Loading...
HomeMy WebLinkAboutGradex/Eng/CO #3/8,986.79/North Range Line Road Reconstruction – Project # 16- ENG-49 City of Carmel Project 16- ENG-49 North Rangeline Road Reconstruction CHANGE ORDER #3 Additonal Drainage/Asphalt Cores/Snow Fence Contract Price prior to this Change Order $4,082,595.36 Contract Price will be increased by this Change Order $8,986.79 New Contract Price including this Change Order $4,091,582.15 Amount Adjusted Contract Cumulative %Change Price from Original Contract Original Contract $4,541,978.00 $4,541,978.00 N/A CO1 (-$484,726.89) $4,057,251,11 -10.67% CO2 $25,344.25 $4,082,595.36 -10.11% CO3 $8,986.79 $4,091,582.15 -9.92% Page 1 of 2 CITY OF CARMEL a4a TO: Tom DeKlyen CONTRACT CHANGE ORDER NO.: 3 00% Gradex,inc. DATE: 7/9/2019 12900 N.Meridian St.,Suite 120 PROJECT NAME: N. Rangeline Road Reconstruction / Carmel,IN 46032 Project#16-ENG-49 CITY REQ. NO.: CITY PO NO.: COIT-100417/ S W-100425 CITY PO DATE: COIT- 5/4/2017/ SW—5/6/2017 I. You are directed to make the following changes in this Contract: *All additional work associated with the documents referenced below. *This Change Order is being created to compensate Gradex Inc. for an additional drainage structure/pipe, exploratory asphalt cores and the addition of snow fence. • All items created are based on the below referenced attachments. *This Change order will create three new items: • "Additional Drainage", (Item#180 - 1 LUMP SUM= $7,055.41) • "Asphalt Cores", (Item#181 — 1 LUMP SUM=$911.20) • "Snow Fence", (Item#182— 1 LUMP SUM =$1,020.18) II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: *GRADEX INVOICE—ADDITIONAL DRAINAGE *GRADER INVOICE—ASPHALT CORES *Change Order 3 Report-N. Rangeline Road Reconstruction The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order $ 4,082,595.36 Contract Price will be increased/dccreascd by this Change Order $ 8,986.79 New Contract Price including this Change Order $4,091,582.15 Contract Time Prior to this Change Order Days Completion Date Current Contract Time including this Change Order Days Completion Date This Change Order is for full and final settlement of all direct, indirect, impact costs and time extensions incurred at any time resulting from the performance of the changed work. AR-1 Page 2 of 2 The Above Changes Are The Above Changes Are Approved: � Recommended: Accepted: /� United Consulting Gradex Inc. 2 A -9:-- ENGINEER CONTRACTOR es Brainard,Mayor 12900 N. Meridian St., J &4 ���1625 N.Post Road Suite 120 Address Address M n B ,Me ber Indianapolis,IN 46219 Carmel, In 46032 City/State/Zip City/State/Zip Lo ' W ' , Member By: By: • � ,� A • lvt777 �'�ii1 LA,. (.,,YLC (j J Phone: 317 724 5582 (/ Phone: 31/-57z- 3970 t Chns ne S. Pauley, erk e(A6 - Treasurer Date:7/11/2019 Date:_ 4ijo5' Zol q Jer y slim a , .E. Engineer Date:) — Z — 1