HomeMy WebLinkAboutGN010.0 - Sewer Permit10701 N. College Avenue Suite A Indianapolis, Indiana 46280 phone 317-844-9200 fax 317-844-9203 www.trico.eco
Residential SANITARY SEWER PERMIT 999913424
Permit Type Final Subdivision Waterfront at West Clay
Project WO ENG4312007 Section Number
Project Name Sanctuary at 116th Street Section 1, 2A, 3, 4A Lot Number 42-A
Project Developer Platinum Properties Address Number 11789
Lift Station
16 Zionsville Presbyterian Station
Address 2
Treatment Plant
CTRWID WWTP
Street
Parcel Acreage
0.33
City
EDU in Gallons
310
Zip Code
County
Local Sewer Charge - District Contribution
Plan Review and Inspection
Application Fee
EDU Fee
Interceptor Fee
Other Fees
Fees Due
Invoice Number
.0.00
Builder
0.00
150.00
Phone Number
1908.00
Owner
0.00
phone Number
0.00
2058.00
Occupant
Phone Number
West Road
Zionsville
46077
Hamilton
Paul Shoopman Home Building Group
317-415-0459
PLEASE NOTE: Installation of building sewer shall be per the specifications of the TriCo Regional Sewer Utility (see
reverse) and any conditions noted below. All installations shall be inspected by TriCo personnel during "open trench"
phase and before backfilling with stone to twelve inches above the pipe. NO footing or foundation drains, or other
sources of ground or stormwater, shall be permitted to enter TriCo's sanitary sewer system. TriCo will assume no
liability for drains which are below the grade level of the nearest downstream manhole nor for laterals which are
extended beneath driveways or sidewalks. The permit holder (property owner, developer or builder) will be
responsible for damages to TriCo's sewer system. This includes damages to manholes, castings, manhole [ids and
the like; caused by construction activity on the building site which is the subject of this permit.
Inspections by TriCo are MANDATORY and shall be arranged by contacting TriCo's office at 844-9200 24 hours in
advance. All new construction will be placed on billing two months after connection has been made or when water is
connected, whichever comes first.
The building has:
Main ID:
SNT825-SNT817
Grease Trap Slab Foundation
Grease Interceptor Crawl Space
Manhole IDs USMH
ENT-825 SNT-817 DSMH
Grit Interceptor Basement YES
Lid Elevation
906.27 Y
906.64v
Grinder Station
First Floor Elevation
908.90 /
908.90
Water Service City of Carmel
Basement Elevation
899.90
899.90 ✓ /
Calculation is based on both Manhole Lid Elevations and the elevation of the First Floor
2 63'
2.26Ft.!:
Per Ordinance 9-13-99 and the elevations provided, the substructure shall be plumbed by:
Ejector Pump Only
,�j� , TriCo currently requires that an I&I inspection is performed and a Certificate of Compliance is issued prior to occupancy 1
kr� 1� sale of a properrty. Please review attached III Permit.
Manholes shall remain accessible at all times. Buried manholes will be corrected by the Developer/Owner.
The proper class of cleanout must be installed every 100 feet of lateral pipe measured from sewer main to structure.
The terms of the conditional permit, if any, are listed below. G�otAAL SFy,FR
Plans have been submitted.
All fees haves hpPn nairt
No certificate of insurance required.
No additional permits required. 1 1 • T r i C o •
No manhole core permit required.
The facility is not classified as n Fnn facility
By signing below, I attest that I
Builder I Owner Signatui
Printed Name
Approved By
(Notes)
I'.
and agree to accept responsibility for all work done under this pennit.
Phone Number -D(-7- %W,^ z26?1
v
Engineer 09/25/2019
Permit is validtor ONt-YEAR from the date issued. Permit valid only with TriCo seal in red ink.
SUMMARY OF LATERAL INSTALLATION REQUIREMENTS
1. Only one building may connect to the sewer main per lateral unless otherwise approved by TriCo.
2. Foundation drains, sump drains, downspouts and other storm water drains shall never be connected to the sanitary sewer.
Site dewatering systems shall never be discharged to the sanitary sewer.
3. The existing sewer line from the building to the septic tank may only be reused if it is located under a building addition, patio,
porch or paved driveway, and the line passes an air test that is observed by TriCo. Contact TriCo for more information about
air testing requirements. The property owner is responsible for testing costs.
4. TriCo shall inspect all new laterals or lateral repairs in their entirety. Final connection to the sanitary sewer must be observed
by Trico. The property owner or contractor must notify TriCo prior to backfilling. Inspections must be scheduled at least 24
hours in advance. If an inspection fails and subsequent inspections are required, or if the contractor is not on site for the
scheduled inspection, a $100 Fee will be assessed and must be paid prior to scheduling the reinspection.
5. Septic system contents or effluent shall never be discharged to the sanitary sewer. Be advised that your county health
department regulates septic systems. Upon connection to sanitary sewer, a septic tank must typically be abandoned,
pumped clean, and filled completely with earthen material. Contact your county health department for more information on
septic system and abandonment requirements, and to notify the department of any abandonment.
6. The following materials are acceptable for use in gravity sewer lateral installation or repair:
PVC pipe: SDR 35 or SDR 26, ASTM D3034, 6" diameter
PVC pipe, pressure rated: SDR 21, ASTM D2241, 6" diameter
PVC restrained joint pipe for directional drilling: Certaflo Greenline SDR 21, ASTM D2241, 6" diameter
All gasketed joints shall meet ASTM D3212
All fittings shall be SDR26 or better
Ductile iron mechanical joint fittings with proper hardware
SDR 26 gasketed repair sleeves or Indiana Seal shear guard
Fernco and similar flexible couplings are only acceptable in certain circumstances and shall not be used without
prior approval from TriCo
Cleanouts: 6" threaded PVC caps
Bedding: Use #8 crushed stone or fractured face aggregate
The following materials are acceptable for use in low-pressure sewer lateral installation or repair:
NDPE pipe for directional drilling: DR 11 IPS, 1.25" diameter, PE4710
Connections shall be made via electrofusion or using polypropylene or stainless steel compression fittings
Electrofusion high volume tapping tee, rated 200 psi, PE4710
1.25" IPS full port 1/4 turn fusible PE ball valve, rated 200 psi
Threaded swing check valve, 316 stainless steel, rated 200 psi
Contact TriCo for acceptable pump station materials, equipment, pumps and other requirements
7. For gravity and low-pressure systems, the line leaving the building shall not exceed 3' in length before a cleanout must be
added and the line is transitioned to 6" diameter SDR 35 PVC pipe. Glued joints are not allowed after 3'. Na additional glued
fittings are allowed between the building and the transition/cleanout. For all gravity lines, cleanouts shall not be spaced more
than 100' apart between the building and the sewer main. See TriCo's standard drawings for more information on cleanout
installation.
8. Bedding material shall be placed from at least 6 inches below to 12 inches above the pipe surface. The trench shall be a
minimum of 18" wide with at least 6" of clearance on both sides of the pipe. Material shall be placed over the pipe and tracer
wire after inspection. Soft, unstable or unsuitable material found below and near the lateral, including any fill or foundation
backfill material, must be removed and replaced with #8 stone. The contractor is solely responsible for establishing stable
pipe bedding conditions.
9. #10-AWG solid copper tracer wire shall be laid on top of and run the entire length of the lateral. All splicing of tracer wire
shall use 3M splice kit model DBRN-6, King Innovation Dryconn Direct Bury Lug Aqua catalog #90220, or TriCo approved
10. Laterals shall be installed at least 20' from water wells unless PVC pressure grade pipe is used. Any proposed installation
requiring pressure pipe shall be reviewed by TriCo prior to installation. Where a transition is made between SDR 35 pipe and
pressure grade SDR 21 pipe, a ductile iron gasketed mechanical couplings must be used.
11. Laterals less than 5' deep shall be at least 24" from the property line. Laterals more than 5' deep shall be at least 36" from
the property line. Where the lateral runs in close proximity to the property line the property corners must be accurately
staked by a professional land surveyor prior to inspection.
12. Laterals running parallel to a building or structure shall be at least 36" from the face of a crawl space or slab on grade
foundation and 60" from the face of a basement foundation wall. Spacing requirements also apply with respect to the
ancillary structure's foundation depth. Ancillary structures (e.g. window wells) and other utilities shall not be placed over or
near the lateral. TdCo may adjust requirements where future access to the lateral may be obstructed by other utilities. The
contractor should call to discuss further if he/she believes this could be an issue.
13. All infrastructure connected to TriCo's sewer system may be tested, inspected, or televised at TriCo's discretion, and must
remain accessible and properly maintained.
14. Call 811 or 1-800-382-5544 before you dig. For more information go to www.indiana811.org.
TriCo Regional Sewer Utility
10701 North College Avenue Suite A
Indianapolis, Indiana 46280
Phone (317)-844-9200 Fax (317)-844-9203
Revised 0311912019