HomeMy WebLinkAboutA010.3FURNISH & INSTALL NEW PARAPET WALL
(REFER TO DETAILS)
FURNISH & INSTALL NEW SCUPPER (REFER TO
DETAILS)
SLOPE DOWN TO SCUPPER
SLOPE DOWN TO SCUPPERFURNISH & INSTALL NEW .060 EPDM ROOF
OVER TAPERED INSULATION. RUN MEMBRANE
OVER TOP OF PARAPET WALLS & UP FACE OF
EXISTING BRICK WALLS TO NEW TERMINATION
BARS PER MANUFACTURER'S
RECOMMENDATIONS
N PERMIT
#1
ISSUE DATE:
2019-09-10
REV:
www.caseindy.com
99 E. Carmel Drive, Suite 100
Carmel, Indiana 46032
317.846.2600 317.846.2601(f)
These drawings have been prepared
by Case Design & Remodeling solely
for its use and should not be
reproduced or relied upon by any
other parties. Dimensions shown or
scaled are subject to change per
actual job condition and must be
verified. Materials are to be supplied
as specified as equal or standard
when not uniquely specified. Installed
materials may vary in appearance
from drawings. Reference
manufacturer's product data for actual
appearance and specifications.
CAMPBELL PROJECTFRONT PORCH ADDITIONBOB & SUSAN CAMPBELL14378 AVIAN WAY
CARMEL, INDIANA 46033Approved By:
Date:
A301
Craig Dice
Designer
cdice@caseindy.com
Dave Null
Project Developer
dnull@caseindy.com
242160123
JOB NUMBER:
ROOF PLAN
SCALE: 1/2" = 1'
#2 2019-09-13
#3 2019-09-25
10/07/19
Adam Schriner