Loading...
HomeMy WebLinkAboutMoschell Existing FloorplanWH UP 1 9'-4 1 /2"33'-5 1/2"19'-8 3/4"1 4'-3 1 /4" 1 5'-6" 1 1 '-0 3/4"16'-9"13'-8 3/4"27'-8 3/4"3'-6 1/2"1 3'-5 1 /2" 1 0'-5 1 /2" 1 0'-8 1 /2"3'-10 1/2"8'-5 1/4"3'-9" 9'-1" 3'-9" 8'-5 1/4" 17'-7 1/4"20'-2 1 /2"16'-9"1 0'-5 3/4" Support Beam Support Post Support Beam Support Post Support Post Tub Drain Toilet Drain Sink Drain 11 22 ## 1. ) Client to remove all personal items from construction area and store in designated area. 2. ) Remove stairwell wall back to support post as needed per design submitted. 3. ) Remove and salvage any stair hand railing. 4. ) Remove existing light switches in stairwell for relocation per the design submitted. 5. ) Remove and relocate metal support post per the design submitted. 3344 Designated Storage Area Water Main Grinder Pit Sump Pit 5555 55 APPROVAL SIGN OFFCLIENT DATE SITE MANAGER INITIALSSHEET: SCALE:DRAWINGS PROVIDED BY:DATE: 9 /17/2019BasementMoschell Family12642 Teaberry LaneCarmel, IN 46032IA-2 3/8" = 1'-0"Custom Home Medic1093 3rd Ave South WestCarmel, IN46032Existing Floor Plan 09/23/19 William Hohlt