS-1. " 5. REFER TO P301.D FOR CONTINUATION. 6. 2" VENT DOW N. *IMEGoA�@III ,,o co i ■o O AMER ICAN M■ STRUCTUREPOINT •60 SM1adeland Sermon I Indianapolis, Indiana M256 TEL 317.547.5580 1 M1317.543.0270 waw.suncompoim.00m *IMEG 8900 KEYSTONE XING PH: 317.8t8.5045 SUITE 210 FAX 317.844.2201 INDIANAPOLIS, IN www.imegeorp.com 46240 GEICO CORPORATE FIRST FLOOR RENOVATION PHASE 3 101 W. 103RD ST. INDIANAPOLIS, IN 46290 No. -1Tn * / PE10505421\ p STATE OF A11-��"2°06/14/19 CERTIFIED BY ISSUANCEINDEX DATE: 06/14/19 PROJECT PHASE: CONSTRUCTION DOCUMENTS PHASE 3 REVISION SCHEDULE INO.1 DESCRIPTION I DATE Project Number 18002480.01 ENLARGED PLUMBING PLAN DATE: 09/24/19 MEG CORP RESERVES RIOPNETAm VFLFHD PARTICIPATION OF IMEG COW 04181MEG CORS' REFMENCEa IN INCHES 2 a P600