EXISTING 2X4 FRAMING
DEMOLITION & FRAMING KEY
NO DEMO IN THIS ROOM
EXISTING 2X6 FRAMING
WALL SECTION TO BE REMOVED
NEW 2x4 FRAMING
NEW 2X6 FRAMING
BULK HEAD / LOWERED CEILING
WINDOW SCHEDULE
NUMBER FLOOR QTY TOP R/O SIZE
W01 2 4 76" 85"X43" 7036
DOOR SCHEDULE
NUMBER FLOOR QTY TOP R/O SIZE FIRE
D01 1 1 80" 38"X83" 3068 L EX
D02 1 1 80" 38"X82 1 /2" 3068 R IN
D03 1 3 84" 1 1 0"X87" 9070
D04 2 1 80" 32"X82 1 /2" 2668 L IN
D05 2 1 80" 34"X82 1 /2" 2868 L IN YES
Ariens ResidenceGarage Addition10905 Crooked Stick LnCarmel, IN 46032Date:Revision:
4
SHEET OF 15
SIGNATURE / SEALDESIGNER: TYLER VARGO
E: tylerv@customlivingusa.com
C: 574.274.4155Client Initials:
Date:
The plans, including all text, drawings, concepts and ideas,
forming a part of the plans, and the selection and
arrangement thereof Copright 2018 by Custom Living, Inc.,
Indianapolis IN. ALL RIGHTS RESERVED. The plans shall
remain the property of Custom Living Inc. Any use of the
plans, or their content, without the prior written permission of
Custom Living. Inc is strictly prohibited.CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462207/11/2019
DATE:
GENERAL PROPOSED PLAN NOTES
Framing contractors are responsible for all labor, for
the scope of work specifed on the drawings provided
by Custom Living.
Owner understands that Custom Living has only
provided a labor and material allowance for the scope
of Rough Carpentry work specified on the drawings.
Any additional work added or uncovered during this
scope will be a Change Order during construction
Owner understands that the Drywall Allowance is
based on an estimated board count and square
footage take-off. A final walk through with drywall
contractor after framing and mechanical rough-ins will
be necessary to finalize drywall install and finish
budgets.
Final drywall touchups will follow countertop
installation.
** PRINTS TO SCALE IF PRINTED ON 24" X 36" **
FIRST FLOOR PLAN
SCALE 3/8" = 1-0"
FRAMING PLAN NOTES
A. Ceiling Height: 9' - 0"
B. Frame Interior & Exterior 2x4 walls as shown on
prints
C. Stud Spacing: 16" O.C.
D. Install all load bearing framing components as shown
on prints
E. Pressure treated bottom plate
F. Frame all door openings as shown on prints
G. Ceiling Joists: 16" Engineered Trusses @ 16" O.C.
(direction as shown)
H. W8X67 dropped steel beam as spec'd by structural
engineer
I. Adjustable Steel Post, Cap. > 10,500 lbs.
J. Frame pony wall with 1x6 top cap
K. Louvered door to Utility Room
L. Epoxy Floor Finish (Garage & Utility Room)
M. (2) Ply 1 3/4" X 11 7/8" Dropped LVL as Spec'd by
Structural Engineer. Finish: wrapped in 1x smart trim
N. (2) 2x10 Dropped Header as spec'd by structural
engineer. Finish: wrapped in 1x smart trim
O. Pressure Treated 4x4 post wrapped with 1x6 smart
trim
INSULATION PLAN NOTES
Foam and fire caulk all exposed and accessible
mechanical penetrations per Municipal Building Code.
Install low expansion foam or backer rod around
accessible exterior windows and doors.
Install (1242 SF) R-15 Kraft Faced Fiberglass Batt
insulation on exterior walls
Install (900 SF) R-38 ceiling insulation in ceiling
cavities below second floor living space
DRYWALL PLAN NOTES
Install drywall on all wall framing
Install drywall on stairway wall framing leading to 2nd
floor
Interior Walls-Level 4 Finish (Smooth)
Install drywall on garage & utility room ceiling framing
Drywall wrap dropped steel beams
Interior Ceilings- Level 4 Finish (Smooth)
09/25/19
Adam Schriner