HomeMy WebLinkAboutGN001 General NotesGENERAL PROJECT NOTES
].BUILDING CODE COMPLIANCE: ALL WORK SHALL COMPLY WITH THE
REQUIREMENTS OF THE EXISTING BUILDING CONSTRUCTION TYPE AS
DEFINED BY SECTION 601 OF THE INDIANA BUILDING CODE. ALL WORK
SHALL COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE STATE AND
LOCAL BUILDING CODES. CONTRACTORS ARE RESPONSIBLE FOR
VERIFYING THE CURRENT APPLICABLE BUILDING CODES) FOR THEIR
RESPECTIVE SCOPE OF WORK. ENSURE THAT ALL MATERIALS AND LABOR
ARE IN ACCORDANCE WITH THE BEST QUALITYSTANDARDS OF EACH
RESPECTIVE TRADE WHETHER SPECIFIED OR NOT. THEGENERAL
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL WORK IS IN
ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL BUILDING
CODES AND STANDARDS FOR GENERAL MECHANICAL AND
ELECTRICAL CONSTRUCTION.
2. CONTRACTOR SITE VISIT$: CONTRACTOR $ SHALL VISIT THE WORK
SITE PRIOR TO COMMENCEMENT. THE DRAWINGS CONTAINED HEREIN
MAY NOT BE ALL INCLUSIVE OF EXISTING CONDITIONS OR NEW WORK
REQUIREMENTS, CONTRACTORS) SHALL MAKE THEMSELVES FAMILIAR
WITH THE WORK SITE IN THE FIELD IN ORDER TO BE FULLY AWARE OF THE
REQUIREMENTS OF THE SCOPE OF WORK.
3. CONTRACTOR FIELD VERIFICATION: FIELD VERIFY ALL DIMENSIONS
AND MEASUREMENTS. INFORM THE GENERAL CONTRACTOR BEFORE
BEGINNING ANY CONSTRUCTION IF EXISTING CONDITIONS PREVENT
OBTAINING RESULTS AS SHOWN OR SPECIFIED, DO NOT SCALE
DRAWINGS. NOTED DIMENSIONS TAKE PRECEDENCE. VERIFY EXISTING
CONDITIONS INDICATED ON THE DRAWINGS AND REPORT ANY
DISCREPANCY THROUGH THE GENERAL CONTRACTOR TO SCHOLL
DESIGN, INC.
4. GENERAL CONTRACTOR COORDINATION WITH OWNER: THE GENERAL
CONTRACTOR SHALL COORDINATE WITH THE OWNER REGARDING ALL
ONSITEACTIVITIES; SUCH A5, BUT NOT LIMITED TO, WORK SCHEDULE,
MATERIALS STORAGE AND HANDLING, DELIVERIES, ACCESS TO THE
WORKS TE, TRAFFIC CONTROL, AND BUILDING/PUBLIC SAFETY
PROCEDURES DURING CONSTRUCTION. THE CONTRACTOR SHALL ALSO
COORDINATE WORK BYOTHERS WITH HIS/HER OWN ACTIVITIES AS
NECESSARY TO EXECUTE THE OVERALL PROJECT SCOPE. THE GENERAL
CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, DAILY
WORKING HOURS, WEEKEND HOURS AND HOURS THAT MAYBE WORKED
PRIOR TO AND DURING HOLIDAYS. LANDLORD RESERVES THE RIGHT TO
RESTRICT CONSTRUCTION TO NIGHTS AND WEEKENDS WHEN THAT
CONSTRUCTION IS DEEMED TO INTERFERE WITH THE OPERATIONS OF
ADJACENT TENANTS.
5. PROJECT MATERIAL LEAD TIMES: FOR THOSE ITEMS TO BE ORDERED
REQUIRING LEAD TIME, THE CONTRACTOR SHALL COORDINATE THE
PROJECT SCHEDULE ACCORDINGLY AND COMMUNICATE TO THE
OWNER, TENANT, AND SCHOTT DESIGN WHEN DECISIONS MUST BE
RENDERED IN ORDER FOR THE CONTRACTOR TO MEET THE PROJECT
SCHEDULE. THE OWNER, TENANT, OR DESIGNER/ARCHITECT IS NOT
RESPONSIBLE FOR DELAYS RESULTING FROM THE CONTRACTOR'S
FAILURE TO COMMUNICATE MATERIAL LEAD TIMES.
6. MATERIAL SUBSTITUTIONS:$UBSTITUTIONS FOR SPECIFICALLY NAMED
PRODUCTS WILL NOT BE ALLOWED WITHOUT PRIOR APPROVAL FROM
THE DESIGNER. SUBMIT REQUESTS FOR SUBSTITUTIONS WITH APPROPRIATE
SUPPORT INFORMATION TO THE DESIGNER, ALLOW REASONABLY
SUFFICIENT TIME FOR THE DESIGNER TO REVIEW THE REQUEST AND
RENDER A DECISION.
7. SAFE WORK AREA: SCHOLL DESIGN, INC., SHALL NOT HAVE CONTROL
OVER, OR BE IN CHARGE OF, AND SHALL NOT BE RESPONSIBLE FOR A
CONTRACTOR'S CONSTRUCTION MEANS, METHODS, SCHEDULES,
SEQUENCES, OR SAFETY. THE CONTRACTORS SHALL BE RESPONSIBLE
FOR MAINTAINING A SAFE ENVIRONMENT FOR WORKERS AND THE
PUBLIC AT ALL TIMES.
B. GENERAL CONTRACTOR CLEANUP PROCEDURES: THE GENERAL
CONTRACTOR SHALL ESTABLISH WITH THE LANDLORD CLEANUP
PROCEDURES AND GUIDELINES TO BE FOLLOWED ON A DAILY BASIS IN
ORDER TO CONDUCT BUSINESS IN A SAFE AND CLEAN ENVIRONMENT.
9. STAGING/ PARKING/ DUMPSTERS/ RESTROOMS: THE GENERAL
CONTRACTOR SHALL COORDINATE WITH THE LANDLORD, AN AREA FOR
STAGING OF CONSTRUCTION MATERIALS, EQUIPMENT, DUMPSTER AND
PARKING CONSTRUCTION AND DELIVERY VEHICLES. THE USE OF EXISTING
REST ROOM FACILITIES SHALL BE APPROVED BY THE LANDLORD. ONLY
THOSE DESIGNATED AREAS SHALL BE USED BY CONSTRUCTION CREWS.
10. DUST CONTROL: THE GENERAL CONTRACTOR SHALL USE DUST
PARTITIONS TO MINIMIZE DISTURBANCES OF DAILY TENANT OPERATIONS
DURING DEMOLITION AND CONSTRUCTION WORK. DUST PARTITIONS
SHALL BE CONSTRUCTED OF 2X4 WOOD STUDS ® 24"O.C., INSULATION
AND 6 MIL VAPOR BARRIER ON EACH SIDE.
11. PROJECT INSTALLATION CONFLICTS: CONTACT THE DESIGNER
IMMEDIATELY IF, IN THE FIELD, CONFLICTS ARE DISCOVERED BETWEEN
COMPONENTS OF DIFFERENT SYSTEMS THAT PREVENT THE INSTALLATION
OF THOSE COMPONENTS AS INDICATED ON THE DRAWINGS. T.E.
WHERE EXISTING MECHANICAL DUCTWORK MAY PREVENT THE
INSTALLATION OF LIGHTING FIXTURES AS INDICATED ON THE CEILING
PLAN).
12, SCHOTT DESIGN HAZARDOUS MATERIALS WAIVER: SCHOLL DESIGN,
INC., IS NOT RESPONSIBLE FOR THE IDENTIFICATION, DISCOVERY,
PRESENCE, HANDLING, REMOVAL, DISPOSAL OF, OR EXPOSURE TO ANY
PERSONS, THAT OF HAZARDOUS MATERIALS IN ANY FORM ON THE
PROJECTSITE.
13. WOOD BLOCKING IN WALLS: PROVIDE FIRE -TREATED WOOD
BLOCKING IN WALLS FOR ALL WALL HUNG ITEMS INCLUDING
MILLWORK, WALL STOPS, CABINETRY, ETC.
14. SHOP DRAWINGS: SHOP DRAWINGS OR CATALOG CUTS MUST BE
SUBMITTED TO SCHOTT DESIGN, INC. FOR APPROVAL ON ALL MATERIALS
OR ITEMS WHERE THE CONTRACTOR CHOOSES TO DEVIATE FROM WHAT
IS SHOWN ON THE DRAWINGS, OR IF THE DRAWINGS DO NOT INDICATE
A SPECIFIC MANUFACTURER OR MODEL NUMBER. EXPEDITE
PREPARATION AND SUBMITTAL OF ALL SHOP DRAWINGS TO ALLOW
SUFFICIENTTIME FOR CHECKING, APPROVAL, ORDERING, FABRICATION,
AND DELIVERY OF MATERIALS AND EQUIPMENT.
15. PROJECT APPROVALS: ALL DETAILS, MATERIALS, AND INSTALLATIONS
ARE SUBJECT TO FIRST APPROVAL BYSCHOTT DESIGN, INC., AND FINAL
APPROVAL BYTHE OWNER.
16. CHANGE ORDERS: REVIEW AND COORDINATE ALL NEW WORK AND
EXISTING CONDITIONS WITH ALL OTHER TRADES. FIELDWORK ORDERS &
CHANGE ORDERS WILL NOT BE APPROVED FOR ANY CONDITIONS OR
CONFLICTS THAT COULD HAVE BEEN ACCOUNTED FOR BY THE BIDDER
DURING PREBIDFIELD INSPECTION AND AFTER AWARD OF CONTRACT.
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and meal Codes
City of Camel
�VII��V `0*�41WMt_
DATE: \\ 10/16/19
17. FURNITURE AND EQUIPMENT EXCLUSIONS: FURNITURE, OFFICE EQUIPMENT
OFFICE PARTITION SYSTEMS, REFRIGERATORS, VENDING MACHINES, AND
OTHER SIMILAR ITEMS SHOWN DASHED ON THIS DRAWING AND NOT
ATTACHED TO THE BUILDING ARE FOR REFERENCE ONLY AND ARE NOT TO BE
PROVIDED AS PART OF THE WORK UNLESS SPECIFICALLY STATED TO BE
PROVIDED.
18. WALL PATCHING: PATCH ALL GYPSUM WALLBOARD AT AREAS OF
ELECTRICAL, DATA AND SWITCH DEVICES BEING REMOVED. PATCH HOLE WITH
DRYWALL TAPE SPACKLE AND PREPARE FOR FINISH.
19. CONSTRUCTION CLEANING: EXECUTE A THOROUGH FINAL CLEAN AND
INSPECTION OF THE SPACE UPON COMPLETION OF THE PROJECT. ALL
SURFACES, FIXTURES, AND EQUIPMENT SHALL BE CLEAN, AND THE SPACE SHALL
BE TURNED OVER TO THE OWNER IN A CONDITION THAT REPRESENTS THE
HIGHEST LEVEL OF CARE AND PROFESSIONALISM. ENSURE ALL GENERAL
CONTRACTOR INSTALLED APPLIANCE S WORK & DO NOT LEAK.
20. O & M MATERIALS: PROVIDE TO THE OWNER ALL OPERATION AND/OR
MAINTENANCE MANUALS, OR INSTRUCTIONS FOR ALL EQUIPMENT AND
SYSTEMS AT THE COMPLETION OF THE PROJECT.
21. PLAN DIMENSIONS: ALL PLAN DIMENSIONS ARE FROM FACE OF EXISTING
FINISH TO FACE OF NEW GYPSUM BOARD WALL, OR FACE TO FACE OF NEW
GYPSUM BOARD WALL. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS
GOVERN,
22. WINDOW BLINDS: CONTRACTOR TO PROVIDE AN ALLOWANCE FOR
CLEANING EXISTING WINDOW BLINDS. REPLACE ANY DAMAGED OR MISSI NG
WINDOW BLINDS WITH NEW TO MATCH BUILDING STANDARD.
23. PERMITTING: THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR
VERIFYING THE REQUIREMENTS REGARDING LOCAL PLAN REVIEW, PERMITS,
INSPECTIONS, AND FEES. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE
FOR SUBMITTING ALL REQUIRED DRAWINGS AND SUPPORTING DOCUMENTS TO
THE LOCAL BUILDING OFFICIAL AND/OR PERMIT DEPARTMENT. ALL REQUIRED
LOCAL PERMIT FEES SHALL BE PAID BY THE GENERAL CONTRACTOR UNLESS
STIPULATED OTHERWISE IN THE OWNER/CONTRACTOR AGREEMENT.
24. FIRE SEALING: FIRE SEAL ALL PENETRATIONS THROUGH RATED WALLS,
FLOORS, AND CEILINGS WITH APPROVED FIRE -RATED CAULK AS DIRECTED BY
LOCAL JURISDICTIONS. CONTRACTOR TO BE AWARE THAT EXISTING
CONDITIONS ARE NOT NECESSARILY AN INDICATOR OF BUILDING TYPE.
BUILDING TYPE LISTED ON LI00 IS BASED UPON AVAILABLE INFORMATION AND
FIELD VERIFICATION.
25, WALL PENETRATIONS: WHERE STRUCTURAL BEAMS, DUCTWORK, ETC.
PENETRATE SOUND OR FIRE RATED PARTITIONS, GYPSUM WALLBOARD WALL TO
BE SCRIBED TO FITTIGHT, CAULKED AND FIRE DAMPERED IF REQUIRED.
26, FLOOR LEVELING: CONTRACTOR TO ALLOW FOR UN LEVEL FLOOR
CONDITIONS. ALL EXISTING FLOOR AND WALL SUBSTRATES SHALL BE LEVELED
AND PATCHED AS REQUIRED TO RECEIVE NEW CONSTRUCTION AND FINISHES.
ADJUST DOORS AND FRAMES AS REQUIRED.
27. REPAIR GYPSUM WALLBOARD: WHERE DEMOLITION HAS OCCURRED AT
REMAINING WALLS, REPAIR ANY GYPSUM BOARD DAMAGED BY DEMOLITION.
PROVIDE EXPANSION JOINTS IN DRYWALL WHERE NEW WALLS MEET OR
ADJOIN TO EXISTING CORE WALLS.
28. EQUIPMENT INSTALLATION: ALL EQUIPMENT AND/OR FIXTURES SHALL BE
INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS OR INSTRUCTIONS.
FINISH NOTES
1. STATE BUILDING COMPLIANCE FOR FINISHES: ALL FINISHES SHALL COMPLY
WITHCHAPTER8 (INTERIOR FINISHES) OF THE INDIANA BUILDING CODE FOR
CLASS A FIRE RATINGS.
2. GYPSUM ASSOCIATION CONFORMITY: FOR ALL NEW DRYWALL
NSTALLATIONS, INSTALL AS RECOMMENDED BY THE GYPSUM ASSOCIATION.
(SUCH AS, CONTROL JOINTS, FINISH LEVELS, FASTENERS, TAPING DETAILS,
CORNER BEADS, ETC.) PROVIDE NEW CEMENT BACKER BOARD AS A
SUBSTRATE FOR NEW WALL TILE PER MANUFACTURER'S RECOMMENDATIONS
3. COVER PLATES: REFERENCE REFLECTED CEILING PLAN AND ELECTRICAL
PLAN FOR COLOR OF ELECTRICAL AND DATA DEVICES AND PLATES. REMOVE
ALL PLATES BEFORE PAINTING AND REATTACHED AFTERWARDS. CONTRACTOR
TO CONFIRM DESIRED COLOR PRIOR TO PURCHASING NEW,
4. PAINTING: ALL AREAS RECEIVING PAINT ARE TO RECEIVE PRIMER COAT
AND TWO (2) FINISH COATS.
5. FLOORING TRANSITION STRIPS: FOR CHANGE IN FLOOR FINISH MATERIAL,
PROVIDE TRANSITION STRIP AT DOOR OPENINGS AS NOTED ON FINISH PLAN
UNLESS NOTED OTHERWISE (I.E. WHERE VCT MEETS CARPET).
6. DELIVERY OF COMPREHENSIVE WORK PRODUCT: WHERE LIMITS OF WORK
ARE SHOWN, OTHER INCIDENTAL WORK LIKE PAINTING WHERE NEW OUTLETS
HAVE BEEN INSTALLED, IS CONSIDERED PART OF THE SCOPE OF WORK.
PROVIDE A COMPLETE AND FINISHED PRODUCT READY FOR TENANT AND
BUILDING OWNER.
7. WALL DEMOLITION: REFINISH SURFACES TO MATCH EXISTING WHERE
DEMOLITION HAS OCCURRED, REPAIR GYPSUM WALLBOARD WHERE
DEMOLITION HAS OCCURRED AT REMAINING WALLS. REPAIR ANY GYPSUM
BOARD DAMAGED BY DEMOLITION. PROVIDE EXPANSION JOINTS IN
DRYWALL WHERE NEW WALLS MEET OR ADJOIN TO EXISTING CORE WALLS.
8. TELEPHONE BOARDS: WHERE PHONE BOARD IS PROVIDED, PAINT BOARD
WITH FIRE RETARDANT PAI NT TO MATCH ADJACENT WALL FINISH.
9. MILLWORK SAMPLES: SUBMIT FINISH SAMPLE OF MILLWORK (STAINED OR
PAINTED AS SPECIFIED) TO SCHOTT DESIGN FOR REVIEW AND APPROVAL
PRIOR TO THE FINISHING PROCESS OF ALL MILLWORK.
10. INTERIOR ELEVATION DETAILS: REFERENCE INTERIOR ELEVATION &
SECTIONS WHERE PROVIDED FOR ADDITIONAL FINISH INFORMATION.
11. PAINT L ADHESIVE VOC'S: ALL PAINTS AND ADHESIVES/SEALANTS SHALL
HAVE ZERO VOC CONTENT.
12. ADHESIVE MANUFACTURER RECOMMENDATIONS: ALL
ADHESIVES/SEALANTS TO BE USED AS RECOMMENDED BY PRODUCT
MANUFACTURER.
MECHANICAL & ELECTRICAL
NOTES
DECONSTRUCTION NOTES
I. DESIGN/BUILD MEP: THE MECHANICAL, ELECTRICAL AND PLUMBING
19. FIRE ALARM DEVICE LOCATIONS: COORDINATE WITH THE
1. DECONSTRUCTION DEFINITION: CAREFULLY DISMANTLE SPACES WITH
SCOPES OF WORK ARE LIMITED TO BASIC DESIGN -BUILD ALTERATIONS
TENANT PRIORTOLOCATIONS INSTALLATION OF FIRE DETECTION DEVICES
THE GOAL OF MAXIMIZING THE REUSE POTENTIAL OF ITS COMPONENTS.
WHIOWNER
NEDI NTHESE PHA NS. THEDES IGN-BUILD
AVOID CONFLICT WITH FEATURE
FOR EACH TRUTH(
FOREACHMUSTNOTIFYTHE THEY FINDTHAT
IND THARTHE
ROOMS
WALLS( ONFER LACEROMSANDREC
2. CYCLING END AL CONTRACTORPONSIBLEMATERIAL FOR
HE LEVEL OHITECT MECHF
SCOPE OF WORK EXCEEDS THE LEVEL OF MECHANICAL, ELECTRICAL OR
NICAL,
PRESENTATION BOARDS, ARV EQUIPMENT
TENANT-INSTALLED ITEMS AR E
TENANT -INSTALLED ITEM$
LINGANY PROJECT
RECYCLING ANY AND ALL POSSIBLE PROJECT MATERIAL WASTE AND
RECYCLING
PLUMBING INDICATEDONTHESE DRAWINGS ANY
NS)
AND PROJECTION SCREENS).
COORDINATING HAULING CONTAINERS WITH THE
ENGINEERINGORK IOTHAT
NECESSARY ENGINEERING CAN OCCUR AND ADDITIONAL PLANS CAN BE
WASTE R.
SUB-CONTRACTTE OR.
WASTE MANAGEMENT SUB -CONTRACTOR. REFER TO
FILED, OR IF ADDITIONAL INFORMATION IS NEEDED IN ORDER TO DO THE
20.VIDE NGLIGHTFIXTURE IF REQUIRED, AND NECESSARY,
DECONSTRUCTION DI I I SHEET FOR SPECIFIC INSTRUCTIONS.
WORK IN THE FIELD. THE MECHANICAL, ELECTRICAL AND PLUMBING
IS
LAMP:
PROVIDE NEW BALLASTS AND LAMPS IN ALL LIGHTS IN EXISTING SPACES.
DESIGN -BUILD CAL TRACTORS SHALL COMPLY WITH ALL APPLICABLE
CONSULT WITH LANDLORD.
ELEMENTSOFBUILDING: NO STRUCTURAL OR
EXISTINGLOAD-BEARING
STATE AND LOCAL BUILDING CODES.
L CONSTRUCTION
LOAD -BEARING CONSTRUCTION SHALL BE REMOVED, DEMOLISHED, OR
CTIO REMOVED,
FIRE SUPPRESSION AN D FI RE ALARM SYSTEMS SHALL BE INSTALLED BY THE
21. HVAC R BALANCE: PERFORM AIR
DAMAGED AS A RESULT OF THIS PROJECT UNLESS SPECIFICALLY NOTED
APPROPRIATE DESIGN -BUILD CONTRACTOR AND MUST COMPLY WITH ALL
BALANCE UPON COMPLETION OF HVAC SCOPE PROVIDE REPORT TO
UPON COMPLETITOR ON SCOPE. PROVIDE
OTHERWISE ON THE DRAWINGS. PROTECT ALL EXISTING STRUCTURAL
APPLICABLE STATE AND LOCAL BUILDING CODES. FIRE SUPPRESSION
LANDLORD.
MEMBERS DURING DEMOLITION/CONSTRUCTION. THE CONTRACTOR
AND FIRE ALARM DESIGN -BUILD CONTRACTORS ARE RESPONSIBLE FOR
SHALL VERIFY IN THE FIELD, PRIOR i0 DEMOLITION, THAT ALL ITEMS
COMPLETING AND FILI NG THEIR PLANS AND OBTAIN ING THEIR PERMITS.
22. HVAC FLEX DUCT: FLEX DUCT MUST MEET ASHRAE STANDARD
NOTED TO BE DEMOLISHED ARE NOT STRUCTURAL. CONTACT SCHOLL
BUILDING CODES FOR FLEX DUCT LENGTH. NOMORETHAN3FEETOF
DESIGN IMMEDIATELY IF THE CONTRACTORS) IN THE FIELD SUSPECT
2. DESIGN/BUILD HVAC: MECHANICAL WORK IS LIMITED TOA
FLEXIBLE DUCT IS TO BE INSTALLED PER BUILDING STANDARDS. INSTALL
THAT AN ITEM NOTED FOR DEMOLITION APPEARS TO BE STRUCTURAL OR
DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS. NO NEW
FLEX DUCT AS STRAIGHT AS POSSIBLE. IN NO CASE SHALL OFFSETS EXCEED
OTHERWISE LOAD -BEARING. BEWARE OF STRUCTURAL COLUMNS
MAIN MECHANICAL APPLIANCES OR MAIN EQUIPMENTARE BEING
A 45o RADIUS AND IN NO CASE SHALL A SINGLE RUN OF FLEX DUCT
AND/OR BEAMS THAT MAY BE CONCEALED BEHIND FINISHES THAT ARE
PROVIDED. ALL MECHANICAL WORK IS LIMITED TO RELOCATION OF
EXCEED (2) 450 OFFSETS.
NOTED FOR REMOVAL. EXERCISE CAUTION WHEN DEMOLISHING
DIFFUSERS AND FLEX DUCT PER NEW WALL LAYOUT. NO NEW HARD
BUILDING FINISHES OR PARTITIONS ADJACENT TO OR AROUND
DUCTWORK OR EQUIPMENT IS BEING ADDED; MECHANICAL
23. ELECTRICAL CIRCUITS: AREAS WITHIN ELECTRICAL SCOPE MUST BE
STRUCTURAL MEMBERS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
CONTRACTOR 15 TO NOTIFY APPLICABLE PARTIES IF ADDITIONAL WORK IS
POWERED BY THE ELECTRICAL PANEL FROM THE FLOOR ON WHICH
INADVERTENT DAMAGE TO THE BUILDING STRUCTURAL SYSTEM.
REQUIRED SO THAT ADDITIONAL PLANS CAN BE FILED AND MUST COMPLY
CONSTRUCTION OCCURS.
WITH THE INDIANA MECHANICAL CODE AND ALL OTHER APPLICABLE
4. EQUIPMENT,FIXTURE, FINISH REUSE: WHERE EQUIPMENT, FIXTURES,
CODES.
24. SUPPLEMENTAL HVAC/ELECTRICAL: IN THE EVENTTHAT ANY
OR FINISHES ARE MOVED FROM ANY OTHER PART OF THE BUILDING TO
HVAC EQUIPMENT OR ABOVE BUILDING STANDARD
BE REUSED I N THE PROJECT AREA, THE CONTRACTOR SHALL INCLUDE IN
3.SUPPLEMENTAL
EQUIPMENT
LOADS: VERIFVHEIDE
SPECIALIR
ELECTRICAL POWER FACILITIES ARE INSTALLED (SUCH AS IN AN IT SERVER
THEIR SCOPE OF WORK ANY NECESSARY PATCHING OR REPAIRING OF
AND PR OM DNA FLOW
IN THE TENANT AIR FLOW IF REQUIRED.
ADDITIONAL
AL A
ROOM( CONTRACTOR SHOULD FURNISH AND INSTALL ADDITIONAL
THE REMAINING AREAS FROM WHERE THE ITEMS WERE RELOCATED,
WITSPACE
OWNER PRIOR TO ANY PURCHASE
CONFIRM PURCHASE EQUIPMENT.
ELECTRICAL AN D BTU SUB -METERING SO AS TO ENABLE OWNER TO
UNLESS OTHERWISE DIRECTED BY OWNER,
VISE ZO LNG SINGLE OFFICE
REVISE ZONING RED. DO NOT DESIGNANYYB
MONITOR TENANT'S UTILITY CONSUMPTION (IN RELATION TO THE SUBJECT
BUI
SPLIT E UNLESS BUILDING
MAKE AND5.
MODELOFDOORS
DECONSTRUCTION PLANS: REMOVE ALL EXISTING WALLS AND
OWNSPACE /TANDL RD. CONTRACTOR ENSURE THAT HVAC ZONES
OWNER LORD,CRI TELY
ENSURETLITS
CONTRACTORS METERS SHOULD BE REVIEWED AND
CONTRACTOR'SWNERPIOR
WHERE INDICATED BY NOTE, SYMBOL, OR DASHED LINES. NOTE
N ES ARE
DAPPROPRIATELY SUCH THAT NO SPLITZONESAREIN
AREECESLOCATEDSUCH T
ATED
TO CONTRACTOR
APPROVED BY OWNER PRIOR TO CONTRACTORINSTALLATION.
THAT SOME ITEMS HAVE NOT BEEN SHOWN ON DECONSTRUCTION
OFFICES OR CONFERENCE ROOMS.
OR
PLAN. VISIT AREA OF WORK TO ASSURE EXTENT OF DECONSTRUCTION.
25. ENGINEERED MEP DRAWINGS: WHEN REQUIRED BY STATE BUILDING
4. RELOCATE AIR -SUPPLY DIFFUSERS AND
CODETHE PROVIDE DE SIGN/BUILD DRAWINGS
6. FIELD VERIFICATION OF EXISTING CONDITIONS: REMOVE ALL
RETURNAIRRGRI AIR FOR
URN AIR GRILLELOCATI REQUIRED.
LAICAL, LUMBI G,ESHALL
FOR MECHANICAL, PLUMBING, ELECTRICAL, OR FIRE SUPPRESSION.
CARPET, VINYL BASE,VCT, WALL FABRIC, AND ANV OTHER FINISHES AS
RETURN AIR FR MRETU N AIR GRILLES. CONTRSUPPLY
DIFFUSERS AND RETURN AIR FROM RETURN AIR GRILLES. CONTRACTOR IS
DRAWINGS SHALL BE CERTIFIED BVA LICENSED ENGINEER AND SUBMITTED
REQUIRED FOR NEW CONSTRUCTION. CONTRACTOR TO FIELD VERIFY
TO PLACE LOCATION OF DIFFUSERS AND RETURN AIR GRILLES AS
BY THE CONTRACTOR FOR STATE DESIGN REVIEW.
EXISTING CONDITIONS. REFER TO FINISH PLAN/SCHEDULE FOR
REQUIRED BY CODE,
CLARIFICATION OF EXISTING FINISHES TO REMAIN,
26, EQUIPMENT INSTALLATIONS: ALL EQUIPMENT AND/OR FIXTURES SHALL
5. HVAC THERMOSTAT LOCATIONS: POSITION LOCATION OF ALL
BE INSTALLED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
7 PROTECTION OF BUILDING ELEMENTS 70 REMAIN: USE CARE TO
7. PROTECTIOOTECT N
THERMOSTATS WHERE APPROPRIATE PER MECHANICAL DESIGN.
RECOMMENDATIONS OR INSTRUCTIONS.
BUILDING ELEMENTS NDIREMAI:USECACATED ON THE RAWINGS
COORDINATE WITH TENANT AND BUILDING OWNER FOR FURNITURE
TO REMAIN SUCH AS, BUT NOT LIMITED TO, EXISTING CEILING GRID,
PANEL OR OTHER CONFLICTS.
Z7. BUILDING DIRECTORY: ION
TILES, FIRE SUPPRESSION EQUIPMENT, DIFFUSERS, LIGHT FIXTURES,
IN FORMATIOPHICN
EUPDHE
UPDATED WITH NEW
AND PROGRAMMING TO BE UPDATED WITH NEW TENANT'S INFORMATION
EQUIPMENT, CASEWORK, AND FINISHES. THE CONTRACTOR SHALL
6. DESIGN/BUILD ELECTRICAL: ELECTRICAL WORK IS LIMITED iOA
FOR FUTURE USE.
REPLACE AND/OR REPAIR, AT THE CONTRACTOR'S COST, ANY SUCH
DESIGN -BUILD SCOPE AND IS OUTLINED IN THESE DRAWINGS, ALL
ELEMENTS DAMAGED DURING CONSTRUCTION THAT COULD HAVE
ELECTRICAL WORK IS LIMITED TO ADDITIONS OR RELOCATIONS OF
28. ELECTRICAL PANELS: ALL ELECTRICAL PANELS TO GET UPDATED
OTHERWISE BEEN REASONABLY PROTECTED AND MAINTAINED IN
ELECTRICAL OUTLET DEVICES AND LIGHTING THAT DO NOT EXCEED THE
CIRCUIT SCHEDULES.
GOOD CONDITION FOR THE OWNER'S USE IN THE PROJECT.
CAPACITY OF THE EXISTING ELECTRICAL SERVICE IN THE BUILDING.
ELECTRICAL CONTRACTOR IS TO NOTIFY APPLICABLE PARTIES IF
ADDITIONAL WORK IS REQUIRED SO THAT ADDITIONAL PLANS CAN BE
FIRE PROTECTION NOTES
8. REMOVAL OF ABANDONED CABLING& WIRING: PER THE INDIANA
ELECTRICAL CODE (SPREAD OF FIRE OR PRODUCTS OF COMBUSTION)
FILED AND MUST COMPLY WITH ALL APPLICABLE CODES.
REMOVE ALL ACCESSIBLE PORTIONS OF ABANDONED CABLES AND
WIRING INCLUDING BUT NOT LIMITED TO: DATA WIRING,
7. ELECTRICAL CODE COMPLIANCE: COMPLY WITH THE INDIANA
I. FIRE EXTINGUISHERS: CONTRACTOR TO ENS NEW AND
COMMUNICATIONS WIRING, FIRE ALARM CABLES, AUDIO CABLES,
ELECTRICAL AND MECHANICAL CODE AND ALL OTHER APPLICABLE
EXISTING FIRE EXTINGUISHERS ARE INSTALLED ACCORDING TO NFPA 10.
COAXIAL CABLES, FIBER OPTIC CABLES/RACEWAYS, AND PLTC CABLES.
CODES.
COORDINATE WITH OWNER/LANDLORD ON EXTINGUISHER TYPE AND
REFER TO SECTION 300.21. ANY SUCH CABLE OR WIRING SHOULD BE
HOUSING. MAXIMUM TRAVEL DISTANCE OF 75 FEET FROM ANY POINTTO
PULLED AND REMOVED BACK TO THEIR MAIN SOURCES ON THE FLOOR
8. ELECTRICAL CIRCUITING: SIZE AND CIRCUIT ELECTRICAL POWER ITEMS.
A VISIBLE EXTINGUISHER.
(I.E. ELECTRICAL PANELS, PHONE BOARDS, ETC.)
PROVIDE OR REUSE ELECTRICAL POWER AND DATA OUTLETS AS
REQUIRED.
THE FOLLOWING NOTES APPLY ONLY IN EXISTING SPRINKLERED FACILITIES.
9. PROTECTION OF ABANDONED/TERMINATED BUILDING SYSTEM
ELEMENTS: WHERE FIXTURES OR EQUIPMENT ARE REMOVED FROM ANY
9. GPI OUTLETS: ALL ELECTRICAL OUTLETS WITHIN 6-0"OFWATERARETO
2. DESIGN BUILD FIRE PROTECTION SYSTEM: FIRE PROTECTION WORK IS
ELECTRICAL, PLUMBING, MECHANICAL, OR VOICE/DATA SYSTEMS, ALL
BE G.F.C.I.
TO BE PROVIDED BYD DESIGN/BUILD SERVICES UNDER DERTEC GENERAL
REMAINING TERMINATIONS SHALL BE CLOSED AND PROTECTED IN
CONTRACT. PROVIDE A COMPLETE, WORKING SYSTEM. SCHOTT
STRICT ACCORDANCE WITH INDUSTRY STANDARDS AND GOVERNING
10. PHONE AND DATA ACCOMMODATIONS: AT EACH PHONE AND DATA
DESIGN, INC., IS NOT RESPONSIBLE FOR THE DESIGN, INSTALLATION, OR
SAFETY REGULATIONS OR PROCEDURES. MARK, LABEL, OR FLAG ALL
JACK, PROVIDE PULL STRING FROM ABOVE CEILING TO BOX. TENANTS
RENOVATION OF THE FIRE SPRINKLER SYSTEM.
TERMINATED SYSTEMS FOR FUTURE REFERENCE. CONTRACTOR i0
DATA CONTRACTOR IS RESPONSIBLE FOR PULLING CONDUCTORS AND
PROVIDE AN "AS -BUILT' SET INDICATING THE LOCATION OF ALL
PROVIDING APPROPRIATE TERMINALS AT FACE PLATE.
3. FIRE PROTECTION SYSTEM CODE COMPLIANCE: THE DESIGN/BUILD
PERMANENTLY ABANDONED SYSTEMS.
CONTRACTOR SHALL COMPLY WITH THE INDIANA BUILDING CODE, THE
11. ELECTRICAL SWITCH PLATES: PROVIDE COLORED FACEPLATES FOR
INDIANA FIRE CODE, AND ALL OTHER APPLICABLE LAWS, CODES, RULES
10. HAZARDOUS MATERIALS: GENERAL CONTRACTOR IS RESPONSIBLE
ELECTRICAL OUTLETS& SWITCH PLATES TO MATCH EXISTING, UNLESS
AN D REGULATIONS THAT APPLY TO DESIGN AND INSTALLATION OF FIRE
FOR IDENTIFYING ANY AND ALL ITEMS THAT MAY CONTAIN HAZARDOUS
OTHERWISE NOTED, ELECTRICIAN TO FIELD VERIFY PRIOR TOPURCHASE.
SPRINKLER/FIRE SUPPRESSION SYSTEMS.
OR HARMFUL MATERIALS. ALL IDENTIFIED ITEMS MUST BE PROPERLY
DISPOSED OF PER EPA AND INDIANA DEPARTMENT OF ENVIRONMENTAL
12. WORK STATION POWER: PROVIDE JUNCTION BOXES OR POWER POLES
4. FIRE PROTECTION DESIGN DRAWINGS: THE FIRE PROTECTION
MANAGEMENT RULES AND REGULATIONS.
AT WORKSTATIONS WHERE SHOWN. REFER TO THE PLAN FOR THE
CONTRACTOR SHALL GENERATE ALL REQUIRED DRAWINGS, AND SHALL
APPROPRIATE DESIGNATIONS. DATA WILL BE RUN BY THE TENANT'S DATA
FILE THOSE DRAWINGS, AND RELATED DOCUMENTS, WITH THE STATE AND
VENDOR. ELECTRICIAN TO MAKE FINAL CONNECTION FROM
LOCAL AUTHORITIES HAVING JURISDICTION OVER THE PROJECT.
WORKSTATION WHIP TO JUNCTION BOX. THE FURNITURE VENDOR IS TO BE
RESPONSIBLE FOR WIRING THE BASE PANELS OF THE WORKSTATIONS.
5. SPRINKLER HEADS: PROVIDE NEW OR RELOCATE EXISTING SPRINKLER
CONTRACTOR TO COORDINATE WITH TENANT ON WORKSTATION
HEADS AS REQUIRED. PROVIDE MISSING COVER/ESCUTCHEON PLATES
FURNITURE SPECIFICATIONS TO OBTAIN CIRCUITRY REQUIREMENTS PRIOR
FOR SPRINKLER HEADS WHERE APPLICABLE. FIELD VERIFY EXISTING
TO RUNNING ELECTRICAL CONDUITS TO JUNCTION BOXES.
CONDITIONS PRIOR TO THE START OF WORK.
13. LIGHTING CIRCUITS: VERIFY EXISTING LIGHTING CIRCUITING. SIZE NEW
EFFECTIVE CODES
CIRCUITS AS REQUIRED. PROVIDE NEW OR REVISE EXISTING CIRCUITING
FOR NEW LAYOUT OF LIGHT FIXTURES.
- GEN ERAL ADMINISTRATIVE RULES (6751AC 12)
14. ELECTRICAL OUTLETS: ENSURE THAT ALL MOUNTING HEIGHTS OF
- INDIANA BUILDING CODE, 2014 EDITION (IBC, 2012 EDITION, 6751AC
ELECTRICAL DEVICES MEETA.D.A. REQUIREMENTS.
13-2.6)
- HANDICAPPED ACCESSIBILITY CODE: 2014 INDIANA BUILDING CODE
15. LIGHTING SWITCH PLATES: WHERE MULTIPLE SWITCHES ARE SHOWN,
CHAPTER II, ANSI A117.1-2009, 6751AC 13-2.6-12)
PROVIDE(() GANG BOX WITH A SINGLE COVERPLATE.
- IN DIANA FI RE CODE, 2014 EDITION(IFC 2012 EDITION, 6751AC 22-2.5)
- INDIANA PLUMBING CODE, 2006 EDITION (6751AC I6-1.4)
16. LIGHT FIXTURE PLACEMENT: CENTER CEILING ELEMENTS IN CEILING
- INDIANA ELECTRICAL CODE, 2009 EDITION (2008 NFPA 70, 6751AC
TILES, INCLUDING RECESSED DOWNLIGHTS, SMOKE DETECTORS,
17-1.8)
SPRINKLER HEADS, AND EXIT SIGNS UNLESS OTHERWISE NOTED.
- INDIANA MECHANICAL CODE, 2014 EDITION (IMC, 2012 EDITION, 675
IAC 18-L6)
17. EMERGENCY LIGHTING: PROVIDE EMERGENCY LIGHTING IN TENANT
- ENERGY CONSERVATION CODE, 2010 (ASHREA 90.1, 2007 EDITION,
SPACEAS REQUIRED PER NEMA AND IBC. EMERGENCY BATTERY PACKS
6751AC 19.3)
OR LIGHTS CONNECTED TO AN EMERGENCY POWER SOURCE ARE
REQUIREDN THESPACE OR MORE. FIXTURES
SHOWN ON PLAN ARE FOR REFERENCE ONLY.
FOR REFERENCEONLY.
DOCUMENT APPROVAL
18. FIRE ALARM SYSTEM: PROVIDE ALARM NOTIFICATION APPLIANCES
SPEAKERS, SMOKE DETECTORS, FIRE
TENANT/CLIENT, UPON SIGNATURE, APPROVES ALL
ASPECTS OF THE SCOPE OF WORK CONTAINED IN
PULLS, AND ANY
PULLS, AND YO OTHER REQUIRED SYSTEMS
ERREQUIRABLECO
EDETECTIONONALBUIL
NECESSARY TO MEET ALL APPLICABLE CODES (INTERNATIONAL BUILDING
TO MEET
THESE DOCUMENTS.
CODE, INTERNATIONAL FIRE CODE, NFPA). IN RECEPTION AREAS,
CONFERENCE ROOMS AND OTHER HIGH PROFILEAREAS WITHIN SUITE,
ALL LOCATIONS OF SUCH DEVICES MUST BE APPROVED BYSDI OR
TENANT PRIOR TO INSTALLATION. FAILURE TO DO SO MAY RESULT IN
CONTRACTOR RELOCATINGTHESE ITEMS ATTHEIR EXPENSE. TENANT/CLIENT COMPANY NAME
ITgJiltl�Ng97�iTa1G\IL7i.9RPJdED 7i1gJc\J�3g93sjga/_\I\Li971�alIgwPJcn4
ALL COSTS INCURRED DUE TO ANY CHANGES REQUESTED AFTER SIGN -OFF OF THESE DOCUMENTS SHALL BE THE FULL RESPONSIBILITY OF THE
TENANT/CLIENT.
THESE DRAWINGS, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOTTO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN.
MILL/CASEWORK NOTES
I. CASEWORK/MILLORK: CASEWORK AND MILLWORK GENERALLY
INDICATED ON THESE DRAWINGS ARE TO BE PROVIDED UNDER THE
GENERAL CONTRACT.
2. AWI COMPLIANCE: UNLESS INDICATED OTHERWISE, COMPLY WITH
ARCHITECTURAL WOODWORK INSTITUTE (A.W.I.) CURRENT STANDARDS
FOR CUSTOM GRADE WOODWORK.
3. MILLWORK SHOP DRAWINGS: FURNISH SHOP DRAWINGS ON ALL
MILLWORK AND CASEWORK FOR APPROVAL BY THE TENANT AND
SCHOTT DESIGN PRIOR TO FABRICATION.
4. MILLWORK FIELD VERIFICATION: WHERE CASEWORK AND MILLWORK
ARE TO BE INSTALLED, VERIFY ALL DIMENSIONS ON PLANS AGAINST
DIMENSIONS OF AS -BUILT CONDITIONS INFIELD. REPORT ANY
DISCREPANCIES TO SCHOLL DESIGN THROUGH THE GENERAL
CONTRACTOR, MAKE ADJUSTMENTS TO CASEWORK AND MILLWORK
TO FIT FIELD CONDITIONS UNLESS DOING SO WILL SIGNIFICANTLY ALTER
THE INTENT OF THE DESIGN SHOWN ON THE DRAWINGS.
5. DRAWING REVIEW AND DISCREPANCIES: VERIFY FINISHES (LAMINATE,
VENEER, STAINS, ETC.( ON THE SECTIONS AND ELEVATION DRAWINGS
WITH FINISHES INDICATED ON THE FINISH PLAN/SCHEDULES.
IMMEDIATELY REPORT ANY DISCREPANCIES TO SCHOTT DESIGN
THROUGH THE GENERAL CONTRACTOR.
6. MILLWORK REQUIREMENTS: REFER TO MILLWORK SECTIONS&
ELEVATIONS . UNLESS OTHERWISE SHOWN, PLASTIC LAMINATE CLAD,
COUNTERTOPS WITH 4" BACKSPLASHES WHERE INDICATED.
BACKSPLASHES TO BE FIELD APPLIED. REFER TO MILLWORK SECTIONS &
ELEVATIONS FOR CABINETRY SPECIFICATIONS(CUSTOM PLASTIC
LAMINATE OR PRE -MANUFACTURED STOCK CABINETRY(, EDGESOF
PLASTIC LAMINATE COUNTERTOPS, CABINETS AND DRAWERS TO BE
PLASTIC LAMINATE AND NOT PVC OR OTHER STOCK PLASTIC EDGING
UNLESS NOTED OTHERWISE.
7. MILLWORK WALL BLOCKING: TO PROVIDE BLOCKING IN WALLS FOR
ALL MILLWORK, WALL STOPS, HARDWARE, AND CABINETRY WHERE
SPECIFIED. ALL WOOD BLOCKING TO BE FIRE RATED.
GI ThE III
9
ne.�amnrw"o9
17
Inn �
9I ,..
H.I.nr jwln ,.,law
1ne
m
q9® aRiii t
"l comn
III um uvmmnv
F "I IT ea ..,
.&I9 9U,Ti .F I
,
X �a
VICINITY MAP
NOT TO SCALE
KEY PLAN - 3RD FLOOR
N
NOT TO SCALE
INDEX OF DRAWINGS
Till COVER SHEET AND GENERAL PROJECT NOTES
L100 BFESAFETYPLAN
Alit DECONSTRUCTION / ARCHITECTURAL FLOOR PLAN
A121 REFLECTED CEILING PLAN / ELECTRICAL PLAN
A211 DOOR SCHEDULE/ INTERIOR DETAILS/ FINISHPLAN
THIS DRAWING, AND THE IDEAS,
DESIGNS AND CONCEPTS CONTAINED
HEREIN. ARE THE EXCLUSIVE
INTELLECTUAL PROPERTY OF SCHOTT
DESIGN, INC., AND ARE NOT TO BE
USED OR REPRODUCED IN WHOLE, OR
IN PART. WITHOUT THE WRITTEN
CONSENT OF SCH07 DESIGN.
Q
LO
M �
W N
ZH
W=Dv
ON Z
V
r RRRRmom W VJ
2CL Lu
LJ
OO
O In CL
Q
�Z
Q
W Q
Q Z
DO
N
SSUE
DATE
I DESCRIPTION
08.07.19
REVIEW SET
08.12.19
PERMITSET
08.29.19
CONSTRUCTION SET
REVISIONS
MAR DATE DB DESCRIPTION
PROJECT NUMBER
2019.127
PROJ.MGR DRAWN BY
MS/SDH MS/AMM
3RD FLOOR
COVER SHEET AND
GENERAL NOTES
T111