HomeMy WebLinkAboutM2.0- - - - - - - - - - - - - - - - - - - - - -
/{ /{............................/.../.............................................................................................../../.................................................................................�......./..{............ �i
1-7
f VAY z 01- 7
/ f f
/
--- . I
18 r 1800 j�-J' ---...
I
/ s !
-- -- • I IT
.-1 I '> VAV 2 19(El
T
_ y
13 1 a .. 1 18
14. --
41
r
. ....iVAV z 13TE1 i -'- (�10Y,y_------
______F_ I ��10"0 13 /
I I (E)12• i i I I 20 4 (E)18"0
T 15... -- --- - 4
� ^' _J 12"0 'T s VAV
\ - -- 2 19 /
- - T
I
Jt r
! I ! f -
I
I
s
s zo (TMP )
I s 9
_ I
I L-
I I _ I I I:
l ...1 . i... -- ,. ,
------ -------------------------------
(t\ �Y\ jt` �� TT
iVAL I 4 'P _I' Oj (IYFI H \ V a9 =
L°J\l
1JAI
_ t\ �,' (E)12'0 I \rI III
14______________________________________t__�___________YJ ' ___ hl
------ C- - ---_ -
T �T� T�
I I .
�w,� T vav 2-11fET _ l I 18"0
�
--------- ----- --� \ !/ //1 YAV
----------, j _ I _r� i i I I ---
V / !! Al I -� I -4 5 I ( 1 j l _I_ Vt I I
................. ...� T 7 ,y_•) 15 ILL
..................'---.. I
9 VA
T\
w /�%
011
B
(TYP.) 7 14 b' I I
f.._-. ... T I
j �� �'---� I I IT-- --------
-----------
15 I
\ \ L1 _ __ l7 T
(IYP.) 5 \ - -' 9 FIT - 6 \ \\ \ 10 i / 1 i e i i
IYO
I I I I \\/ 15 VAV 2-12 / / I �T ) 1
L' - -- % / --1'� J L 8 I—I
I I T -?T -T /
`x' I (E)1600 (E)1Z'0 '
(E)16'0 II // \ `•_.�__ LTTy1______________________________________ZTj__11
T, -
All
15 I•I I '�n III ' 6 I 1
-
i_________________________________________(E)14'0___________________
nYP)�rTJ Lr- r- r-
7 L r?- ri- r1, ri,' 10 GW
I I I I ___ I
' -I f'---' / \
DEMOLITION PLAN
1/4• - TIMID.
I I I
DEMOLITION GENERAL NOTES
1. THE ARCHITECTURAL DRAWINGS ARE TO BE USED ONLY AS A GUIDELINE FOR
DEMOLITION. THE CONTRACTOR MUST VISIT THE SITE PRIOR TO BIDDING TO VERIFY
ALL WORK REQUIRED FOR A COMPLETE JOB AND INCLUDE THE COST OF SUCH
WORK IN HIS BID.
2. THE MECHANICAL DRAWINGS ARE INTENDED TO SHOW ONLY THE GENERAL DUSTING
BUILDING CONSTRUCTION WITHIN THE ARFA OF DEMOLITION. THE DRAWINGS DO NOT
SHOW ALL SYSTEMS QUANTITIES SIZES OBSTRUCTIONS ETC., AND ARE NOT
INTENDED TO BE USED BY THE CONTRACTOR TO DEFINE THE COMPLETE SCOPE OF
DEMOLITION. THE CONTACTOR MUST FIELD VERIFY THE ACTUAL BUILDING AND
SYSTEMS CONDITIONS TO DEFINE ALL ELEMENTS WITHIN THE SCOPE OF DEMOLITION.
3. EXAMINE AREAS AND CONDITIONS UNDER WHICH DEMOLITION WORK MUST BE
PERFORMED. THIS CONIRACHDR SHALL COORDINATE HIS WORK NTH OTHER TRADES
PERFORMING DEMOLITION WORK AND/OR DEMOLITION WORK PERFORMED BY THE
OWNER. IN EVERY INSTANCE OF DEMOLITION AND/OR REMODELING, THE
CONTRACTOR SHALL FIGURE A COMPLETE JOB AS NONE OTHER SHALL BE
ACCEPTED.
4. THE EXTENT OF WORK SHOWN OR NOT SHOWN SHALL INCLUDE REMOVAL AND
LEGALLY DISPOSE OFF SITE, ALL THE ITEMS AND SYSTEMS BEING REMOVED,
5. THIS CONTRACTOR SHALL RETAIN ON THE PREMISES IN NEATLY STACKED PILES
WHERE INSTRUCTED FOR SELECTION BY THE OWNER ALL MATERIAL WIRE FIXTURIS
AND/OR EQUIPMENT WHICH ARE SPECIFIED TO BE REMOVED OR REPLACED. ALL
SUCH ITEMS, NOT SELECTED FOR SALVAGE BY THE OWNER, SHALL BECOME THE
PROPERTY OF THIS CONTRACTOR AND SHALL BE REMOVED FROM THE PREMISES
AND LEGALLY DISPOSED.
6. CONFORM TO ALL APPLICABLE CODES FOR DEMOLITION OF ITEMS AND Sf5TEMI
SATIETY OF ADJACENT SYSTEMS, DUST CONTROL LEGAL RUN-OFF CONTROL,
DISPOSAL AND ALL ITEMS NECESSARY TO COMPLETE THE WORK COMPLETELY.
7. DEMOLITION SHALL BE DONE IN A MANNER SO AS NOT TO DAMAGE ADJACENT
WORK AND NOT AFFECT THE OPERATION OF SYSTEMS TO REMAIN IN USE. ANY ITEM
TO REMAIN THAT IS DAMAGED BY THE CONTRACTOR SfWl BE REPLACED AND/OR
REPAIRED AT THE CONTRACTOR'S EXPENSE.
8. DEMOLITION AND CUTTING SHALL BE DONE IN A MANNER WHICH DOES NOT DEFORM
OR APPLY LOADS TO THE EXISTING FRAMING AND EQUIPMENT OF THE BUILDING TO
REMAIN.
9. ALL WALLS, CEILINGS, FLOORS, ETC., BEING DISTURBED BY THE WORK SHALL BE
RETURNED TO FINISHED CONDITIONS TO MATCH DUSTING BY THE CONTRACTOR AND
CONTRACTOR SHALL DO HIS OWN CUTTING AND PATCHING AS NECESSARY UNDER
HIS CONTRACT.
10. THE CONTRACTOR SHALL MAINTAIN EXISTING SERVICES TO AND IN THE EXISTING
AREA AS REQUIRED.
11. THE EXISTING SYSTEMS TO REMAIN ARE TO BE SUPPORTED AS REQUIRED UNTIL
THE MODIFIED ELEMENTS ARE INSTALLED AND SUPPORTED.
12. IF NECESSARY, THE CONTRACTOR SHALL PROVIDE TEMPORARY SERVICES IN THE
EXISTING AREAS.
13. EXISTING SLABS SHALL BE SAW -CUT IN A MANNER THAT DOES NOT CAUSE THE
STEEL FRAMING OR THE REBAR SUPPORTING THE SUB TO BE CUT. CONTRACTOR
SHALL FIELD VERIFY SUB THICKNESS AND REBAR SPACING.
14. EXISTING SUBS SHALL BE CORE DRILLED AT REENTRANT CORNERS OF NEW FLOOR
OPENINGS TO PREVENT OVER CUTTING.
15, THE ELECTRICAL CONTRACTOR SHALL DISCONNECT AND REMOVE ELECTRIC SERVICE
TO ALL MECHANICAL EQUIPMENT BEING REMOVED AS A RESULT OF THE
RENOVATION.
16. EQUIPMENT AND DEVICES SHALL BE REMOVED COMPLETE INCLUDING
HANGERS, SUPPORTS, CONTROLS, CONDUIT, WIRE, PIPES, DUCTWORK, EC. WIRING
SHALL BE DISCONNECTED AT CIRCUIT BREAKERS, REMOVED AND BREAKERS
MARKED SPARE.°
17. ALL OPEN ENDED PIPING AND DUCTWORK THAT IS TO REMAIN SHALL BE CAPPED
AND PROPERTY SECURED.
18. ANY EXISTING PIPES, DUCTWORK, CONDUIT, LOW VOLTAGE CONTROL, WIRING AND/OR
ELECTRICAL AND MECHANICAL DEVICES BEING DISTURBED BY THE WORK SHALL BE
REWORKED BY THIS CONTRACTOR AS REQUIRED TO RETURN TO ITS FORMER
EXISTING OPERATING CONDITION.
19. ANY PIPES OR DUCTWORK, OR CONTROL WIRING, OR TUBING FEEDING THROUGH
DEVICES OR EQUIPMENT BEING RELOCATE), REWORKED, OR ABANDONED AND
SERVING OTHER DEVICES, AND/OR EQUIPMENT SHALL BE MAINTAINED IN WORKING
CONDITION.
20. ANY ASBESTOS REMOVAL IF REQUIRED WILL BE HANDLED BY THE OWNER AND IS
NOT A PART OF THIS WORK.
21. EXISTING ARCHITECTURAL, MECHANICAL AND ELECTRICAL EQUIPMENT AND SYSTEMS
SHALL BE PROTECTED FROM DAMAGE RESULTING FROM DEMOLITION.
22. CONTRACTOR SHALL SUBMIT A PROPOSED DECONSTRUCTION SEQUENCE TO THE
OWNER AND ARCHITELT FOR REVIEW PRIOR TO COMMENCEMENT OF WORK.
23. CONTRACTOR SHALL PROTECT ALL EXISTING RETURN DUCTWORK AND TRANSFER AIR
OPENINGS WITH DISPOSABLE FILTERS DURING CONSTRUCTION. FILTERS SHALL BE OF
THE DISPOSABLE TYPE AND SHALL BE MERV 8. REPLACE EXISTING BUILDING
ROOFTOP UNIT FILTERS AFTER CONSTRUCTION IS COMPLETE
®CODED NOTES
1. EXISTING FAN -POWERED VAV BOX TO REMAIN.
2. EXISTING FAN -POWERED VAV BOX TO BE RELOCATED. REFER TO DRAWING M2.0 FOR
NEW LOCATION.
3. EXISTING FAN -POWERED VAV BOX THAT SERVES ADJACENT SPACE TO REMAIN.
4. EXISTING SUPPLY AIR DUCTWORK TO REMAIN.
5. REMOVED EXISTING SUPPLY AIR DIFFUSERS AND ALL ASSOCIATED BRANCH
DUCTWORK TO THE EXTENT SHOWN AND CAP AT MAIN.
6. REMOVE ALL EXISTING SUPPLY AIR DUCTWORK, DIFFUSERS, ETC. IN ITS ENTIRETY
DOWNSTREAM OF EXISTING VAV BOX.
7. REMOVE EXISTING RETURN AIR GRILLE.
8. EXISTING THERMOSTAT FOR VAV BOX TO BE RELOCATED. REFER TO DRAWING M2.0
FOR NEW LOCATION.
9. EXISTING THERMOSTAT FOR VAV BOX TO REMAIN.
10. REMOVE EXISTING SUPPLY AIR DUCTWORK AND DIFFUSERS TO THE EXTENT SHOWN.
CAP EXISTING MAN ABOVE ADJACENT TENANT.
11. EXISTING THERMOSTAT TO BE RELOCATED INTO ADJACENT TENANT SPACE. FIELD
VERIFY WHERE CORRESPONDING VAV IS LOCATED AND CDORDINATE FINAL LOCATION
WITH ADJACENT TENANT.
12. NO WORK IN THIS AREA
13. REMOVE EXISTING CW, HW, SANRARY AND VENT STUBS THRU EXISTING WALL AT
THIS LOCATION AND CAP AT MAINS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO
ANY WORK
14. REMOVE EXISTING SINK AND EYE WASH IN ITS ENTIRETY. CAP EXISTING CW, HW,
SANITARY AND VENT PIPING AT MAINS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO
ANY WORK
15. REMOVE EXISTING SINK IN ITS ENTIRETY. CAP EXISTING CW, HW, SANITARY AND
VENT PIPING AT MAINS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO ANY WORK.
16. REMOVE ALL EXISTING PLUMBING INCLUDING FLOOR DRAIN IN THIS AREA. CAP
EXISTING CW, HW, SANITARY AND VENT AT MAINS. FIELD VERIFY EXISTING
CONDITIONS PRIOR TO ANY WORK.
17. REMOVE EXISTING EXHAUST FAN IN ITS ENTIRETY, INCLUDING ALL ASSOCIATED
DUCTWORK AND CONTROLS. CAP AT EXHAUST MAIN. FIELD VERIFY EXISTING
CONDITIONS PRIOR TO ANY WORK.
18. REMOVE EXISTING PIPING AT THIS LOCATION AND CAP AT MAINS. FIELD VERIFY
EXISTING CONDITIONS PRIOR TO ANY WORK.
19. EXISTING 1" CW SHUT-OFF VALVE ABOVE CEUNG TO REMAIN.
20. EXISTING EXHAUST DUCT TO REMAIN.
0 0
a
W
m
-
come
a y
�Op
r00
0
woe?
`mn
Q
mom
�m ro
wUw
Q=
D
m
nnyl eY ofinervic Cww1Y w
Isl1 a el eerrlee we hen M
wellAwOe remw, one p,own ea of
wrleelne we
b dwernmaw
W N tlr m ft B,Ye,s,le
b WPw Mw tl,w b werale PNn
Rene edconsentconsentYI w.mwr nsernt *I :euw1
Araasae wnnan ewane.
e OY C.ek, •re.11e0i.
V
a
N
UU
I-
T
U)
O
W
~
J
Z
a
I
J
W
W
MM
O
KO
U_
2
n
<
T
a
z
1-
IL
.
J
J
Z
w
Z
as
TN
O
F
R
N
A@M M 9M4
Dan BK /NIX
Del. re
010-90I ® i 19tIT
RELEASED FOR CONSTRUCTION
Subject to compliance with all regulations
of State and Local Codes
City of Cannel
DATE: 10/16/19
MM