Loading...
HomeMy WebLinkAboutS200.0DN W01 W01 W01 W01 D04 D05 2'-2"5'-8"5'9'-6"43' 2'-1 0 3/4"3'-6 1/2"1 3'-2 7/8" 1 4'-6" 21'-2 1/2"4'-6" 3'-7"3'-7"8'-1 "9'-3" 9'-3" 6'-0 3/4" 11'-5" 11"BATH WORKOU T LOFT FF FF GG HH II EXISTING 2X4 FRAMING DEMOLITION & FRAMING KEY NO DEMO IN THIS ROOM EXISTING 2X6 FRAMING WALL SECTION TO BE REMOVED NEW 2x4 FRAMING NEW 2X6 FRAMING BULK HEAD / LOWERED CEILING WINDOW SCHEDULE NUMBER FLOOR QTY TOP R/O SIZE W01 2 4 76" 85"X43" 7036 DOOR SCHEDULE NUMBER FLOOR QTY TOP R/O SIZE FIRE D01 1 1 80" 38"X83" 3068 L EX D02 1 1 80" 38"X82 1 /2" 3068 R IN D03 1 3 84" 1 1 0"X87" 9070 D04 2 1 80" 32"X82 1 /2" 2668 L IN D05 2 1 80" 34"X82 1 /2" 2868 L IN YES Ariens ResidenceGarage Addition10905 Crooked Stick LnCarmel, IN 46032Date:Revision: 5 SHEET OF 15 SIGNATURE / SEALDESIGNER: TYLER VARGO E: tylerv@customlivingusa.com C: 574.274.4155Client Initials: Date: The plans, including all text, drawings, concepts and ideas, forming a part of the plans, and the selection and arrangement thereof Copright 2018 by Custom Living, Inc., Indianapolis IN. ALL RIGHTS RESERVED. The plans shall remain the property of Custom Living Inc. Any use of the plans, or their content, without the prior written permission of Custom Living. Inc is strictly prohibited.CUSTOM LIVING5335 Winthrop AveIndianapolis IN 462207/11/2019 DATE: ** PRINTS TO SCALE IF PRINTED ON 24" X 36" ** SECOND FLOOR PLAN SCALE 3/8" = 1-0" FRAMING PLAN NOTES A. Ceiling Height: 8' - 0" @ flat ceiling B. Frame Interior & Exterior 2x4 walls as shown on prints C. Stud Spacing: 16" O.C. D. Frame all door openings as shown on prints E. Ceiling Joists: 2 x 6 @ 16" O.C. (direction as shown) F. Flat ceiling breakline G. Carpet Floor Finish H. LVT Floor Finish I. Stained Red Oak Treads with Painted Risers on Stairs. Install red oak hardwoods on landing and stain to match treads. Install wall mounted railing on right side of stair way. INSULATION PLAN NOTES Foam and fire caulk all exposed and accessible mechanical penetrations per Municipal Building Code. Install low expansion foam or backer rod around accessible exterior windows and doors. Install (800 SF) R-15 Kraft Faced Fiberglass Batt insulation on exterior walls Install (650 SF) R-38 attic insulation Install baffles from soffit to roof peak Install ridge vent Install closed cell foam insulation on sloped ceiling surfaces DRYWALL PLAN NOTES Install drywall on all wall framing Interior Walls-Level 4 Finish (Smooth) Install drywall on garage & utility room ceiling framing Interior Ceilings- Level 4 Finish (Smooth) GENERAL PROPOSED PLAN NOTES Framing contractors are responsible for all labor, for the scope of work specifed on the drawings provided by Custom Living. Owner understands that Custom Living has only provided a labor and material allowance for the scope of Rough Carpentry work specified on the drawings. Any additional work added or uncovered during this scope will be a Change Order during construction Owner understands that the Drywall Allowance is based on an estimated board count and square footage take-off. A final walk through with drywall contractor after framing and mechanical rough-ins will be necessary to finalize drywall install and finish budgets. Final drywall touchups will follow countertop installation. 09/25/19 Adam Schriner