Loading...
HomeMy WebLinkAboutLevel 2 Updated1. Demo existing wall and frame in recessed vanity area. Reroute electrical and plumbing 2. Frame pocket door opening. Reroute switches for bathroom lights. 3. Demo wall between old closet and bathroom. Shift new wall and reroute electrical and plumbing 4. Frame in new closet. No electrical work 5. Move Switch for lights to other side of the door. 6. Frame in water closet and reroute switch can can-fan. 14' 5" 2' 6 1/2" 3' 7 1/2" 2' 6" 5' 12' 6" 14' 6 1/2" 7' 12' 6" 13' 12' 8" 9' 5" 26' 1/4" 4' 9" 4' 6" 5' 3" 4' 1/2" 2' 1 2 3 4 5 6 Level 2 Updated CHIMNEY STAIRS MASTER BEDROOM BEDROOM 1 BEDROOM 2 BEDROOM 3 LANDING CLOSET CLOSETBATHROOM BATHROOM CLOSET SD SD SD SD SD 10/09/19 Mike Sheeks