Loading...
HomeMy WebLinkAboutGN010.0i iN uouege Avenue rune A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco Residential SANITARY SEWER PERMIT 999913394 Permit Type Final Subdivision Sunrise on the Monon Project WO Project Name Project Developer Lift Station Treatment Plant Parcel Acreage EDU in Gallons ENG122015 Section Number Sunrise on the Monon Section 1 Lot Number Old Town Development L.L.0 Address Number 01 Carmel Creek Station Address 2 Local Sewer Charge - District Contribution Plan Review and Inspection Application Fee EDU Fee Interceptor Fee Other Fees Fees Due Invoice Number Carmel WWTP Street City 310 Zip Code County 0.00 Builder 0.00 150.00 Phone Number 1908.00 Owner 0.00 Phone Number 0.00 2058.00 Occupant Phone Number 94 1507 Windpump Way Indianapolis 46280 Old Town Design Group 317-605-8796 PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench" phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TdCo will assume no liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be responsible for damages to TrICD'S sewer system. This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the building site which is the subject of this permit. Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in advance. All new construction will be placed on billing two months after connection has been made or when water is connected, whichever comes first. The building has: Main ID: SOM51SOM53 Grease Trap Slab Foundation Grease Interceptor Crawl Space Manhole IDs USMH SOM-51 _ SOM-53 DSMH Grit Interceptor Basement Lid Elevation 805.86 805.22 Grinder Station First Floor Elevation 806.25 806.25 Water Service Basement Elevation 0.00 0.00 Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor ! 0.39-, i I 1.03'. Ft. Per Ordinance 9-13-99 and the elevations provided, the substructure shall be : Plumbed b y jest----., _.. ... EjectorPump TriCo currently requires that an I& inspection is performed and a Certificate of Compliance is issued prior to occupancy / p%� sale of a properrty. Please review attached 1/1 Permit. i r I D Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner. ,7 The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure KL The terms of the conditional permit, if any, are listed below. Plans have been submitted. All fees have been paid. No certificate of insurance required. No additional permits required. No manhole core permit required. The facility is not classified as a FOG facility. By signing below, I attest th I am liar with the D stri ' spa fi ti�/�s1 and agree to accept responsibility for all work done under his per Builder / Owner Signature �x ✓,(�L phone Nu�erZ� Printed Name l OJ (�/ L ( j V� oP�o`otAAL E{y Approved By ~� Rven H n, istrict Engineer N H Permit is valid or ON -YEAR from the date issued. Permit valid only with TriCo seal in k. 0