Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Packet for PC 10-15-19
Schafer Powder Coating Expansion 4518 W 99th Street Carmel, Indiana Information Packet Prepared For: Schafer Powder Coating, Inc. 4518 W 99th Street, Carmel, IN 46032 Prepared By: Mike Timko, P.E. Kimley-Horn and Associates, Inc. 250 East 96th Street, Suite 580 Indianapolis, Indiana 46240 October 15, 2019 Plan Commission Public Hearing Schafer Powder Coating Inc. Building Expansion – Carmel, Indiana Page 2 Table of Contents Project Summary ................................................................................................... 3 Attachments .......................................................................................................... 4 TAC Application & ADLS Application ….………………………………………………….………………………………………………….4 Site Location Exhibit ....................................................................................................................................... 5 Site Plan ................................................................................................................................................ 6 Landscape Plan ............................................................................................................................................... 7 Lighting Plan ................................................................................................................................................ 8 Architectural ................................................................................................................................................ 9 Grading and Drainage Plan .......................................................................................................................... 10 Utility Plan .............................................................................................................................................. 11 Proof of Public Notice .................................................................................................................................. 12 Schafer Powder Coating Inc. – Carmel, Indiana Page 3 Project Summary Kimley-Horn and Associates, Inc. has been retained by Schafer Powder Coating Inc. to prepare construction documents and provide civil engineering services for the proposed Building Expansion (Project) in Carmel, Indiana. The Project includes the +/- 31,500 SF industrial building expansion; parking lot improvements; storm sewer installation and improvements (including BMP’s); landscaping; and additional lighting. All enhancements increase the impervious area to 69% on the 5.55 acre site (90% allowable). The building expansion was considered when the detention pond was designed during the initial development, so the site will not require additional detention capacity. Schafer Powder Coating Inc. – Carmel, Indiana Page 4 TAC Application & ADLS Application Schafer Powder Coating Inc. – Carmel, Indiana Page 5 Site Location Exhibit Hamilton County, Indiana Parcels Subdivisions Interstates & US Highways State Highways Major Roads Minor Roads Lakes & Reservoirs Rivers & Streams Corporate Limits (Label) October 3, 2019 0 0.1 0.20.05 mi 0 0.15 0.30.075 km 1:6,000 Hamilton County compiled this map. Although strict accuracy standards have been employed, Hamilton County does not warrant or guarantee the accuracy of the information contained herein and disclaims any and all liability resulting from any error or omission.Author: Hamilton County Schafer Powder Coating Inc. – Carmel, Indiana Page 6 Site Plan SEA Group, Land Surveyors SEA Group, Land Surveyors PROPOSED BUILDING EXPANSION ±31,500 SF PARKING SUMMARY BENCHMARKS PAVING AND CURB LEGEND KEY NOTES ©SCHAFER POWDER COATINGEXPANSION ENGINEERED SITE PLAN4518 W 99TH STREET, CARMEL, IN 46032SHEET NUMBER EX.1 10/03/2019 NORTH Schafer Powder Coating Inc. – Carmel, Indiana Page 7 Landscape Plan SEA Group, Land Surveyors SEA Group, Land Surveyors DRY DETENTION SEED MIX; 0.50 ACRES LAWN LAWN LAWN LAWN PROPERTY LINE PROPERTY LINE PROPERTY LINE PROPERTY LINE PERMANENT SEEDING AMERITURF FRONTRUNNER BLEND TALL FESCUE; APPLY AT A RATE OF 350 LBS/ACRE (8LBS/1000 SQFT) SEEDING LEGEND DRY DETENTION SEED MIX CARDNO SWALE SEED MIX; APPLY AT A RATE OF 33.75 PLS LBS/ACRE PERMANENT SEEDING AND PREPARATION NOTES 1.CONTRACTOR TO FINE GRADE AND PREPARE ALL SITE AREAS TO RECEIVE SEED. MAKE SITE SMOOTH TO FINAL GRADING PLAN ELEVATIONS, FILL IN DEPRESSIONS AND LOW SPOTS. 2.ALL LAWN AREAS TO RECEIVE 6" APPROVED TOPSOIL PRIOR TO SEEDING OPERATIONS. ONCE TOPSOIL HAS BEEN PLACED, CONSTRUCTION ACTIVITY OF ANY KIND EXCLUDING LANDSCAPING SHALL NOT BE PERMITTED ON OR ACROSS ANY PLANTING AREA. CONTRACTOR SHALL FULLY EXCAVATE ANY PLANTING AREA THAT IS DISTURBED AND REPLACE WITH APPROVED TOPSOIL. 3.SCARIFY SOIL TO DEPTH OF 3" PRIOR TO APPLICATION. 4.LAWNS SHALL BE SEEDED FOLLOWING SCARIFYING, FINAL GRADING, FERTILIZING, AND RAKING. LAWN SHALL BE FERTILIZED WITH 12-12-12 ANALYSIS FERTILIZER AT A RATE OF 10 LBS/1000 SF. APPLY SEED MIX AT SPECIFIED RATE AND LIGHTLY RAKE INTO TOP 1 4 INCH OF TOPSOIL. 5.MULCH SEEDED AREAS WITH STRAW MULCH AT A MINIMUM RATE OF 11 2 TON PER ACRE (70 LBS/1000 SF). CRIMP OR TACK STRAW TO REMAIN IN PLACE UNTIL COMPLETE GERMINATION OF SEED AND ESTABLISHED GROWTH. 6.WATER AND MAINTAIN GRASS UNTIL STAND IS ESTABLISHED AND READY FOR MOWING AT A 4" MINIMUM HEIGHT. CONTINUE TO WATER FOR 30 DAYS OR UNTIL ACCEPTED BY OWNER. 7.FOLLOWING SEEDING OPERATIONS, CLEAN UP EXCESS MATERIALS, AND CLEAN ALL BARK MULCHED AND PAVED AREAS. 8.ALL LAWNS SHALL BE GUARANTEED TO HAVE A FULL UNIFORM STAND OF ACCEPTABLE GRASS AT THE END OF THE ONE YEAR GUARANTEE PERIOD, WITH NO BARE SPOTS COMPROMISING MORE THAN 2% OF ANY LAWN AREA. ANY AREA SO NOTED WILL BE RESEEDED OR SODDED UNTIL AN ACCEPTABLE STAND OF GRASS IS ESTABLISHED. 9.ALL DISTURBED LAWN AREAS SHALL BE SEEDED AS NOTED AND AS APPROVED BY OWNER'S REPRESENTATIVE. DRY DETENTION SEEDING AND PREPARATION NOTES 1.CONTRACTOR TO PREPARE ALL DRY DETENTION AREAS TO RECEIVE SEED. STABILIZE ERODIBLE AREAS AND IDENTIFY AND REMOVE UNWANTED VEGETATION. CLEAR AREA OF DEBRIS AND MOW EXCESS EXISTING VEGETATION SO AS NOT TO INTERFERE WITH SEED DISTRIBUTION. 2.INSTALL SEED DURING THE FALL AND LATE SPRING MONTHS FROM SEPTEMBER TO JUNE. PLANT SEED BY HAND BROADCASTING. TO AID SEED DISTRIBUTION, COMBINE SEED MIX WITH FILLER MATERIAL SUCH AS SAWDUST, SAND, OR VERMICULITE. FILLER MATERIAL TO BE DRY SO AS NOT TO INTERFERE WITH DISTRIBUTION. 3.SCARIFY SOIL TO DEPTH OF 3" PRIOR TO APPLICATION. 4.LIGHTLY RAKE SEED INTO TOP 1 4 INCH OF TOPSOIL. 5.WATER AND MAINTAIN SEED UNTIL GERMINATION AND ESTABLISHMENT. REMOVE UNWANTED INVASIVE PLANTS WITH SELECTIVE TREATMENT DURING ESTABLISHMENT PERIOD. 6.ALL DRY DETENTION AREAS SHALL BE SEEDED AS NOTED AND AS APPROVED BY OWNER'S REPRESENTATIVE.©SHEET NUMBER EX. 3 10/04/2019 NORTH SCHAFER POWDER COATINGEXPANSION LANDSCAPE EXHIBIT4518 W 99TH STREET, CARMEL, IN 46032 Schafer Powder Coating Inc. – Carmel, Indiana Page 8 Lighting Plan Schafer Powder Coating Inc. – Carmel, Indiana Page 9 Architectural Schafer Powder Coating Inc. – Carmel, Indiana Page 10 Grading and Drainage Plan Schafer Powder Coating Inc. – Carmel, Indiana Page 11 Utility Plan Schafer Powder Coating Inc. – Carmel, Indiana Page 12 Proof of Public Notice