Loading...
HomeMy WebLinkAboutS001.01 7'-1 " 7'-3"6'-9"9'-1 1 " 44'-4" 45'27'-4"28'1 2'-6" 1 2'-6" 1 0'-8"8'-8" 9'-2"9'-2" 9'-2" 3'-2"3'-2"43'26'2'-1 0"4'-6 1/2" 11'-3 1/2"9'-6"AA BB DD DDDD DD EE EXISTING GARAGE FOUNDATION WALL EXISTING POOLHOUSEFOUNDATION WALLCC FF GGGG GGGG EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING Ariens ResidenceGarage Addition10905 Crooked Stick LnCarmel, IN 46032Date:Revision: 3 SHEET OF 15 SIGNATURE / SEALDESIGNER: TYLER VARGO E: tylerv@customlivingusa.com C: 574.274.4155Client Initials: Date: The plans, including all text, drawings, concepts and ideas, forming a part of the plans, and the selection and arrangement thereof Copright 2018 by Custom Living, Inc., Indianapolis IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans, or their content, without the prior written permission of Custom Living. Inc is strictly prohibited.CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462207/11/2019 DATE: ** PRINTS TO SCALE IF PRINTED ON 24" X 36" ** FOUNDATION PLAN SCALE 3/8" = 1-0" FOUNDATION PLAN NOTES A. 8X16 CONTINUOUS CONCRETE FOOTER MIN. 32" DEEP TYP. B. 8" CMU FOUNDATION WALL W/ 4" BRICK LEDGE MIN. 24" DEEP C. INSTALL R-10 RIGID INSULATION BOARD AROUND FOUNDATION WALL PERIMETER D. DROP TOP OF FOUNDATION WALLS 8" FOR DOORS E. 4" CONCRETE SLAB OVER MIN. 4" PEA FILL F. THICKEN FOOTER G. THICKEN FOOTER UNDER STEEL BEAMS GENERAL PROPOSED PLAN NOTES Framing contractors are responsible for all labor, for the scope of work specifed on the drawings provided by Custom Living. Owner understands that Custom Living has only provided a labor and material allowance for the scope of Rough Carpentry work specified on the drawings. Any additional work added or uncovered during this scope will be a Change Order during construction Owner understands that the Drywall Allowance is based on an estimated board count and square footage take-off. A final walk through with drywall contractor after framing and mechanical rough-ins will be necessary to finalize drywall install and finish budgets. Final drywall touchups will follow countertop installation. 09/25/19 Adam Schriner