HomeMy WebLinkAboutSanitary Sewer Permit CLAY TOWNSHIP REGIONAL WASTE DISTRICT
SANITARY SEWER PERMIT
[ ] Conditional Permit [ X] Final Permit
INDIVIDUAL LOTS/EXISTING BUILDINGS
Project Title: Clay Waste West
Location: Village of WestClay sec 3001 B
Owner/Builder: William Gordon Group
Lot#737 Street address:12584 Brandford St
City: Carmel Zip:46032 County: Hamilton
Interceptor Charges Paid: LOC n/a EDU Fee 1,200.00
PLEASE NOTE: Installation of building sewer shall be per the specifications of the Clay Township
Regional Waste District(see reverse)and any conditions noted below. All installations shall be inspected by District
personnel during "open trench"phase and before backfilling with sand or stone to six inches above the pipe. NO
footing or foundation drains, or other sources of ground or stormwater, shall be permitted to enter the District's
sanitary sewer system.The District will assume no liability for drains which are below the grade level of the
nearest downstream manhole nor for laterals which are extended beneath driveways or sidewalks.The
permit holder(property owner, developer or builder)will be responsible for damages to the District's sewer system.
This includes damages to manholes, castings, manhole lids and the like; caused by construction activity on the
building site which is the subject of this permit.
Inspections by the District are MANDATORY and shall be arranged by contacting the District's office at 844-9200
24 hours in advance.All new construction will be placed on billing six months after connection has been made or
when water is connected, whichever comes first.
a District will inspect all sump pump connections 30 to 60 days after the lateral inspection has been
completed.
t/ I have received a copy of Ordinance No. 9-13-99 and agree to follow all District standards. Building
has a[ ] crawl space [ ]slab or[ ] basement that [ ]will be finished, [X]rough-in plumbing with grinder
pump installed during construction, [ ] rough-in plumbing only and grinder pump will not be installed
during construction, [ ] no plumbing in the basement. (Please check appropriate box.) Builder will notify
the District office when the grinder pump installation is completed.
Conditional Permit Terms:
[ ] NO CONNECTION to the sewer until further notification.
[ ] Certificate of Insurance must be on file with CTRWD listed as certificate holder.
[ ] 48 hours notice before work starts on manhole core drilling or cuts of active lines
and District inspector must inspect all work before covered.
[ ] All District fees will be paid in full.
[ ] Approval pending Districts review of plans.
[ ] Copies of approved permits from appropriate county or city agencies for work in
the right-of-way road cuts or are required.
[ ] No occupancy until further notification
[ l ......_._............_.._.._.._................_.__.._...............:__.._...._......................_.........._.
All Conditions have been met and final permit issued 20 .
By signing below, I attest that I am familiar with the District's specifications and agree to accept responsibility for all
work done under this permit.
_ ' . 582-0900
Builder/Owner Signature Phone
Printed Name
Inspection Fee Paid: $75.00 paid yes 2 site plans submitted
Permit issued the 28'h day of June 2002.
Permit is valid for ONE-YEAR from the date issued.
A *dub
y W.Alle , Utility Mana a
sv CTRWD
Permit valid only with CTRWD seal in red ink.
Permit-rev.01-01/cjf AfGfpt+pL��"'