Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
C0-3 TREE PROTECTION
12 14 15 16 13 4445 46 11 10 REMAINDER OF VALLEY DEVELOPMENT COMPANY D.B. 206 P. 97 18.28 ACRES INDIANA FARMERS MUTUAL INSURANCE COMPANY D.B. 331, P. 109MILL HEIGHTS 16 17 26 7 PARCEL 1 12.12 ACRES 5'-0"32'-3"56' -2" 21 0 ' -9" 170'-9" 0 Scale 1" = 40'-0" 80'40' 20' North Tree Protection and Demolition Plan C0-3 1. Underground utilities, if shown, are based on above ground indications. There is no guarantee that all underground utilities in service or abandoned are shown. Underground utilities are shown as accurately as possible but still may not be exact. No physical underground utility locations were made. 2. Tree Protection Fencing locations are fixed. Install exactly where shown on these plans. Any adjustments to fencing locations must be approved by the Owner. Damages will be assessed if tree protection fence location is adjusted without Owner approval. Fence deviation from this plan or approved change will be corrected by the General Contractor prior to the start of construction. 3. All tree pruning and limb restraint of trees to remain will be performed under the direct supervision of a Certified Arborist. Contractor shall not prune trees or restrain limbs. 4. No staging, equipment, material storage, or vehicles are allowed on non-paved areas unless indicated otherwise on plan. 5. Abandon all utilities to be removed when located within a Protected Root Zone. 6. Backfill all depressed and void areas with top soil following removal of vegetation. Soil shall be free of debris. Compact soils to ensure settling and sedimentation do not occur. 7. Owner is responsible for transplanting identified trees, as noted. Coordinate with Owner if trees to be transplanted remain on site when mobilization begins. 8. Cleanly cut all roots encountered during construction. Contractor to Air-knife all roots around trees around all indicated as being essential to the campus landscape vocabulary and any tree over 18" in diameter. 9. Coordinate locations of Tree Protection Fencing and Construction Fencing prior to the start of construction activities. In areas where Tree Protection and Construction Fences overlap, the Contractor may elect to install the more restrictive fence type of the two provided that the single fence accommodates the requirements of both fences. 10. Trimming of existing trees shall occur no later than March 15th. All tree trimming shall be under the direct supervision of a certified arborist. 11. Removal of significant trees after March 31 through October 1 is prohibited by the State of Indiana for the protection of the Indiana Brown bat. All significant tree removal shall be completed outside of this time frame. TREE PRESERVATION LEGEND Vegetated Areas to be removed Vegetated Areas to be protected Tree Protection Fence Locations - To be installed PRIOR TO DEMOLITION Refer to Detail this sheet TREE PROTECTION GENERAL NOTES Individual Trees to be removed Tree Protection Fence, Refer to Detail this sheet Tree Protection Fence, Refer to Detail this sheet ILLINOIS STREET Architecture | Engineering | Interior Design 1715 Magnavox Way Fort Wayne, IN 46804 260.432.9337 930 North Meridian Indianapolis, IN 46204 317.917.1190 www.msktd.com SHEET TITLE SHEET NUMBER SET DESCRIPTION Early Release Package PROJECT NO. DATE MSKTD & Associates APPROVAL PENDI N G NOT FOR CONS T R U C TI O N Carmel, IndianaFranciscan Orthopedic Center ofExcellence7382 09-10-19A Project for:REV. DATE M:\18-1228 Franciscan Carmel Ortho Hospital\Dwg\Sheets\L000 - Tree Protection 1228.dwg, September 9, 2019 6:33 PM, ALYSSA PRAZEAU, © Paul I. Cripe, Inc.09/24/19