Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
B19902307
Framer to apply 2x4 purlins atop horizontal top chords 2' OC Patio Loading Patio Loading Standard Roof Loading Bearing points Flushbeam(byothers) TG01 TG02TG03 GE01 GE01TG04TG05GE02 GE02 TG06T01T02T03T04T05T06GE05 GE06 GE07 T07T08T09T10T11T12T13T14T15M01(16)M02(16)M06(8)M07(8)M08(4)22-07-004-08-00 16-10-00 10-05-002-03-08 64-05-00 46-05-0820-03-00 5-02-08TG08T20TG08CG03 C G 0 3 C G 0 3 CG03 J07J08 J09 J11 J07 J08J11 J09 J10(3)J10(3)13-06-00 12-07-004-08-04 2-00-00 Flushbeam(byothers) Flushbeam(byothers) 2x4 ledger 2x4ledger TG07T16T17T18J01CG01J02 CG02CG02J03 J04 J05 J06J03J04 J06J05T19(7) M03(10 )M04(9)27-03-0050-07-00 7-00-08 95-07-00 26-07-00 10-04-00 6-00-00 IRC2003TPI2002 ®¯TLL- °¯TDL- °¯BDLHomesbyMcKenzie Townhouse 4Hamlet 1/4"=1'September13,2019 PH B19902307CUSTOMER:LOCATION:MODEL:JOB#: DATE:DESIGNER: DESIGNINFORMATION: SCALE:9028OldSR67South Mooresville,IN46158 (317)834-5380Truss Placement Guide 1) This layout is intended for the purpose of truss location andplacementonly.Refertothebuildingplansforactual buildingconstruction. 2) All dimensions shown 00-00-00 are in feet-inches-sixteenths. 3) Trusses are spaced 16" on center unless otherwise noted. 4) Do not cut or modify trusses. 5) Refer to the individual truss design drawings for the location ofmemberbracing,upliftandtrussendreactions. 6)Installationofalltemporaryandpermanentbracingis essential. See truss drawings, BCSI-B2 Summary Sheet andbuildingdesignerrequirements. 7)Non-bearingwallsmaynotbeshownonlayout. 09/30/19 William Hohlt