HomeMy WebLinkAboutA02.5.21. SEE ELEC DWGS FOR ADDITIONAL LIGHTING INFORMATION. 2. SEE FINISH SCHEDULE FOR COLOR OF PAINT FOR EXPOSED DUCT IN SERVICE. 3. WHERE EXISTING CEILING GRID MEETS NEW, JOIN SO THERE IS NO DEFINITE TRANSITION BETWEEN EXISTING AND NEW. 4. EXTEND FINISH ABOVE ALL LINTELS / HEADERS TO DECK ABOVE IN AREAS WITH EXPOSED STRUCTURE OR TO6"ABOVE FINISHED CEILING. 5. COORDINATE ALL EXIT SIGN LOCATIONS AND MOUNTING HEIGHTS W/LOCAL FIRE MARSHAL. 6. EXISTING CEILING GRID AND LIGHT FIXTURES TO REMAIN WHERE NOTED BY HATCH. PROVIDE NEW CEILING TILES. PATCH AND REPAIR GRID WHERE DEMOLITION AND/OR CONSTRUCTION OCCURS. CLEAN RE -LAMP RE -BALLAST EXISTING AND RELOCATED LIGHT FIXTURES, INCLUDING IN SERVICE AND FOC. 7. ALL SITE LIGHTING BY OWNER 8. REVIEW EXISTING EXHAUST FANS. VERIFY WITH STORE IF EXISTING FAN(S) NEED REPLACEMENT. 9. PROVIDE NEW HVAC CEILING SUPPLY GRILLES IN ALL AREAS WHERE NEW CEILING TILES ARE INSTALLED. x-X^ CEILING HEIGHT ABOVE FINISHED FLOOR eoa EMERGENCY LIGHT; SEE ELEC. DWGS. EXP EXPOSED CEILING/CEILING FINISH ® EXIT LIGHT; SEE ELECTRICAL 0 FLUORESCENT PENDANT LIGHTING; SEE ELECTRICAL EXIT SIGN WITH DOUBLE HEAD; SEE ELEC. DWGS. 2 z 2 LIGHT FIXTURE ACT-1; 2'z4"ACOUSTICAL CEILING TILE 2 z 4 LIGHT FIXTURE ® EXISTING TRACK LIGHTING TO REMAIN ACT-2; 252'ACOUSTICAL CEILING TILE GYPSUM WALLBOARD CEILING o CANISTER DOWN LIGHT FIXTURE p WALL WASHING DOWN LIGHT FIXTURE PHOTOBOOTH T SEE DETAIL A2.5.2 4/A2.5.3 SCHEDULED6" STUD WALL— OPP T.O. SHELF — — — — — — II I I L — — — RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Cannel DATE: 10/14/19 1 1/2' = 11010 WRAP OPENING WITH 1/2" GWB, PAINT TO MATCH PHOTICBOOTH INTERIOR GWB JAMB BEYOND PAINTED BENT PLATE SEE STRUC; EXTEND TO LINTEL ABOVE 6 ' A2 5 2' �- --- 1 j j L------ i -OHPHOTOBOOTHDOOR NEW PARTITION V STEEL BENT PLATE; SEE STRUC DWGS SCHEDULED OVERHEAD DOOR GUIDE / TRACK CONCRETE SLAB; o SEE STRUC DWGS 14 14 41 (1:) NEW OH DOOR - SILL 2.5.2 1 1/2" BE 1IJ OVERHEAD DOOR T.O. OPENING 10'-8" 1/4" = 1'-0" PHOTO BOOTH SIDE SERVICE SIDE NEW FLOOR SLAB; CONT. 1/2" COMPRESSIBLE SEE STRUCT DWG FILLER W/ TRAFFIC SEALANT EXISTING. FLOOR SLAB; V.I.F. LAP THE NEW FLOOR SLAB VAPOR BARRIER OVER THE EXISTING FLOOR SLAB VAPOR BARRIER BY 6" MINIMUM, AND PROVIDE A CONTINUOUS SEAL SLAB & VAPOR BARRIER DETAIL I 1.rkillalan STEEL ANGLES TO BEARING JOIST; SEE STRUCT DWGS— STEEL ANGLE AT PERIMETER OF EQUIPMENT CURB PLAN: NOT TO SCALE =(ll IIPRAFMT f-I IPP EXISTING ROOF DECK AND INSULATION SECTION AA: NOT TO SCALE EQUIPMENT ROOF MEMBRANE TO EXTEND UP AND OVER WOOD BLOCKING COUNTER FLASHING EXISTING ROOF MEMBRANE W/NEW CURB WRAP ROOFCURB TAPERED FRT 2x BLOCKING NOTE: PROVIDE CONT. WOOD HAILERS TO MAKE CURB LEVEL WITH HORIZON R4 SKIM COATS/ NATIONAL GYPSUM QUICK SET LITE 45 FOAM SHAPE -1LB DENSITY; PAINT PDW6 SANDABLE BASE COAT MESH �4", 20 GA MTL STUDS @ 16" O.C. 4112" TURBO STICK FOAM ADHESIVE DETAIL - GBD SHELF RADIUS Rg, T A A2.5.2 I I I I I I 2'-6"FACE OF PLYWOOD I 41/2" SECTION - PHOTOBOOTH - CEILING RADIUS 1 1/9• BE 1•ll•• SUSPEND FROM STRUCTURE ABOVE, DO NOT HANG FROM ROOF DECK GWB; LEVEL 5 FINISH PRE-ENGINEERED FACTORY CURVED MAIN TEE CROSS TEE SPACED AS SPECIFIED BY MANUFACTURER GC PROVIDED AND GC INSTALLED FACETED GYPSUM CEILING SYSTEM; BASIS OF DESIGN: USG DRYWALL SUSPENSION SYSTEM. CONTACT PACE PICKEL [ppickel@usg.cam]-SYSTEM DESIGN TO BE APPROVED BY ARCHITECT AND STRUCTURAL ENGINEER COORDINATE WITH VENDOR 41,20 GA MTL STUDS @ 16" O.C. 1/2"FRT PLYWOOD TEKSCREWS 2' 1, 2'-1" 4'-6" /2'-3"/ 6 6 � -- 4 0I .. / - -- ----- --- - ------ -- �I ^I C \ q-g GYP BD SHELF 5'-4'p n '..PDW6: _li-LI till - II II Jill 14 0 i <I I> fu ev II I- Ii -I f. 91I.9" > MECH SUPPLY, TVP. i LI a SEE MECH DVJGS 11,-0 T iI a I. Ii n � II u I II IiI Ir u � II a II II II II II I II u II i i> —START POINT OF START POINT OF II I I I I 2 " SOFFIT RADIUS SOFFIT RADIUS _. - t i t Ill II II II iI a ��Q1 'i II lilt i 24' 240 240 � t i 1/4" = 1'-0" 24' B1111:zyaZI:r lrQcore .>IIMMIIW4:rrn 1�RRY L JIIRR A R C H I T E C T N ASSOCIATION WITH PIEPER O'BRIEN HERR ARCHITECTS ARCHITECT AND IS NOT TO HE REPRODRAIED IN WHOLE OR IN RODECT .Wo BE MTEDURNED UPON HERRE 19 NOT TO BE USED ON ANYNET VALID UNLESS BOARD AND SEQUED. RELEASED FOR CONSTRUCTION LATEST DA/PC DRAWN BY: w- CHECKED BY: 00 Z Q 00 W O O N 1 0 F O ' ° > Z '<C O W WE ZC7vi W n j �i N W w OIBM 0 d 0= Z j °W �Wso ZZ W ee F ONp a�$ () im ZBI PROJECT NO. I I DATE SHEET TITLE REFLECTED CEILING PLAN & DETAILS - PHOTOBOOTH � A2.5.2