Loading...
HomeMy WebLinkAboutC6 Site Details and Bike ParkingParking Standards (PIS D. >?mmlnv rge pemlinea: Employee shower facilities and locker areas are cocoumged as an end of ride facility To Diagram 1: Bicycle Rack Type Imo,. le' I 1 00 Ime v. ATyrs Diagram 3: Bicycle Parking Location and Design (top view). Article 6: Development standards Page5�37 Y#MPEeNO:OrenW)ID1] 0]: G"Innin ). 20171:W PM BICYCLE PARKING DETAIL NOT To SCALE C6 CONTRACTOR TO VERIFY THE MIN. DEPTH OF THE SURFACE COURSE .5" HOT ASPHALTIC CONC. URFACE COURSE TAC COAT L5" HOT ASPHALTIC GONG. 31NOER COURSE 0 STONE BASE ED. WELL DRAINED IE LIGHT DUTY ASPHALT PAVEMENT SECTION 2 NOT TO SCALE C6 3 4' . 8" EXPANSION JOINT SEALANT — NOT THIS JOINT TO BE USED AT ALL INTERSECTIONS AND ENDS OF DAILY 'POURS' EXPANSION CAP MAXIMUM SPACING SHALL BE 240' % %J %.,�% v r I I' ' SMOOTH DOWEL 1 -6" LONG O 1'-0" o.c. - GREASE HALF OF DOWEL OR USE CUT-BAK ASPHALT EXPANSION JOINT DETAIL a RELEASED FOR CONSTRUCTION ce Subject to compliance wall regulations of State and local Codes City OF Cam�e�l �VT�Vt�D*VAWML DATE: 09/24/19 JOINT SEALANT REINFORCING 1 /4'� MESH D/3 EO x x x x —x D p E0 CONTROL JOINT DETAIL a NOT TO SCALE C6 6a6-10/10 W.W.F. CONTROL JOINT Di 4" CONC. SLAB WITH BROOM FINISH 6" ASPHALT PAVEMENT 4' GRANULAR FILL J I of x CONTRACTOR MAY SUB- I ry STRUTS 'NYLON' FIBER REINFORCING MIX DESIGN TO BE FORWARDED i0 ENGINEER FOR APPROVAL CONCRETE WALK/STOOP/PATIO DETAIL NOT TO SCALE NOTES: NOTE; THIS JOINT TO BE SPACED AT A MAXIMUM OF 15-0" GRID 3/4' R. I. TRANSVERSE JOINTS SHALL BE CUT WON A JOINTER HAVING A RADIUS OF 1/4' AT 61 SPACING AND 48'-0" BETWEEN EXPANSION JOINTS. (FOR SIDEWALK ONLY) 2. SUBGRADE UNDER ALL CURB, SIDEWALK, AND DRIVES SHALL BE COMPACTED IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS. 3. WHERE SIDEWALK IS CONSTRUCTED ADJACENT TO CURB, THE SPACE BEHIND THE CURB SHALL BE FILLED WITH SUITABLE MATERIAL TO THE REOUIRED ELEVATION AND COMPACTED IN LAYERS NOT TO EXCEED 6'. 4. WHEN BUILT IN CONJUNCTION WITH CONCRETE PAVEMENT, EXPANSION AND CONTRACTION JOINTS SHOULD BE PLACED AT THE SAME LOCATIONS AS IN THE PAVEMENT SLAB. THE CURB AND GUTTER SHOULD BE TIED TO THE PAVEMENT BY d4 DEFORMED RE -BAR AT 3'-0" o.c. IF NO CONCRETE PAVEMENT IS BEING BUILT, AT THE TIME, THE CURB IS CONSTRUCTED. EXPANSION JOINTS SHALL BE PLACED AT THE ENDS OF ALL RADII AND AT INTERVALS NOT TO EXCEED 100. CONTRACTION JOINTS SHALL BE PLACED AT 20' ox. OVERFLOW VELCRO CWSURE DANDY BAG LIFTING STRAPS INSTALLATION: STORM DANDY BAGS SEWER GRATE DANDY CURB BAG' ,®ANNW, OVERFLOW GAP \ CURB AND GUTTER INLET "®A®®ir• CURB OR APPROVED FILTER EQUAL PROFILE WITH GUTTER I SAFETY AND CURB APPEAL L PLACE THE EMPTY CANDY CURB BAGI UNIT OVER THE GRATE AS THE GRATE STANDS ON END. 2. FOR OIL AND SEDIMENT MODEL: TO INSTALL OR REPLACE ABSORBENT, PLACE ABSORBENT PILLOW IN MUCH. ON THE BOTTOM (BELOW -GRADE SIDE) CL THE UNIT. 3, TUCK THE ENCLOSURE FEAR INSIDE TO COMPLETELY ENCLOSE THE GRATE. 4. HOLDING THE LIFTING DEVICES. BEING CAREFUL NOT TO DAMAGE THE SEWN FABRIC UNIT, INSERT THE GRATE INTO ITS PRIME, STREET SIDE EDGE FIRST, THEN LOWER BACK EWE WITH CYLINDRICAL TUBE INTO PLACE. THE CYONDnCAL TUBE SHOULD BE PARTIALLY BLOCKING THE CURB FROOD OPENING WHEN INSTALLED PROPERLY. MNNTENWCE: I. THE CONTRACTOR SKILL REMOVE ALL ACCUMULATED SEDIMENT AND DEBRIS FROM SURFACE AND NCINIIY OF UNIT AFTER EACH RAIN EVENT OR AS DIRECTED BY ENONEER/INSPECTOR. DISPOSE OF UNIT NO LONGER IN USE AT AN APPROPRIATE RECYCLING OR SOLID WASTE FACILITY. B. FOR OIL AND SEDIMENT MODEL: REMOVE AND REPLACE ABSORBENT WHEN NEAR SATVRAaON. TEMPORARY DANDY CURB BAG DETAIL TO SCALE e ce SITE DETAILS z O U 0 Z w k j L-Im O z o M o D U ¢ Q ra N O h F N U DO (? C/] J 6 W ° a0 0 0 e FBI � Q N I W O� vh Q v Jz �_ 3C< F=4 U a u OL in W t-- Z W c U Q U UFinn, � K N Z b oO W UJ V N 0 ()Z No OC GO Z K W o, Q Q N M En 0K OQS ZEn NU0 z Q W 0 W �a Z U w Co X 0 J Z W ¢ �z O Z Zoe Q } �U DRAWN BY: TEN CHECKED BY: ALD PROJECT No. 1805-008 SHEET No. C6