HomeMy WebLinkAboutMinutes TAC 04-23-89 /r
111111
11) May need variance for sign.
12) Co highway expressed concern about road standards, and lane on the
North side along entrances.
ale technical aspects of this project have been reviewed by the TAC and
found to be satisfactory pending the above concerns being addressed.
Cake- Forest Section 2
docket No. 14-89 S.P. , a secondary plat for Lake Forest, Section two. Site
is located on 116th St. just east of Carmel's Flowing Well. Plat consists
rf 23 lots on 8.5 acres.
'etitioners Present: Same as above (Sec 1)
Comments:
1) Off site easements need to be recorded prior to construction.
2) Need to have SPC 15 prior to release of sewer permits.
The technical aspects of this project have been reviewed by the TAC and
found to be satisfactory pending the above concerns being addressed.
aiderz Pond I ==
Docket No. 17-89 S.P. , a Secondary Plat for Walden Pond, Section three.
Site is located at the Northeast corner of 99th and Westfield Blvd. Plat
consists of 58 lots on 15.7 acres.
Petitioners Present: John Hodges (Estridge) and Norman Taylor (Woolpert)
Comments
1) SCS and Co Surveyor did not have clear plan of Section 3, request
section 3 be noted on utility and grading plan and submitted to
SCS and Co. Surveyor.
2) Origional plan did not show erosion control on 99th street, and
drainage, sidewalks, seeding, and erosion in area are all
problems from Section 2 that need to be addressed.
3) Need minimum 15' utility easement on all front yards abuting R/W.
4) DOCD would like to have erosion control in place prior to issuing
building permits.
5) Origional committments on landscaping on north and east sides need
to be addressed and implemented and plan showing those features
should be submitted.
6) Need as-builts of Geothermals.
7) Need compaction tests for any lots with over 2' fill.
8) Request that covenants reflect Homeowners Assn responsibility for
retaining walls.
9) Requested cooperation with keeping trash and debris contained on
site through use of construction fence.
10) Need map showing location of fire hydrants.
The technical aspects of this project have been reviewed by the TAC and
found to be satisfactory pending the above concerns being addressed.
4 •