Loading...
HomeMy WebLinkAboutMoschell New FloorplanC01C01C03C03C01C01 C03C03 C02C02 C02C02 D01D01 D04D04 D01D01 D03D03 UPcL E1E1 Elevation 1 E2E2 Elevation 2 14'-8"2'-3"7' 1 0'-5 1 /2" 6'-2"1 2'-2 3/4" 9 3/4" 1 1 '-7 1 /2"8'-11"5'-4 1/2"1 226 SQ FT LIVING AREA UTILITY BEDROOM 1 BATH LIVING Support Beam Support Post Bulk Head Bulk Head Support Beam Bulk Head Not in Construction Area 11 22 11 11 44 55 44 66 77 77 ## 1. ) Carpet to be installed by home owner coordinated by contractor. 2. ) Exercise mat flooring to be supplied and installed by other. 3. ) Frame new 6" interior wall around existing support post. 4. ) Frame out and drywall bulkheads to cover existing support beams and mechanical. 5. ) Re-frame and build out bottom two stairwell steps per the design submitted. See Detail 6. ) Install single shelf and rod. 7. ) Install new casing and trim on existing windows. 8. ) Build out 4" standard stud wall from floor to ceiling. 9. ) Build out 6" standard stud wall from floor to ceiling. 10. ) Hang, finish and paint new drywall on all walls and ceiling. 11. ) Non construction area to not have drywall installed. 12. ) Install LVT flooring per the design submitted. 13. ) Install new fiberglass tub / shower unit in existing plumbing location. 14. ) Install new toilet in existing plumbing location. 15. ) Install new vanity cabinet with laminate top and drop in sink. 16. ) Install HVAC supply air drop sized per the room size from ceiling. 17. ) Install HVAC return air grill in wall per the room size. 18. ) Stairs to be carpeted by homeowner coordinated by contractor. 19. ) Relocate metal support post per the design submitted. 20. ) Install access panel for water main approx. 30"x42" in size. 21. ) Install grinder pump and connect to existing drainage system. 88 88 88 88 88 88 1 919 88 88 88 88 99 1 010 1 010 1 010 1 010 1 010 1 111 1 212 1 313 1 414 1 515 1 616 1 717 Push to Corner Push to Corner Push to Corner 44 8'-10" Finished Ceiling Height 8'-10" Finished Ceiling Height 8'-10" Finished Ceiling Height 1 818 7'-10" Finished Ceiling Height 1 919 Water Main 2020 88 2121 2x SILL 2x FRAMING MEMBER INTERIOR FINISH DOUBLE TOP PLATE APPROVAL SIGN OFFCLIENT DATE SITE MANAGER INITIALSSHEET: SCALE:DRAWINGS PROVIDED BY:DATE: 9 /17/2019BasementMoschell Family12642 Teaberry LaneCarmel, IN 46032IA-3 3/8" = 1'-0"Custom Home Medic1093 3rd Ave South WestCarmel, IN46032New Floor Plan 2x SILL 2x FRAMING MEMBER INTERIOR FINISH DOUBLE TOP PLATEEXISTING FOUNDATION WALL EXISTING INSULATION INTERIOR WALL SECTION (typ) Not to Scale INTERIOR WALL SECTION (typ) Not to Scale 09/23/19 William Hohlt