Loading...
HomeMy WebLinkAboutGN001 General NotesGENERAL PROJECT NOTES ].BUILDING CODE COMPLIANCE: ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF THE EXISTING BUILDING CONSTRUCTION TYPE AS DEFINED BY SECTION 601 OF THE INDIANA BUILDING CODE. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE STATE AND LOCAL BUILDING CODES. CONTRACTORS ARE RESPONSIBLE FOR VERIFYING THE CURRENT APPLICABLE BUILDING CODES) FOR THEIR RESPECTIVE SCOPE OF WORK. ENSURE THAT ALL MATERIALS AND LABOR ARE IN ACCORDANCE WITH THE BEST QUALITYSTANDARDS OF EACH RESPECTIVE TRADE WHETHER SPECIFIED OR NOT. THEGENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK IS IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL BUILDING CODES AND STANDARDS FOR GENERAL MECHANICAL AND ELECTRICAL CONSTRUCTION. 2. CONTRACTOR SITE VISIT$: CONTRACTOR $ SHALL VISIT THE WORK SITE PRIOR TO COMMENCEMENT. THE DRAWINGS CONTAINED HEREIN MAY NOT BE ALL INCLUSIVE OF EXISTING CONDITIONS OR NEW WORK REQUIREMENTS, CONTRACTORS) SHALL MAKE THEMSELVES FAMILIAR WITH THE WORK SITE IN THE FIELD IN ORDER TO BE FULLY AWARE OF THE REQUIREMENTS OF THE SCOPE OF WORK. 3. CONTRACTOR FIELD VERIFICATION: FIELD VERIFY ALL DIMENSIONS AND MEASUREMENTS. INFORM THE GENERAL CONTRACTOR BEFORE BEGINNING ANY CONSTRUCTION IF EXISTING CONDITIONS PREVENT OBTAINING RESULTS AS SHOWN OR SPECIFIED, DO NOT SCALE DRAWINGS. NOTED DIMENSIONS TAKE PRECEDENCE. VERIFY EXISTING CONDITIONS INDICATED ON THE DRAWINGS AND REPORT ANY DISCREPANCY THROUGH THE GENERAL CONTRACTOR TO SCHOLL DESIGN, INC. 4. GENERAL CONTRACTOR COORDINATION WITH OWNER: THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING ALL ONSITEACTIVITIES; SUCH A5, BUT NOT LIMITED TO, WORK SCHEDULE, MATERIALS STORAGE AND HANDLING, DELIVERIES, ACCESS TO THE WORKS TE, TRAFFIC CONTROL, AND BUILDING/PUBLIC SAFETY PROCEDURES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO COORDINATE WORK BYOTHERS WITH HIS/HER OWN ACTIVITIES AS NECESSARY TO EXECUTE THE OVERALL PROJECT SCOPE. THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAYBE WORKED PRIOR TO AND DURING HOLIDAYS. LANDLORD RESERVES THE RIGHT TO RESTRICT CONSTRUCTION TO NIGHTS AND WEEKENDS WHEN THAT CONSTRUCTION IS DEEMED TO INTERFERE WITH THE OPERATIONS OF ADJACENT TENANTS. 5. PROJECT MATERIAL LEAD TIMES: FOR THOSE ITEMS TO BE ORDERED REQUIRING LEAD TIME, THE CONTRACTOR SHALL COORDINATE THE PROJECT SCHEDULE ACCORDINGLY AND COMMUNICATE TO THE OWNER, TENANT, AND SCHOTT DESIGN WHEN DECISIONS MUST BE RENDERED IN ORDER FOR THE CONTRACTOR TO MEET THE PROJECT SCHEDULE. THE OWNER, TENANT, OR DESIGNER/ARCHITECT IS NOT RESPONSIBLE FOR DELAYS RESULTING FROM THE CONTRACTOR'S FAILURE TO COMMUNICATE MATERIAL LEAD TIMES. 6. MATERIAL SUBSTITUTIONS:$UBSTITUTIONS FOR SPECIFICALLY NAMED PRODUCTS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE DESIGNER. SUBMIT REQUESTS FOR SUBSTITUTIONS WITH APPROPRIATE SUPPORT INFORMATION TO THE DESIGNER, ALLOW REASONABLY SUFFICIENT TIME FOR THE DESIGNER TO REVIEW THE REQUEST AND RENDER A DECISION. 7. SAFE WORK AREA: SCHOLL DESIGN, INC., SHALL NOT HAVE CONTROL OVER, OR BE IN CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR A CONTRACTOR'S CONSTRUCTION MEANS, METHODS, SCHEDULES, SEQUENCES, OR SAFETY. THE CONTRACTORS SHALL BE RESPONSIBLE FOR MAINTAINING A SAFE ENVIRONMENT FOR WORKERS AND THE PUBLIC AT ALL TIMES. B. GENERAL CONTRACTOR CLEANUP PROCEDURES: THE GENERAL CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD CLEANUP PROCEDURES AND GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN ORDER TO CONDUCT BUSINESS IN A SAFE AND CLEAN ENVIRONMENT. 9. STAGING/ PARKING/ DUMPSTERS/ RESTROOMS: THE GENERAL CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND PARKING CONSTRUCTION AND DELIVERY VEHICLES. THE USE OF EXISTING REST ROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS. 10. DUST CONTROL: THE GENERAL CONTRACTOR SHALL USE DUST PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS SHALL BE CONSTRUCTED OF 2X4 WOOD STUDS ® 24"O.C., INSULATION AND 6 MIL VAPOR BARRIER ON EACH SIDE. 11. PROJECT INSTALLATION CONFLICTS: CONTACT THE DESIGNER IMMEDIATELY IF, IN THE FIELD, CONFLICTS ARE DISCOVERED BETWEEN COMPONENTS OF DIFFERENT SYSTEMS THAT PREVENT THE INSTALLATION OF THOSE COMPONENTS AS INDICATED ON THE DRAWINGS. T.E. WHERE EXISTING MECHANICAL DUCTWORK MAY PREVENT THE INSTALLATION OF LIGHTING FIXTURES AS INDICATED ON THE CEILING PLAN). 12, SCHOTT DESIGN HAZARDOUS MATERIALS WAIVER: SCHOLL DESIGN, INC., IS NOT RESPONSIBLE FOR THE IDENTIFICATION, DISCOVERY, PRESENCE, HANDLING, REMOVAL, DISPOSAL OF, OR EXPOSURE TO ANY PERSONS, THAT OF HAZARDOUS MATERIALS IN ANY FORM ON THE PROJECTSITE. 13. WOOD BLOCKING IN WALLS: PROVIDE FIRE -TREATED WOOD BLOCKING IN WALLS FOR ALL WALL HUNG ITEMS INCLUDING MILLWORK, WALL STOPS, CABINETRY, ETC. 14. SHOP DRAWINGS: SHOP DRAWINGS OR CATALOG CUTS MUST BE SUBMITTED TO SCHOTT DESIGN, INC. FOR APPROVAL ON ALL MATERIALS OR ITEMS WHERE THE CONTRACTOR CHOOSES TO DEVIATE FROM WHAT IS SHOWN ON THE DRAWINGS, OR IF THE DRAWINGS DO NOT INDICATE A SPECIFIC MANUFACTURER OR MODEL NUMBER. EXPEDITE PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW SUFFICIENTTIME FOR CHECKING, APPROVAL, ORDERING, FABRICATION, AND DELIVERY OF MATERIALS AND EQUIPMENT. 15. PROJECT APPROVALS: ALL DETAILS, MATERIALS, AND INSTALLATIONS ARE SUBJECT TO FIRST APPROVAL BYSCHOTT DESIGN, INC., AND FINAL APPROVAL BYTHE OWNER. 16. CHANGE ORDERS: REVIEW AND COORDINATE ALL NEW WORK AND EXISTING CONDITIONS WITH ALL OTHER TRADES. FIELDWORK ORDERS & CHANGE ORDERS WILL NOT BE APPROVED FOR ANY CONDITIONS OR CONFLICTS THAT COULD HAVE BEEN ACCOUNTED FOR BY THE BIDDER DURING PREBIDFIELD INSPECTION AND AFTER AWARD OF CONTRACT. RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and meal Codes City of Camel �VII��V `0*�41WMt_ DATE: \\ 10/16/19 17. FURNITURE AND EQUIPMENT EXCLUSIONS: FURNITURE, OFFICE EQUIPMENT OFFICE PARTITION SYSTEMS, REFRIGERATORS, VENDING MACHINES, AND OTHER SIMILAR ITEMS SHOWN DASHED ON THIS DRAWING AND NOT ATTACHED TO THE BUILDING ARE FOR REFERENCE ONLY AND ARE NOT TO BE PROVIDED AS PART OF THE WORK UNLESS SPECIFICALLY STATED TO BE PROVIDED. 18. WALL PATCHING: PATCH ALL GYPSUM WALLBOARD AT AREAS OF ELECTRICAL, DATA AND SWITCH DEVICES BEING REMOVED. PATCH HOLE WITH DRYWALL TAPE SPACKLE AND PREPARE FOR FINISH. 19. CONSTRUCTION CLEANING: EXECUTE A THOROUGH FINAL CLEAN AND INSPECTION OF THE SPACE UPON COMPLETION OF THE PROJECT. ALL SURFACES, FIXTURES, AND EQUIPMENT SHALL BE CLEAN, AND THE SPACE SHALL BE TURNED OVER TO THE OWNER IN A CONDITION THAT REPRESENTS THE HIGHEST LEVEL OF CARE AND PROFESSIONALISM. ENSURE ALL GENERAL CONTRACTOR INSTALLED APPLIANCE S WORK & DO NOT LEAK. 20. O & M MATERIALS: PROVIDE TO THE OWNER ALL OPERATION AND/OR MAINTENANCE MANUALS, OR INSTRUCTIONS FOR ALL EQUIPMENT AND SYSTEMS AT THE COMPLETION OF THE PROJECT. 21. PLAN DIMENSIONS: ALL PLAN DIMENSIONS ARE FROM FACE OF EXISTING FINISH TO FACE OF NEW GYPSUM BOARD WALL, OR FACE TO FACE OF NEW GYPSUM BOARD WALL. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS GOVERN, 22. WINDOW BLINDS: CONTRACTOR TO PROVIDE AN ALLOWANCE FOR CLEANING EXISTING WINDOW BLINDS. REPLACE ANY DAMAGED OR MISSI NG WINDOW BLINDS WITH NEW TO MATCH BUILDING STANDARD. 23. PERMITTING: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE REQUIREMENTS REGARDING LOCAL PLAN REVIEW, PERMITS, INSPECTIONS, AND FEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SUBMITTING ALL REQUIRED DRAWINGS AND SUPPORTING DOCUMENTS TO THE LOCAL BUILDING OFFICIAL AND/OR PERMIT DEPARTMENT. ALL REQUIRED LOCAL PERMIT FEES SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS STIPULATED OTHERWISE IN THE OWNER/CONTRACTOR AGREEMENT. 24. FIRE SEALING: FIRE SEAL ALL PENETRATIONS THROUGH RATED WALLS, FLOORS, AND CEILINGS WITH APPROVED FIRE -RATED CAULK AS DIRECTED BY LOCAL JURISDICTIONS. CONTRACTOR TO BE AWARE THAT EXISTING CONDITIONS ARE NOT NECESSARILY AN INDICATOR OF BUILDING TYPE. BUILDING TYPE LISTED ON LI00 IS BASED UPON AVAILABLE INFORMATION AND FIELD VERIFICATION. 25, WALL PENETRATIONS: WHERE STRUCTURAL BEAMS, DUCTWORK, ETC. PENETRATE SOUND OR FIRE RATED PARTITIONS, GYPSUM WALLBOARD WALL TO BE SCRIBED TO FITTIGHT, CAULKED AND FIRE DAMPERED IF REQUIRED. 26, FLOOR LEVELING: CONTRACTOR TO ALLOW FOR UN LEVEL FLOOR CONDITIONS. ALL EXISTING FLOOR AND WALL SUBSTRATES SHALL BE LEVELED AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES. ADJUST DOORS AND FRAMES AS REQUIRED. 27. REPAIR GYPSUM WALLBOARD: WHERE DEMOLITION HAS OCCURRED AT REMAINING WALLS, REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS. 28. EQUIPMENT INSTALLATION: ALL EQUIPMENT AND/OR FIXTURES SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR INSTRUCTIONS. FINISH NOTES 1. STATE BUILDING COMPLIANCE FOR FINISHES: ALL FINISHES SHALL COMPLY WITHCHAPTER8 (INTERIOR FINISHES) OF THE INDIANA BUILDING CODE FOR CLASS A FIRE RATINGS. 2. GYPSUM ASSOCIATION CONFORMITY: FOR ALL NEW DRYWALL NSTALLATIONS, INSTALL AS RECOMMENDED BY THE GYPSUM ASSOCIATION. (SUCH AS, CONTROL JOINTS, FINISH LEVELS, FASTENERS, TAPING DETAILS, CORNER BEADS, ETC.) PROVIDE NEW CEMENT BACKER BOARD AS A SUBSTRATE FOR NEW WALL TILE PER MANUFACTURER'S RECOMMENDATIONS 3. COVER PLATES: REFERENCE REFLECTED CEILING PLAN AND ELECTRICAL PLAN FOR COLOR OF ELECTRICAL AND DATA DEVICES AND PLATES. REMOVE ALL PLATES BEFORE PAINTING AND REATTACHED AFTERWARDS. CONTRACTOR TO CONFIRM DESIRED COLOR PRIOR TO PURCHASING NEW, 4. PAINTING: ALL AREAS RECEIVING PAINT ARE TO RECEIVE PRIMER COAT AND TWO (2) FINISH COATS. 5. FLOORING TRANSITION STRIPS: FOR CHANGE IN FLOOR FINISH MATERIAL, PROVIDE TRANSITION STRIP AT DOOR OPENINGS AS NOTED ON FINISH PLAN UNLESS NOTED OTHERWISE (I.E. WHERE VCT MEETS CARPET). 6. DELIVERY OF COMPREHENSIVE WORK PRODUCT: WHERE LIMITS OF WORK ARE SHOWN, OTHER INCIDENTAL WORK LIKE PAINTING WHERE NEW OUTLETS HAVE BEEN INSTALLED, IS CONSIDERED PART OF THE SCOPE OF WORK. PROVIDE A COMPLETE AND FINISHED PRODUCT READY FOR TENANT AND BUILDING OWNER. 7. WALL DEMOLITION: REFINISH SURFACES TO MATCH EXISTING WHERE DEMOLITION HAS OCCURRED, REPAIR GYPSUM WALLBOARD WHERE DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS. 8. TELEPHONE BOARDS: WHERE PHONE BOARD IS PROVIDED, PAINT BOARD WITH FIRE RETARDANT PAI NT TO MATCH ADJACENT WALL FINISH. 9. MILLWORK SAMPLES: SUBMIT FINISH SAMPLE OF MILLWORK (STAINED OR PAINTED AS SPECIFIED) TO SCHOTT DESIGN FOR REVIEW AND APPROVAL PRIOR TO THE FINISHING PROCESS OF ALL MILLWORK. 10. INTERIOR ELEVATION DETAILS: REFERENCE INTERIOR ELEVATION & SECTIONS WHERE PROVIDED FOR ADDITIONAL FINISH INFORMATION. 11. PAINT L ADHESIVE VOC'S: ALL PAINTS AND ADHESIVES/SEALANTS SHALL HAVE ZERO VOC CONTENT. 12. ADHESIVE MANUFACTURER RECOMMENDATIONS: ALL ADHESIVES/SEALANTS TO BE USED AS RECOMMENDED BY PRODUCT MANUFACTURER. MECHANICAL & ELECTRICAL NOTES DECONSTRUCTION NOTES I. DESIGN/BUILD MEP: THE MECHANICAL, ELECTRICAL AND PLUMBING 19. FIRE ALARM DEVICE LOCATIONS: COORDINATE WITH THE 1. DECONSTRUCTION DEFINITION: CAREFULLY DISMANTLE SPACES WITH SCOPES OF WORK ARE LIMITED TO BASIC DESIGN -BUILD ALTERATIONS TENANT PRIORTOLOCATIONS INSTALLATION OF FIRE DETECTION DEVICES THE GOAL OF MAXIMIZING THE REUSE POTENTIAL OF ITS COMPONENTS. WHIOWNER NEDI NTHESE PHA NS. THEDES IGN-BUILD AVOID CONFLICT WITH FEATURE FOR EACH TRUTH( FOREACHMUSTNOTIFYTHE THEY FINDTHAT IND THARTHE ROOMS WALLS( ONFER LACEROMSANDREC 2. CYCLING END AL CONTRACTORPONSIBLEMATERIAL FOR HE LEVEL OHITECT MECHF SCOPE OF WORK EXCEEDS THE LEVEL OF MECHANICAL, ELECTRICAL OR NICAL, PRESENTATION BOARDS, ARV EQUIPMENT TENANT-INSTALLED ITEMS AR E TENANT -INSTALLED ITEM$ LINGANY PROJECT RECYCLING ANY AND ALL POSSIBLE PROJECT MATERIAL WASTE AND RECYCLING PLUMBING INDICATEDONTHESE DRAWINGS ANY NS) AND PROJECTION SCREENS). COORDINATING HAULING CONTAINERS WITH THE ENGINEERINGORK IOTHAT NECESSARY ENGINEERING CAN OCCUR AND ADDITIONAL PLANS CAN BE WASTE R. SUB-CONTRACTTE OR. WASTE MANAGEMENT SUB -CONTRACTOR. REFER TO FILED, OR IF ADDITIONAL INFORMATION IS NEEDED IN ORDER TO DO THE 20.VIDE NGLIGHTFIXTURE IF REQUIRED, AND NECESSARY, DECONSTRUCTION DI I I SHEET FOR SPECIFIC INSTRUCTIONS. WORK IN THE FIELD. THE MECHANICAL, ELECTRICAL AND PLUMBING IS LAMP: PROVIDE NEW BALLASTS AND LAMPS IN ALL LIGHTS IN EXISTING SPACES. DESIGN -BUILD CAL TRACTORS SHALL COMPLY WITH ALL APPLICABLE CONSULT WITH LANDLORD. ELEMENTSOFBUILDING: NO STRUCTURAL OR EXISTINGLOAD-BEARING STATE AND LOCAL BUILDING CODES. L CONSTRUCTION LOAD -BEARING CONSTRUCTION SHALL BE REMOVED, DEMOLISHED, OR CTIO REMOVED, FIRE SUPPRESSION AN D FI RE ALARM SYSTEMS SHALL BE INSTALLED BY THE 21. HVAC R BALANCE: PERFORM AIR DAMAGED AS A RESULT OF THIS PROJECT UNLESS SPECIFICALLY NOTED APPROPRIATE DESIGN -BUILD CONTRACTOR AND MUST COMPLY WITH ALL BALANCE UPON COMPLETION OF HVAC SCOPE PROVIDE REPORT TO UPON COMPLETITOR ON SCOPE. PROVIDE OTHERWISE ON THE DRAWINGS. PROTECT ALL EXISTING STRUCTURAL APPLICABLE STATE AND LOCAL BUILDING CODES. FIRE SUPPRESSION LANDLORD. MEMBERS DURING DEMOLITION/CONSTRUCTION. THE CONTRACTOR AND FIRE ALARM DESIGN -BUILD CONTRACTORS ARE RESPONSIBLE FOR SHALL VERIFY IN THE FIELD, PRIOR i0 DEMOLITION, THAT ALL ITEMS COMPLETING AND FILI NG THEIR PLANS AND OBTAIN ING THEIR PERMITS. 22. HVAC FLEX DUCT: FLEX DUCT MUST MEET ASHRAE STANDARD NOTED TO BE DEMOLISHED ARE NOT STRUCTURAL. CONTACT SCHOLL BUILDING CODES FOR FLEX DUCT LENGTH. NOMORETHAN3FEETOF DESIGN IMMEDIATELY IF THE CONTRACTORS) IN THE FIELD SUSPECT 2. DESIGN/BUILD HVAC: MECHANICAL WORK IS LIMITED TOA FLEXIBLE DUCT IS TO BE INSTALLED PER BUILDING STANDARDS. INSTALL THAT AN ITEM NOTED FOR DEMOLITION APPEARS TO BE STRUCTURAL OR DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. NO NEW FLEX DUCT AS STRAIGHT AS POSSIBLE. IN NO CASE SHALL OFFSETS EXCEED OTHERWISE LOAD -BEARING. BEWARE OF STRUCTURAL COLUMNS MAIN MECHANICAL APPLIANCES OR MAIN EQUIPMENTARE BEING A 45o RADIUS AND IN NO CASE SHALL A SINGLE RUN OF FLEX DUCT AND/OR BEAMS THAT MAY BE CONCEALED BEHIND FINISHES THAT ARE PROVIDED. ALL MECHANICAL WORK IS LIMITED TO RELOCATION OF EXCEED (2) 450 OFFSETS. NOTED FOR REMOVAL. EXERCISE CAUTION WHEN DEMOLISHING DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD BUILDING FINISHES OR PARTITIONS ADJACENT TO OR AROUND DUCTWORK OR EQUIPMENT IS BEING ADDED; MECHANICAL 23. ELECTRICAL CIRCUITS: AREAS WITHIN ELECTRICAL SCOPE MUST BE STRUCTURAL MEMBERS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONTRACTOR 15 TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS POWERED BY THE ELECTRICAL PANEL FROM THE FLOOR ON WHICH INADVERTENT DAMAGE TO THE BUILDING STRUCTURAL SYSTEM. REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY CONSTRUCTION OCCURS. WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE 4. EQUIPMENT,FIXTURE, FINISH REUSE: WHERE EQUIPMENT, FIXTURES, CODES. 24. SUPPLEMENTAL HVAC/ELECTRICAL: IN THE EVENTTHAT ANY OR FINISHES ARE MOVED FROM ANY OTHER PART OF THE BUILDING TO HVAC EQUIPMENT OR ABOVE BUILDING STANDARD BE REUSED I N THE PROJECT AREA, THE CONTRACTOR SHALL INCLUDE IN 3.SUPPLEMENTAL EQUIPMENT LOADS: VERIFVHEIDE SPECIALIR ELECTRICAL POWER FACILITIES ARE INSTALLED (SUCH AS IN AN IT SERVER THEIR SCOPE OF WORK ANY NECESSARY PATCHING OR REPAIRING OF AND PR OM DNA FLOW IN THE TENANT AIR FLOW IF REQUIRED. ADDITIONAL AL A ROOM( CONTRACTOR SHOULD FURNISH AND INSTALL ADDITIONAL THE REMAINING AREAS FROM WHERE THE ITEMS WERE RELOCATED, WITSPACE OWNER PRIOR TO ANY PURCHASE CONFIRM PURCHASE EQUIPMENT. ELECTRICAL AN D BTU SUB -METERING SO AS TO ENABLE OWNER TO UNLESS OTHERWISE DIRECTED BY OWNER, VISE ZO LNG SINGLE OFFICE REVISE ZONING RED. DO NOT DESIGNANYYB MONITOR TENANT'S UTILITY CONSUMPTION (IN RELATION TO THE SUBJECT BUI SPLIT E UNLESS BUILDING MAKE AND5. MODELOFDOORS DECONSTRUCTION PLANS: REMOVE ALL EXISTING WALLS AND OWNSPACE /TANDL RD. CONTRACTOR ENSURE THAT HVAC ZONES OWNER LORD,CRI TELY ENSURETLITS CONTRACTORS METERS SHOULD BE REVIEWED AND CONTRACTOR'SWNERPIOR WHERE INDICATED BY NOTE, SYMBOL, OR DASHED LINES. NOTE N ES ARE DAPPROPRIATELY SUCH THAT NO SPLITZONESAREIN AREECESLOCATEDSUCH T ATED TO CONTRACTOR APPROVED BY OWNER PRIOR TO CONTRACTORINSTALLATION. THAT SOME ITEMS HAVE NOT BEEN SHOWN ON DECONSTRUCTION OFFICES OR CONFERENCE ROOMS. OR PLAN. VISIT AREA OF WORK TO ASSURE EXTENT OF DECONSTRUCTION. 25. ENGINEERED MEP DRAWINGS: WHEN REQUIRED BY STATE BUILDING 4. RELOCATE AIR -SUPPLY DIFFUSERS AND CODETHE PROVIDE DE SIGN/BUILD DRAWINGS 6. FIELD VERIFICATION OF EXISTING CONDITIONS: REMOVE ALL RETURNAIRRGRI AIR FOR URN AIR GRILLELOCATI REQUIRED. LAICAL, LUMBI G,ESHALL FOR MECHANICAL, PLUMBING, ELECTRICAL, OR FIRE SUPPRESSION. CARPET, VINYL BASE,VCT, WALL FABRIC, AND ANV OTHER FINISHES AS RETURN AIR FR MRETU N AIR GRILLES. CONTRSUPPLY DIFFUSERS AND RETURN AIR FROM RETURN AIR GRILLES. CONTRACTOR IS DRAWINGS SHALL BE CERTIFIED BVA LICENSED ENGINEER AND SUBMITTED REQUIRED FOR NEW CONSTRUCTION. CONTRACTOR TO FIELD VERIFY TO PLACE LOCATION OF DIFFUSERS AND RETURN AIR GRILLES AS BY THE CONTRACTOR FOR STATE DESIGN REVIEW. EXISTING CONDITIONS. REFER TO FINISH PLAN/SCHEDULE FOR REQUIRED BY CODE, CLARIFICATION OF EXISTING FINISHES TO REMAIN, 26, EQUIPMENT INSTALLATIONS: ALL EQUIPMENT AND/OR FIXTURES SHALL 5. HVAC THERMOSTAT LOCATIONS: POSITION LOCATION OF ALL BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S 7 PROTECTION OF BUILDING ELEMENTS 70 REMAIN: USE CARE TO 7. PROTECTIOOTECT N THERMOSTATS WHERE APPROPRIATE PER MECHANICAL DESIGN. RECOMMENDATIONS OR INSTRUCTIONS. BUILDING ELEMENTS NDIREMAI:USECACATED ON THE RAWINGS COORDINATE WITH TENANT AND BUILDING OWNER FOR FURNITURE TO REMAIN SUCH AS, BUT NOT LIMITED TO, EXISTING CEILING GRID, PANEL OR OTHER CONFLICTS. Z7. BUILDING DIRECTORY: ION TILES, FIRE SUPPRESSION EQUIPMENT, DIFFUSERS, LIGHT FIXTURES, IN FORMATIOPHICN EUPDHE UPDATED WITH NEW AND PROGRAMMING TO BE UPDATED WITH NEW TENANT'S INFORMATION EQUIPMENT, CASEWORK, AND FINISHES. THE CONTRACTOR SHALL 6. DESIGN/BUILD ELECTRICAL: ELECTRICAL WORK IS LIMITED iOA FOR FUTURE USE. REPLACE AND/OR REPAIR, AT THE CONTRACTOR'S COST, ANY SUCH DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS, ALL ELEMENTS DAMAGED DURING CONSTRUCTION THAT COULD HAVE ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF 28. ELECTRICAL PANELS: ALL ELECTRICAL PANELS TO GET UPDATED OTHERWISE BEEN REASONABLY PROTECTED AND MAINTAINED IN ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE CIRCUIT SCHEDULES. GOOD CONDITION FOR THE OWNER'S USE IN THE PROJECT. CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING. ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE FIRE PROTECTION NOTES 8. REMOVAL OF ABANDONED CABLING& WIRING: PER THE INDIANA ELECTRICAL CODE (SPREAD OF FIRE OR PRODUCTS OF COMBUSTION) FILED AND MUST COMPLY WITH ALL APPLICABLE CODES. REMOVE ALL ACCESSIBLE PORTIONS OF ABANDONED CABLES AND WIRING INCLUDING BUT NOT LIMITED TO: DATA WIRING, 7. ELECTRICAL CODE COMPLIANCE: COMPLY WITH THE INDIANA I. FIRE EXTINGUISHERS: CONTRACTOR TO ENS NEW AND COMMUNICATIONS WIRING, FIRE ALARM CABLES, AUDIO CABLES, ELECTRICAL AND MECHANICAL CODE AND ALL OTHER APPLICABLE EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA 10. COAXIAL CABLES, FIBER OPTIC CABLES/RACEWAYS, AND PLTC CABLES. CODES. COORDINATE WITH OWNER/LANDLORD ON EXTINGUISHER TYPE AND REFER TO SECTION 300.21. ANY SUCH CABLE OR WIRING SHOULD BE HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINTTO PULLED AND REMOVED BACK TO THEIR MAIN SOURCES ON THE FLOOR 8. ELECTRICAL CIRCUITING: SIZE AND CIRCUIT ELECTRICAL POWER ITEMS. A VISIBLE EXTINGUISHER. (I.E. ELECTRICAL PANELS, PHONE BOARDS, ETC.) PROVIDE OR REUSE ELECTRICAL POWER AND DATA OUTLETS AS REQUIRED. THE FOLLOWING NOTES APPLY ONLY IN EXISTING SPRINKLERED FACILITIES. 9. PROTECTION OF ABANDONED/TERMINATED BUILDING SYSTEM ELEMENTS: WHERE FIXTURES OR EQUIPMENT ARE REMOVED FROM ANY 9. GPI OUTLETS: ALL ELECTRICAL OUTLETS WITHIN 6-0"OFWATERARETO 2. DESIGN BUILD FIRE PROTECTION SYSTEM: FIRE PROTECTION WORK IS ELECTRICAL, PLUMBING, MECHANICAL, OR VOICE/DATA SYSTEMS, ALL BE G.F.C.I. TO BE PROVIDED BYD DESIGN/BUILD SERVICES UNDER DERTEC GENERAL REMAINING TERMINATIONS SHALL BE CLOSED AND PROTECTED IN CONTRACT. PROVIDE A COMPLETE, WORKING SYSTEM. SCHOTT STRICT ACCORDANCE WITH INDUSTRY STANDARDS AND GOVERNING 10. PHONE AND DATA ACCOMMODATIONS: AT EACH PHONE AND DATA DESIGN, INC., IS NOT RESPONSIBLE FOR THE DESIGN, INSTALLATION, OR SAFETY REGULATIONS OR PROCEDURES. MARK, LABEL, OR FLAG ALL JACK, PROVIDE PULL STRING FROM ABOVE CEILING TO BOX. TENANTS RENOVATION OF THE FIRE SPRINKLER SYSTEM. TERMINATED SYSTEMS FOR FUTURE REFERENCE. CONTRACTOR i0 DATA CONTRACTOR IS RESPONSIBLE FOR PULLING CONDUCTORS AND PROVIDE AN "AS -BUILT' SET INDICATING THE LOCATION OF ALL PROVIDING APPROPRIATE TERMINALS AT FACE PLATE. 3. FIRE PROTECTION SYSTEM CODE COMPLIANCE: THE DESIGN/BUILD PERMANENTLY ABANDONED SYSTEMS. CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE, THE 11. ELECTRICAL SWITCH PLATES: PROVIDE COLORED FACEPLATES FOR INDIANA FIRE CODE, AND ALL OTHER APPLICABLE LAWS, CODES, RULES 10. HAZARDOUS MATERIALS: GENERAL CONTRACTOR IS RESPONSIBLE ELECTRICAL OUTLETS& SWITCH PLATES TO MATCH EXISTING, UNLESS AN D REGULATIONS THAT APPLY TO DESIGN AND INSTALLATION OF FIRE FOR IDENTIFYING ANY AND ALL ITEMS THAT MAY CONTAIN HAZARDOUS OTHERWISE NOTED, ELECTRICIAN TO FIELD VERIFY PRIOR TOPURCHASE. SPRINKLER/FIRE SUPPRESSION SYSTEMS. OR HARMFUL MATERIALS. ALL IDENTIFIED ITEMS MUST BE PROPERLY DISPOSED OF PER EPA AND INDIANA DEPARTMENT OF ENVIRONMENTAL 12. WORK STATION POWER: PROVIDE JUNCTION BOXES OR POWER POLES 4. FIRE PROTECTION DESIGN DRAWINGS: THE FIRE PROTECTION MANAGEMENT RULES AND REGULATIONS. AT WORKSTATIONS WHERE SHOWN. REFER TO THE PLAN FOR THE CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL APPROPRIATE DESIGNATIONS. DATA WILL BE RUN BY THE TENANT'S DATA FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND VENDOR. ELECTRICIAN TO MAKE FINAL CONNECTION FROM LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT. WORKSTATION WHIP TO JUNCTION BOX. THE FURNITURE VENDOR IS TO BE RESPONSIBLE FOR WIRING THE BASE PANELS OF THE WORKSTATIONS. 5. SPRINKLER HEADS: PROVIDE NEW OR RELOCATE EXISTING SPRINKLER CONTRACTOR TO COORDINATE WITH TENANT ON WORKSTATION HEADS AS REQUIRED. PROVIDE MISSING COVER/ESCUTCHEON PLATES FURNITURE SPECIFICATIONS TO OBTAIN CIRCUITRY REQUIREMENTS PRIOR FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING TO RUNNING ELECTRICAL CONDUITS TO JUNCTION BOXES. CONDITIONS PRIOR TO THE START OF WORK. 13. LIGHTING CIRCUITS: VERIFY EXISTING LIGHTING CIRCUITING. SIZE NEW EFFECTIVE CODES CIRCUITS AS REQUIRED. PROVIDE NEW OR REVISE EXISTING CIRCUITING FOR NEW LAYOUT OF LIGHT FIXTURES. - GEN ERAL ADMINISTRATIVE RULES (6751AC 12) 14. ELECTRICAL OUTLETS: ENSURE THAT ALL MOUNTING HEIGHTS OF - INDIANA BUILDING CODE, 2014 EDITION (IBC, 2012 EDITION, 6751AC ELECTRICAL DEVICES MEETA.D.A. REQUIREMENTS. 13-2.6) - HANDICAPPED ACCESSIBILITY CODE: 2014 INDIANA BUILDING CODE 15. LIGHTING SWITCH PLATES: WHERE MULTIPLE SWITCHES ARE SHOWN, CHAPTER II, ANSI A117.1-2009, 6751AC 13-2.6-12) PROVIDE(() GANG BOX WITH A SINGLE COVERPLATE. - IN DIANA FI RE CODE, 2014 EDITION(IFC 2012 EDITION, 6751AC 22-2.5) - INDIANA PLUMBING CODE, 2006 EDITION (6751AC I6-1.4) 16. LIGHT FIXTURE PLACEMENT: CENTER CEILING ELEMENTS IN CEILING - INDIANA ELECTRICAL CODE, 2009 EDITION (2008 NFPA 70, 6751AC TILES, INCLUDING RECESSED DOWNLIGHTS, SMOKE DETECTORS, 17-1.8) SPRINKLER HEADS, AND EXIT SIGNS UNLESS OTHERWISE NOTED. - INDIANA MECHANICAL CODE, 2014 EDITION (IMC, 2012 EDITION, 675 IAC 18-L6) 17. EMERGENCY LIGHTING: PROVIDE EMERGENCY LIGHTING IN TENANT - ENERGY CONSERVATION CODE, 2010 (ASHREA 90.1, 2007 EDITION, SPACEAS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS 6751AC 19.3) OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE REQUIREDN THESPACE OR MORE. FIXTURES SHOWN ON PLAN ARE FOR REFERENCE ONLY. FOR REFERENCEONLY. DOCUMENT APPROVAL 18. FIRE ALARM SYSTEM: PROVIDE ALARM NOTIFICATION APPLIANCES SPEAKERS, SMOKE DETECTORS, FIRE TENANT/CLIENT, UPON SIGNATURE, APPROVES ALL ASPECTS OF THE SCOPE OF WORK CONTAINED IN PULLS, AND ANY PULLS, AND YO OTHER REQUIRED SYSTEMS ERREQUIRABLECO EDETECTIONONALBUIL NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING TO MEET THESE DOCUMENTS. CODE, INTERNATIONAL FIRE CODE, NFPA). IN RECEPTION AREAS, CONFERENCE ROOMS AND OTHER HIGH PROFILEAREAS WITHIN SUITE, ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BYSDI OR TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT IN CONTRACTOR RELOCATINGTHESE ITEMS ATTHEIR EXPENSE. TENANT/CLIENT COMPANY NAME ITgJiltl�Ng97�iTa1G\IL7i.9RPJdED 7i1gJc\J�3g93sjga/_\I\Li971�alIgwPJcn4 ALL COSTS INCURRED DUE TO ANY CHANGES REQUESTED AFTER SIGN -OFF OF THESE DOCUMENTS SHALL BE THE FULL RESPONSIBILITY OF THE TENANT/CLIENT. THESE DRAWINGS, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOTTO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN. MILL/CASEWORK NOTES I. CASEWORK/MILLORK: CASEWORK AND MILLWORK GENERALLY INDICATED ON THESE DRAWINGS ARE TO BE PROVIDED UNDER THE GENERAL CONTRACT. 2. AWI COMPLIANCE: UNLESS INDICATED OTHERWISE, COMPLY WITH ARCHITECTURAL WOODWORK INSTITUTE (A.W.I.) CURRENT STANDARDS FOR CUSTOM GRADE WOODWORK. 3. MILLWORK SHOP DRAWINGS: FURNISH SHOP DRAWINGS ON ALL MILLWORK AND CASEWORK FOR APPROVAL BY THE TENANT AND SCHOTT DESIGN PRIOR TO FABRICATION. 4. MILLWORK FIELD VERIFICATION: WHERE CASEWORK AND MILLWORK ARE TO BE INSTALLED, VERIFY ALL DIMENSIONS ON PLANS AGAINST DIMENSIONS OF AS -BUILT CONDITIONS INFIELD. REPORT ANY DISCREPANCIES TO SCHOLL DESIGN THROUGH THE GENERAL CONTRACTOR, MAKE ADJUSTMENTS TO CASEWORK AND MILLWORK TO FIT FIELD CONDITIONS UNLESS DOING SO WILL SIGNIFICANTLY ALTER THE INTENT OF THE DESIGN SHOWN ON THE DRAWINGS. 5. DRAWING REVIEW AND DISCREPANCIES: VERIFY FINISHES (LAMINATE, VENEER, STAINS, ETC.( ON THE SECTIONS AND ELEVATION DRAWINGS WITH FINISHES INDICATED ON THE FINISH PLAN/SCHEDULES. IMMEDIATELY REPORT ANY DISCREPANCIES TO SCHOTT DESIGN THROUGH THE GENERAL CONTRACTOR. 6. MILLWORK REQUIREMENTS: REFER TO MILLWORK SECTIONS& ELEVATIONS . UNLESS OTHERWISE SHOWN, PLASTIC LAMINATE CLAD, COUNTERTOPS WITH 4" BACKSPLASHES WHERE INDICATED. BACKSPLASHES TO BE FIELD APPLIED. REFER TO MILLWORK SECTIONS & ELEVATIONS FOR CABINETRY SPECIFICATIONS(CUSTOM PLASTIC LAMINATE OR PRE -MANUFACTURED STOCK CABINETRY(, EDGESOF PLASTIC LAMINATE COUNTERTOPS, CABINETS AND DRAWERS TO BE PLASTIC LAMINATE AND NOT PVC OR OTHER STOCK PLASTIC EDGING UNLESS NOTED OTHERWISE. 7. MILLWORK WALL BLOCKING: TO PROVIDE BLOCKING IN WALLS FOR ALL MILLWORK, WALL STOPS, HARDWARE, AND CABINETRY WHERE SPECIFIED. ALL WOOD BLOCKING TO BE FIRE RATED. GI ThE III 9 ne.�amnrw"o9 17 Inn � 9I ,.. H.I.nr jwln ,.,law 1ne m q9® aRiii t "l comn III um uvmmnv F "I IT ea .., .&I9 9U,Ti .F I , X �a VICINITY MAP NOT TO SCALE KEY PLAN - 3RD FLOOR N NOT TO SCALE INDEX OF DRAWINGS Till COVER SHEET AND GENERAL PROJECT NOTES L100 BFESAFETYPLAN Alit DECONSTRUCTION / ARCHITECTURAL FLOOR PLAN A121 REFLECTED CEILING PLAN / ELECTRICAL PLAN A211 DOOR SCHEDULE/ INTERIOR DETAILS/ FINISHPLAN THIS DRAWING, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN. ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART. WITHOUT THE WRITTEN CONSENT OF SCH07 DESIGN. Q LO M � W N ZH W=Dv ON Z V r RRRRmom W VJ 2CL Lu LJ OO O In CL Q �Z Q W Q Q Z DO N SSUE DATE I DESCRIPTION 08.07.19 REVIEW SET 08.12.19 PERMITSET 08.29.19 CONSTRUCTION SET REVISIONS MAR DATE DB DESCRIPTION PROJECT NUMBER 2019.127 PROJ.MGR DRAWN BY MS/SDH MS/AMM 3RD FLOOR COVER SHEET AND GENERAL NOTES T111