Loading...
HomeMy WebLinkAboutM201-HVAC-PLAN-Rev.0ch line outlet, install per ver's recommendations. eferto Philips drawings. D RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City of Camel (� �Vml�tla>nrMa�L DATE: \ 10/16/19 0 0[;][A Vestibc Lobby Corridoi General Notes: 1. These plans are diagrammatic in nature, and do not represent every necessary offset and felting. Contractor shall install his work in a manner that will conform with the structure. Command shall avoid obstructions, preserve head room and maintain maximum clearance without additional cost to the owner. 2. Conceal all piping, power wiring, control wiring and control components unless otherwise noted. If concealment is not possible, contact Engineer for alternatives prior to fabrication. 3. Sheet metal Supply ductwork in concealed spaces shall be insulated with 1Fz'thick, 75 PCF density, fiberglass ductwrap. All ductwork in unconditioned spaces shall be insulated with 2" thick, 1.0 PCF density, fiberglass ductwrap. (Min R6) 4. Phenolic dud by Pal -Dud or Kool-Cum is an acceptable alternative to sheetmetal duct and insulation in concealed spaces. 5. Keep all Rude rk, dad system and equipment openings covered with adhesive duct protective wrap like Venturell 1512, until system start-up. This is to prevent intrusion of construction dirt and debris Harry the duct system, and HVAC equipment. B. If any questions arise concerning the HVAC requirements of these documents, please conact The Engineering Collaborative at (317) 636-3941, prior to bidding, fabrication or installation of equipment. 7. Sheet metal transitions by Sheet Metal Contractor. 8. Refer to detail sheet M701 for additional requirements and information that applies to this project. Plan Notes: OEquipment mounted on roof. OConstant airflow regulator set to 235 CFM. Model Aides CAR -II size 8" or equivalent. This CFM available for "System Air Cooling Unit" as per Philips drawings sheet MPS. OHumidifier dispersion tubes. Follow all MFR's recommendations. Straight dud with no transitions, taps, etc. for a MINIMUM of 12" upstream and 24" downstream of dispersion tubes. Oq Al ductwork, diffusers, hangers, am inside the RF cage shall be nonferrous metal. Coordinate openings in cage with cage designer. O24"xl2" sleeved return opening show ceiling and RF cage. © Emergency exhaust fan. All ductwork shall be above the RF cage. Fan to operate via 02 sensor. OEggcrate return grille with sound baffle. See details. OBalance exhaust dud to 75 arm. OExi sting thermostat to be relocated. 1p Exi ding exhaust trunk to be relocated clear of new RF cage as indicated. Also shown on HVAC Demo Plan. a w Z> I ccF�— e LU LUcr ?0 0m a za LJ J z - J W 0 H U IT CERTIFIED BY. CM RIGHT M LyrtenA summary eprter mertYk AnNand ohr LrvRm asts In Ave LUnTim par, . arena a:r. amp raw omane� apian� Hear xio, end ,met o Tire fymemg[nlemn, `�.JEL L "y. T o U _* PE10100876 * SdTA�T�E�OpF bolo C Ni 09130119 lissessessesses- we W Wwessesse 0 0 i' !'V _Oa no Q Z -a LLaremssss L 'a O lessessessessess- L/i to :::E — LLJ ZIII Vf Q a—+ 2 d O O L.LJ Z M aremssss 'a Q Z � L.LJ r+1 m cry m m � O z w z 3u—e w x z � V d rn 0 N Z g ay J o aT i 0 SHEET NO. M201