Loading...
HomeMy WebLinkAboutS003 - 16LEGUP 4045 GW 4040 GW FURN. SUMP EJECT WH WS R.I. UNFINISHED BEDROOM UNFINISHED BATH MECH/ STORAGE FUTURE GAME FUTURE WETBAR FUTURE MEDIA DROPPED MECHANICAL BULKHEAD DUCT CHASE ABOVE 27'-4" X 24'-9"SLAB RECESSED 4"UP LANAI FOUNDATION 2 CAR GARAGE FOUNDATION 1 CAR GARAGE FOUNDATION DROPPED BEAM 2/8-6/8ROUGH IN FOR WET BAR 4045 GW 4040 GW4040 FX-100S FRAME FOR FUTURE 2/8-6/8 DOOR FRAME FOR FUTURE PAIR OF FUTURE 2/6-6/8 DOORS 2/8-6/8 HBHB BRING RAIL UP 3 RISERS FLUSH WOOD BEAM TO CARRY POINT LOAD FROM ABOVE 48" W. OPENING w/LVL HEADER IN STUD KNEE WALL STUD KNEE WALL CUSTOMER:PROJECT NAME:LOCATION:DRAWING TITLE: DRAWN BY:WedgewoodBuilding Co., LLC317.669.6300 32 First Street NECarmel, IN 46032www.wedgewoodbc.comCopyright c 2015 Wedgewood Building Co. LLC.9/18/2019 2:31:00 PM A9Wedgewood Building Co.WINDFIELD INVENTORY HOME16 OVERLOOK AT LEGACYLOWER LEVEL INTERIOR FINISH MAEFINISH PLAN NOTES: 1. REFER TO COVER PAGE FOR SPANISH TRANSLATIONS = REFERIRSE A LA PORTADA DE LAS TRADUCCIONES AL ESPAÑOL.Rev.No. Date Description1/4" = 1'-0"1 LOWER LEVEL INTERIOR FINISH PLAN By Michael Evertsen at 2:45 pm, Sep 18, 2019 09/27/19 Mike Sheeks