Loading...
HomeMy WebLinkAboutS100-SLAB-PLAN-Rev.0J a b b a A a d ad a a a FI I RELEASED FOR CONSTRUCTION Subject to compliance with all regulations of State and Local Codes City d Camel �VM�tanld(WA� DATE: 10/16/19 T 03" d a a E d c a Q a a 7; SLAB ON GRADE PLAN SCALE: 1/4'=1'-0' 5100 EXISTING SLAB ON GRADE KEY NOTES: O - EXISTING 4' THICK SUB ON GRADE. VERIFY IN FIELD. O - NEW 6" THICK SLAB ON GRADE REINFORCED WITH FIBERMESH 300, OVER 15 MIL POLY VAPOR BARRIER OVER 4' GRAVEL BASE. SEE TYPICAL DETAIL 3/S100. O3 - NEW 18" THICK SLAB ON GRADE UNDER MRI UNIT. SUB SHALL BE REINFORCED WITH FRP REBAR AS SHOWN IN DETAIL 2/5100. THIS SUB SHALL MEET THE MRI UNIT FLATNESS REQUIREMENTS. COORDINATE WITH FINAL MRI UNIT MANUFACTURERS REQUIREMENTS. ®- PROVIDE I' WIDE EXPANSION JOINT BEWEEN THE 18' THICK MRI SLAB AND ADJACENT 6' THICK SUB. SEE 4/S100. SLAB ON GRADE NOTES: 1.1 ALL REINFORCING BARS USED IN THE SLABS SHALL BE FIBERGLASS REINFORCED POLYMER (ERR) REBAR. 1.2 PROVIDE ADD'L 1 ® SLAB RE-ENTRANT CORNERS PER TYPICAL DETAIL 5/S100. 1.3 CONTRACTOR TO PROVIDE SLAB CONTROL JOINTS AT 15'-0' MAXIMUM JOINT SPACING. JOINTS MUST BE IN AN APPROXIMATELY SQUARE PATTERN WITH A MAXIMUM LENGTH TO WIDTH RATIO OF 1.5 : 1.0. SEE 4/S100. 1.4 CONCRETE 28 DAY STRENGTH SHALL BE 3500 PSI (MIN.) LEGEND: NEW SLAB ON GRADE EXISTING 4' SUB ON GRADE NEW 6' SLAB ON GRADE NEW 18" SUB ON GRADE UNDER MRI UNIT. EXISTING SUB ON GRADE VAPOR RETARDING - MEMBRANE: 15 MIL POLYETHYLENE SHEET GRANULAR SSE (3' MIN.) 1 ® 12' c/c, I T.&B. REINFORCING / I SHALL BE FRP REBAR (TYR) 6' SLAB ON GRADE EXPANSION JOINT - SEE DETAIL 4/S100 OVER EXCAVATE BY 12". FILL WTIH ENGINEERED FILL OR GRANULAR MATERIAL IN NO MORE THAN 6" UFTS. COMPACT AND DENSIFY SUCH THAT 95% COMPACTION IS APROXIMATED. SECTION 2 SCALE: 1/2'=1'-O' 5100 LEVELING CI (I" MAX.) 2 NOTES: O1 - COMPACTED GRANULAR BASE COURSE MATERIAL AND DEPTH TO BE IN ACCORDANCE WITH RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER. PROVIDE #57 STONE IF GEOTECH. ENGINEER NOT ENGAGED ON THIS PROJECT, UNLESS NOTED OTHERWISE. O2 - CHOKE SURFACE OF COARSE GRANULAR BASE WITH FINE AGGREGATE MATERIAL SUCH AS D.G.A. FINISHED SURFACE SHALL BE COMPACTED SMOOTH AND LEVEL TO SUPPORT VAPOR RETARDING MEMBRANE WITHOUT PUNCTURING. - CONCRETE FLOOR SUB -ON -GRADE CONSTRUCTION TO BE IN ACCORDANCE WITH RECOMMENDATIONS OF ACI 302.1. REFER TO ARCH. PLANS FOR UNDERSUB AND EDGE INSULATION REQUIREMENTS. ®- REFER TO MECH./EIEC. PUNS FOR IN -SLAB HEATING PIPE DETAILS THAT MAY BE REQUIRED ON THIS PROJECT. TYPICAL DETAILS OF SLAB -ON - GRADE FLOOR SLABS - U.N.O. 3 NOT To SCALE sloo NOTED OTHERWISE, (3) ADD'L. 85 BARS 1 ® TOP NOTES: 1. ADDITIONAL REINFORCEMENT TO BE PLACED AT ALL INSIDE (RE-ENTRANT) CORNERS IN SLABS WHERE CRACK CONTROL JOINTS ARE NOT POSITIONED TO INTERSECT THE CORNER; THIS INCLUDES CORNERS AT DOORWAYS, PIERS, WALLS, ETC. 2. POSITION BARS TO HAVE 1 1/2' MIN. TO 2' MAX. CONCRETE COVER FROM TOP OF SLAB. 3. REINFORCING SHALL BE FRP REBAR. REINF. DETAIL ® SLAB RE-ENTRANT CORNER 5 NOT TO SCALE 5100 FILL & SEAL JOINTS IF REQ'D. SAWN CONTROL JOIM BY SPECS. OR NOTED ON PLANS 1.4 (TYP.) Luc Y N — � KEYED COLD JOINT _. �1:10(MIN.) Nao FCJ1 CONTROL JOINT LOCATED AT CONSTRUCTION JOINT FILL & SEAL JOINTS CONTROL 1 8' IF REQ'D BY SPECS. OR NOTED ON P5J S gEp1 1 4' SEAL (U.N.O. PREFORMED COMPRESSIBLE JOIM EXP. JNT. MAT. e SCJ SAWN CONTROL JOINT EJ EXPANSION JOINT NOTES (U.N.O.): 1. CRACK CONTROL JOINTS IN SLABS ON GRADE SHALL BE LOCATED PER THE ARCHITECT & AS SHOWN ON THE DRAWINGS. 2. ALL JOINTS SHALL BE LAID OUT IN APPROX. SQUARE PATTERN. 3. CONTROL JOINTS IN SIDEWALKS AND DRIVEWAYS ARE TO BE SPACED AT INTERVALS EQUAL TO THE WIDTH OF THE WALK OR DRIVEWAY (1 Of ox. MAX.). 4. EXPANSION JOINTS IN EXTERIOR SLABS ON GRADE SHALL BE LOCATED 60' c/c (±) MAX. E.W. 5. WHEREVER POSSIBLE, CONTROL JOINTS AND CONSTRUCTION JOINTS SHALL BE COINCIDENT. 6. CONTROL JOINTS MAY BE EITHER SAWN (WITHIN 4-12 HOURS OF FINAL SET) OR FORMED WITH PROPRIETARY INSERTS OR BULKHEAD STRIPS, SUBJECT TO APPROVAL OF ARCHITECT. DO NOT DELAY SAWING. 7. SAWN JOINTS SHALL BE 1/8' WIDE AND EXTEND TO 25% THE DEPTH OF THE SUB (I" MIN.) B. CONTROL JOINTS IN EXTERIOR SUBS WITH REINFORCEMENT SHALL HAVE SEALANT. 9. CONTROL JOINTS IN WASH -DOWN' AREAS SHALL HAVE SEALANT. 10. USE THESE TYP. SUB CONTROL JOINTS IN BLDG. AND EXTERIOR SUBS ON GRADE. 11. POUR SEPARATE 'SLAB POUR' AREAS IN ALTERNATING STRIP SEQUENCE 12. SUBMIT JOINT LAYOUTS TO ARCHITECT FOR APPROVAL 13. COORDINATE POUR AREAS AND JOINT LAYOUTS WITH OTHER TRADES. SLAB -ON -GRADE CRACK CONTROL AND EXPANSION JOINT DETAILS U.N.O 4 NOT TO SCALE s1DD FAI ENGINEERING R_ N y .Ci CZ O N >' �7 CT Y N CZ Eli � 3 y M CERTIFIED BY r>w1m G ' T N OV E f6 6yJ ` (1)111 O C M TO TO U LL ip G o r� rn o v C a 0 V �r� W o V I ~ 0 SHEET NO. S IM co