RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Camel (�
yVm�tanrk�pll�+L
DATE: 10/16/19
—
0 c[q]
Vestibc
1co
General Notes:
A. All fittings, piping, fixtures, materials, etc. to meet the
current Safe on nk ng Water Act with all of its
amendments and the Reduction of Lead in Dd nk no
water Act.
B. All work shall comply with all national, state, local codes
and ordinances pertaining to the work in this project.
C. All plumbing fixuns shall be supplied with individual
water supply stops and code approved traps. Exposed
piping shall be chrome plated.
D. All plumbing fixWres shall be installed with approved
bankf Dw prevention deuces.
E No piping shall pass directly cover electrical power
distribution cabinets, panelboards, etc. Contractor to
coordinate panel locations prior to piping installation.
F. DO NOT USE CELLULAR CORE PVC.
G. All plumbing vent to be a minimum of 10'-0' from any air
intake. Coordinate locations with HVAC plans.
H. Single rumouts to plumbing fixtures shall be the same
size as on the plumbing fixture schedule unless
otherwise noted.
I. Dry -pipe fire protection system shall be used in all areas
subject to freezing.
J. All waste, water, vent, gas and condensate lines shown
to be connected b their resonated fixturemiquipment,
unless noted otherwise. All equipment and systems
shown must be complete and usable upon conplefion of
project. All connections and installations to be per the
manufacturer's requirements.
Plan Notes:
@Neatly saw -cut existing slab along entre length of new
waste line. Repair slab in kind, ready for finish.
@Connect new waste line to nearest active waste line of
equal or larger size. Field verity exact size, location,
elevation, material, direction of flow and condition of
existing waste line; prior to start of work.
@Connect new water lines to nearest active water lines of
equal or larger size. Field verify exact size, locafion,
material and condition of existing water lines; prior to
start of work.
@Provide'j'CW down to serve R/O system and
condensate cooler.
General Demoltion Notes:
A. Contractor shall W required to visit the premises prior to
bidding to determine all existing conditions and systems
related to his work. Contractor shall include in his bid
proposal all labor and material as required for the
plumbing installation to be complete and operative.
B. Coordinate the plumbing work with the architectural,
electrical, mechanical and other plans and details related
to this project for work of all other trades.
C. The drawings represent a general scheme of existing
conditions. All details of existing conditions may not
appear on the drawings. The contractor shall visit the
premise prior to bidding to determine all existing
conditions and systems related to his work and shall
include in his bid proposal all labor and material as
required:
1. To disconnect and remove all plumbing equipment
that is to be removed from service or that is not to be
mused.
2. To reconnect water, gas, waste and vent lines to all
existing equipment that is to be mused.
3. To provide a complete and operafive system in
accordance with the intent of these drawings and
specifications.
D. The contractor shall include in his bid proposal all costs
related to the deposal of existing equipment removed
under his contract.
E. Existing waste, vent, water and gas lines no longer used
for any purpose shall be removed unless imbedded in
masonry, in which case it shall be cut off flush with
w dace and patched, ready for finish.
F. Where plu mbi ng fixtures are removed, all the existi ng
waste, vent and water lines shall be removed back to the
next active branch.
G. Existing PVC in new return air plenums shall be wrapped
within materials listed and labeled for such application, to
meet the 25/50 flame smoke rating.
Demolition Plan Notes:
1�Existing fixture to be removed in its entirety. Existing
water and vent lines to be removed bank to next active
branch, provide permanent cap. Existing waste line to be
removed to below slab, provide permanent cap. Repair
floor and wall in kind, ready for finish.
6
LU
`` t
W F— fi
Q
Z LU
cc s
— 0 P
DO 1
Z Q e
LL' J s
J �
W O
- i t
r
r
i
CERTIFIED BY.
COI RIGHT M winenA Quab,Yrrt wi mertYk
Anla Mohr LrvRm nllu In way LUnTwo par, .
any V ed to arena
any, amp ammeansdinabroad
Perry xion aid umet 1kfyxvnq e1wrtlrc.
,yinEL'L�p"Go'
No. 4-
_* PE10100876 *
?� STATEOF q0�
qi� �vDIANfi' c
Ni
0&30118
liessessessessess-
LU
C� LLJ
00 �'cv
_Oa "Ins",
ra
Q Z —a p�
LL L 'a
O
lessessessessess-
to to :::E -
L1J Z vi
Q a—+
2C1. o 0
LI Z
M
Z Z
Q
Z �
LLJ
I-
M
V 2 ry
J cryM Vf ai
i
r °O
m o 0
z w z
3 u -
=
2
JN
Clem
V �
0
M_Z p
W
J
6i 0
SHEET NO.
P201