HomeMy WebLinkAboutMIDTOWN FLATS POOL1 COVERGENERAL REQUIREMENTS AND GUIDELINES FOR THIS PROJECT:
THE CONTRACT DOCUMENTS CONSIST OF THE DRAWINGS AND SPECIFICATIONS
ON THE DRAWINGS. THE INTENT OF THE CONTRACT DOCUMENTS IS TO
INCLUDE ITEMS NECESSARY FOR THE PROPER EXECUTION OF THE WORK.
THE CONTROLLING CODE FOR ALL WORK UNDER THESE DRAWINGS SHALL BE
THE INTERNATIONAL BUILDING CODE 2014 WITH INDIANA AMENDMENTS, ALL IN
THEIR CURRENT ADDITIONS.
THE CONTROLLING DOCUMENT FOR ALL WORK UNDER THESE DRAWINGS
SHALL BE THE GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION,
AIA (AMERICAN INSTITUTE OF ARCHITECTS) DOCUMENT A201, CURRENT
EDITION. AGREEMENT BY ANY PARTY TO WORK UNDER THIS CONTROLLING
DOCUMENT SHALL COMMENCE WITH THE START OF ANY WORK DESCRIBED
WITHIN THESE DOCUMENTS.
THE ARCHITECT SHALL FILE FOR STATE PLAN REVIEW AND PROVIDE A RELEASE
FOR USE IN OBTAINING LOCAL PERMITS. THE GENERAL CONTRACTOR SHALL
FILE DRAWINGS OR OTHER MATERIALS FOR PERMIT APPLICATION AT THE
LOCAL LEVEL AND SECURE ALL NECESSARY BUILDING PERMITS. SUB-
CONTRACTORS TO THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
OBTAINING THEIR OWN LOCAL PERMITS.
PRIOR TO COMMENCING ACTIVITIES, EACH CONTRACTOR AND MATERIAL
SUPPLIER SHALL CAREFULLY STUDYAND COMPARE THE CONTRACT
DOCUMENTS AND BECOME FULLY AWARE OF THE REQUIREMENTS. EACH
CONTRACTOR AND MATERIAL SUPPLIER SHALL TAKE FIELD MEASUREMENTS
AND VERIFY FIELD CONDITIONS AND SHALL CAREFULLY COMPARE SUCH
MEASUREMENTS AND CONDITIONS WITH THE CONTRACT DOCUMENTS.
IN THE EVENT OF INCONSISTENCIES WITHIN OR BETWEEN THE CONTRACT
DOCUMENTS, EACH CONTRACTOR OR MATERIAL SUPPLIER SHALL PROVIDE THE
BETTER QUALITY OR GREATER QUANTITY OF THE WORK, AND SHALL COMPLY
WITH THE STRICTER REQUIREMENT. INCONSISTENCIES DISCOVERED SHALL BE
IMMEDIATELY REPORTED TO THE ARCHITECT IN WRITING.
NO PLEAS OF IGNORANCE RESULTING FROM FAILURE TO EXAMINE THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS OR THE CONDITIONS UNDER
WHICH THE WORK IS TO BE PERFORMED WILL BE ACCEPTED AS AN EXCUSE
FOR FAILURE OR OMISSION ON THE PART OF EACH CONTRACTOR AND
MATERIAL SUPPLIER TO FULFILL IN EVERY RESPECT ALL REQUIREMENTS OF
THE CONTRACT DOCUMENTS.
VERIFY THAT SURFACES TO RECEIVE MATERIALS ARE IN A CONDITION TO
ACCOMMODATE INSTALLATION. IMMEDIATELY REPORT TO THE ARCHITECT ANY
DISCREPANCIES OR ERRORS WHICH WOULD RESULT IN POOR APPLICATION OR
CAUSE LATENT DEFECTS IN WORKMANSHIP. IF A CONTRACTOR OR SUB-
CONTRACTOR PROCEEDS WITH INSTALLATION OF MATERIALS OVER ANOTHER
CONTRACTOR'S WORK, IT SHALL BE ASSUMED THAT THE CONTRACTOR OR SUB-
CONTRACTOR ACCEPTS THE WORK TO RECEIVE HIS MATERIAL.
ALL LABOR, CONSTRUCTION MATERIALS, PROVIDED AND INSTALLED TO
COMPLETE THE WORK OF THESE CONTRACT DOCUMENTS SHALL BE EXECUTED
IN COMPLETE COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL CODES,
PRACTICES OR ORDINANCES AND WITHIN THE CONSTRAINTS OF THE HIGHEST
ACCEPTABLE CONSTRUCTION PRACTICES.
UPON COMPLETION OF THE PROJECT, OBTAIN ALL FINAL INSPECTIONS AS
REQUIRED BY THE LOCAL JURISDICTIONS AND FURNISH OWNER WITH
EVIDENCE OF ALL SUCH INSPECTIONS AND CERTIFICATES OF OCCUPANCY, IF
ISSUED BY THE JURISDICTION.
THE GENERAL CONTRACTOR SHALL PROVIDE REASONABLE SUPERVISION AND
COORDINATION OF ALL SUB -CONTRACTORS WORK INCLUDING WORK
PERFORMED BY OTHERS SUCH AS SUPPLIERS OF OWNER -SUPPLIED ITEMS.
UPON COMPLETION OF PROJECT, PROVIDE OWNER WITH ALL INSTRUCTION
MANUALS, WARRANTIES OR OTHER DOCUMENTS REQUIRED FOR THE PROPER
OPERATION OR MAINTENANCE OF ANY PART OF THE CONTRACTOR'S WORK.
THE GENERAL CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION
AND SECURITY MEANS FOR HIS WORK UNTIL TURNED OVER TO THE OWNER. IF
THE PROJECT AREA IS TO BE USED BY EMPLOYEES OR THE PUBLIC DURING
CONSTRUCTION, FULLY PROTECT THE CONSTRUCTION SITE, CONSTRUCT
BARRIERS AND FENCING, AND PROVIDE APPROPRIATE SIGNAGE TO PROTECT
THESE PERSONS.
THE GENERAL CONTRACTOR SHALL PROVIDE AND MAINTAIN MINIMUM GENERAL
LIABILITY INSURANCE. THE FRANCHISEE, FRANCHISER, AND THE ARCHITECTS
SHALL BE HELD HARMLESS AGAINST ALL GENERAL LIABILITY CLAIMS THAT MAY
RESULT AS A PART OF THIS PROJECT.
ARCHITECT / ENGINEER NOTIFICATION:
IF THE GENERAL CONTRACTOR DISCOVERS CONDITIONS THAT ARE NOT
SUBSTANTIALLY LIKE THE ARCHITECT'S DRAWINGS, THE ARCHITECT OR
ENGINEER SHALL BE IMMEDIATELY NOTIFIED.
THIS NOTIFICATION RELATES TO ALL PARTS OF THIS PROJECT, INCLUDING BUT
NOT LIMITED TO DISCOVERED SOIL CONDITIONS, INAPPROPRIATE OR NON -
SPECIFIED PRODUCTS DELIVERED AND/OR INSTALLED ON SITE, OR ANY
QUESTION REGARDING POSSIBLE VIOLATION OF CODES OR ORDINANCE
STANDARDS.
PROCEEDING WITH THE WORK SHALL CONSTITUTE ACCEPTANCE BY THE
GENERAL CONTRACTOR OF THE EXISTING CONDITIONS, AND THAT THE
PROJECT CAN BE BUILT STRUCTURALLY SOUND AND MEETING LOCAL CODES.
,,.� Mdid fw : o
w, s,ew y.µ hw a w
«awr
N'w'V«wn maa
^"isa W w= =Tw%p!t
RELEASED FOR CONS? 4TION
Subject to compliance with all regulations
..a c,.a....d i..... i r..e...
City of Camel
DATE: 10/16/19
Indiana Adopted Codes for Building Construction
In effect December 1, 2014
2014 Indiana Building Code Adoption by Reference: 2012 Intemational
Building Code First Printing plus Indiana Amendments, effective December
1st 2014.
2009 Indiana Electrical Code Adoption by Reference: 2008 National
Electric Code First Printing plus Indiana Amendments, effective August 26,
2009.
2014 Indiana Fuel Gas Code Adoption by Reference: 2012 International
Fuel Code First Printing plus Indiana Amendments, effective December 1st
2014.
2014 Indiana Mechanical Code Adoption by Reference: 2012 Intemational
Mechanical Code First Printing plus Indiana Amendments, effective
December 1st 2014.
2012 Indiana Plumbing Code Adoption by Reference: 2006 Intemational
Plumbing Code Second Printing plus the Indiana Amendments, effective
December 24, 2012.
2005 Indiana Residential Code Adoption by Reference: 2003 International
Residential Code Fifth Printing plus Indiana Amendments, effective
September 11, 2005.
2014 Indiana Fire Code Adoption by Reference: 2012 International Fire
Code First Printing plus Indiana Amendments, effective December 1st 2014.
2010 Indiana Enerev Conservation Code Adoption by Reference: 2007
Edition ASHRAE 90.1 plus Indiana Amendments, effective May 6, 2010.
A Complete list of all codes and other rules adopted by the Fire Prevention & Building
Safety Commission of the State of Indiana along with PDF versions of the Indiana
Amendments can be found at-
mW-//www.in.unv/dhs/2490.htm NEW POOL FOR:
MIDTOWN FLATS
591 MONON BOULEVARD
CARM E L, INDIANA
POOL BUILDER
TERRY
OL
We Bring Stondords & Ethics to the Art of Pool Building
ARCHITECT
INDEX OF DRAWINGS OF THIS SET:
COVER SHEET, GENERAL PROJECT GUIDELINES, SHEET
INDEX, RENDERING OF POOL DECK
0.1 DECK FLOOR PLAN BY OTHERS
1.1 DIMENSION POOL PLAN; GATE DETAILS; OVERALL POOL
SPECIFICATIONS
1.2 DIMENSION POOL PLAN; POOL DATA; POOL EQUIPMENT BY
POOL CONTRACTOR
1.3 POOL PIPING SCHEMATIC PLAN, EQUIPMENT ROOM
SCHEMATIC
2.1 TRANSVERSE POOL SECTION; LONGTUDINAL POOL SECTION
3.1 POOL WALL AND STEP DETAILS
3.2 MISCELLANEOUS DETAILS
3.3 EQUIPOTENTIAL BONDING REQUIREMENTS;
MISCELLANEOUS DETAILS, GROUNDING REQUIREMENTS
4.1 DETAILS OF POOL COPING AND MAIN DRAIN; EQUIPMENT
SCHEMATIC; OVERALL POOL SPECIFICATIONS.
5.1 FILTER; PUMP; AND SKIMMER CUT SHEETS.
WORK BY OTHERS:
PART OF THIS PROJECT INVOLVES WORK BY OTHERS. THIS POOL WORK
DEPENDS ON SITE WORK, SITE DRAINAGE, THE CLUBHOUSE BUILDING AND
OTHER RELATED CONSTRUCTION. THAT WORK IS BEING DESIGNED BY OTHER
ARCHITECTS AND ENGINEERS AND CONSTRUCTED BY OTHER CONTRACTORS.
WHILE WE AGREE TO COORDINATE OUR WORK WITH THOSE COMPANIES, WE
CANNOT BE HELD RESPONSIBLE FOR BUILDING CODES AND CONSTRUCTION
GORDON CLARK ARCHITECT AIA
RELATED TO THAT OTHER WORK. THE POOL ARCHITECT AND POOL
s"`� EMA%aaa-,
CONTRACTOR SHALL BE HELD HARMLESS FROM ANY VIOLATIONS OR
CONSTRUCTION DEFECTS RELATED TO WORK BY OTHERS.
4820 Buttonwood
Crescent
" "°
g
• aa0003zsa7 • e
THE POOL CONTRACTOR SHALL HAVE REASONABLE ACCESS TO THE PARTS OF
Indianapolis,
Indiana
46228
0
srnre of
THE CLUBHOUSE BUILDING BEING CONSTRUCTED BY OTHERS, SO HE CAN
Phone:
317
255-2546
COMPLETE HIS WORK IN ATIMELY MANNER.
Fax:
317
252-5573
DRAWING COMPLETION DATE:
JULY 127 2019