HomeMy WebLinkAboutE100.0WH
UP
WP
WP WP
EP
3
T
G ARAG E
UTILITY
GAS FURNACE
ELECTRIC WATER HEATER
SUB-PANEL
KEYLESS BULB
LOW VOLTAGE WIRING
FOR GARAGE DOOR
SENSORS
STAIR CANS ABOVE
GAS REZNOR HEATER
FLUSH MOUNT LED
GARAGE LIGHT Ariens ResidenceGarage Addition10905 Crooked Stick LnCarmel, IN 46032Date:Revision:
7
SHEET OF 15
SIGNATURE / SEALDESIGNER: TYLER VARGO
E: tylerv@customlivingusa.com
C: 574.274.4155Client Initials:
Date:
The plans, including all text, drawings, concepts and ideas,
forming a part of the plans, and the selection and
arrangement thereof Copright 2018 by Custom Living, Inc.,
Indianapolis IN. ALL RIGHTS RESERVED. The plans shall
remain the property of Custom Living Inc. Any use of the
plans, or their content, without the prior written permission of
Custom Living. Inc is strictly prohibited.CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462207/11/2019
DATE:
** PRINTS TO SCALE IF PRINTED ON 24" X 36" **
PROPOSED FIRST FLOOR M.E.P PLANS
SCALE: 3/8" = 1'
ELECTRICAL PLAN NOTES
A. Provide power supply to utility room from existing 200
amp panel located poolhouse utility room
B. Install subpanel in utility room location as shown
C. Provide power for electric waater heater in location
shown
D. Provide power for exterior a/c unit in location shown
E. Rough in and install finish for (2) weather proof
exterior outlets in locations shown
F. Rough in and install finish for (1) ceiling mounted
keyless fixture in utility room as shown
G. Rough in and install finish for (6) flush mounted LED
shop lights in locations shown. Fixtures to be supplied
by Custom Living.
H. Rough in and install finish for (5) exterior sconce
lights as shown. Fixtures to be suppied by Custom
Living.
I. Rough in and install finish for all switches as shown
J. Rough in and install finish for all wall and ceiling
outlets as shown
K. Provide low voltage wiring for garage door sensors
PLUMBING PLAN NOTES
A. Provide main sewer line to connect to existing sewer
lines located in utility room
B. Provide 3/4" water supply lines in utility room to be
run from existing poolhouse utility room
C. Provide gas supply lines to be run from meter base
located at the front of the existing home and stubbed
into garage utility room location
D. Provide Gas rough ins for Furnace and Reznor
Heating Unit in locations shown
E. Install electric Water Heater in Utility Room as shown
F. Connect all new supply and drain lines to stub ins
located in utility room
G. Rough in and install finish for (1) exterior hose bib in
location shown
HVAC PLAN NOTES
A. Install ceiling mounted Gas Reznor Garage Heating
Unit in location shown (1055 SF)
B. Install Gas Furnace located in Utility Room as shown
C. Install exterior Air Condensor unit in location as
shown
D. Install main trunk lines located in flooring system
E. Run individual supply ducts to locations as shown on
2nd floor plan
NEW OUTLET DEVICE STYLE
NEW SWITCH DEVICE STYLE
DIMMER
SWITCHES
WHERE
NOTED
ALL SINGLE
POLE AND 3
WAY
SWITCHES
ALL WALL
OUTLETS
GARAGE CEILING LIGHTS
COMMERCIAL
ELECTRIC 1 'X4' LED
50W FLUSH MOUNT
PANEL LIGHT;
3000K
EXTERIOR SCONCE LIGHTS
TBD
09/25/19
Adam Schriner