Loading...
HomeMy WebLinkAbout19090203 Building Plans1 MICHAELIS CORPORATION CONSTRUCT. RENOVATE. RESTORE. 2601 East 56th Street Indianapolis IN 46220 (317) 251-1935 P (317) 251-2599 F 1-844-FIX-INDY Client: Larry Wesner Property: 800 E 104th St Indianapolis, IN 46280 Operator: RJRMICHA Estimator: Rick Michaelis Jr. Business: (317) 601-0902 Company: Michaelis Corporation Business: 2601 East 56th Street Indianapolis, IN 46220 Type of Estimate: Vehicle Damaged Property Date Entered: 7/15/2019 Date Assigned: Price List: ININ8X_JUL19 Labor Efficiency: Restoration/Service/Remodel Estimate: 19-2003RR 10/15/19 William Hohlt 2 MICHAELIS CORPORATION CONSTRUCT. RENOVATE. RESTORE. 2601 East 56th Street Indianapolis IN 46220 (317) 251-1935 P (317) 251-2599 F 1-844-FIX-INDY 19-2003RR 9/13/2019 Page: 2 19-2003RR 19-2003RR DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Taxes, insurance, permits & fees (Bid 1.00 EA AS INCURRED Item) Dumpster load - Approx. 40 yards, 7-8 1.00 EA 700.00 0.00 0.00 140.00 840.00 tons of debris Job-site cargo/storage container - 20' 2.00 MO 0.00 87.83 0.00 35.14 210.80 long - per month ***To be set at end of driveway so homeowner can access contents. Job-site cargo container - pick up/del. 2.00 EA 0.00 99.40 13.92 42.54 255.26 (each way) 16'-40' Content Manipulation charge - per hour 12.00 HR By Customer ***Labor to pack out garage and garage attic into and out of an onsite pod. Header - double 2" x 10" 20.00 LF 0.00 7.15 5.01 29.60 177.61 ***Below line items are to create temporary interior garage beam to remove and replace TMP wall and damaged load bearing wall. Temporary shoring post - Screw jack 6.00 DA 0.00 30.98 0.00 37.18 223.06 (per day) Carpenter - General Framer - per hour 16.00 HR 0.00 54.51 0.00 174.44 1,046.60 Total: 19-2003RR 18.93 458.90 2,753.33 Main Level Main Level DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Header - double 2" x 10" 12.00 LF 0.00 7.15 3.01 17.76 106.57 ***Garage door header is split. 2" x 4" x 20' #2 & better Fir / Larch 3.00 EA 0.00 10.58 2.22 6.78 40.74 (material only) 2" x 2" x 8' #2 & better Fir / Larch 14.00 EA 0.00 2.16 2.12 6.46 38.82 (material only) 2" x 4" x 104 5/8" pre-cut stud (for 9' 26.00 EA 0.00 4.30 7.83 23.92 143.55 wall, mat only) Sheathing - OSB - 1/2" 255.44 SF 0.00 1.08 6.62 56.50 339.00 Labor to frame 2" x 4" load bearing 331.77 SF 0.00 1.12 0.46 74.42 446.46 wall - 16" oc ***Load bearing General Demolition - per hour 16.00 HR 37.80 0.00 0.00 120.96 725.76 Total: Main Level 22.26 306.80 1,840.90 10/15/19 William Hohlt 3 MICHAELIS CORPORATION CONSTRUCT. RENOVATE. RESTORE. 2601 East 56th Street Indianapolis IN 46220 (317) 251-1935 P (317) 251-2599 F 1-844-FIX-INDY 19-2003RR 9/13/2019 Page: 3 Garage2' 6"16' 2" 16' 6" 1' 2"9' 2' 7" 2' 11" 2' 8" 3'19' 6"20' 2"2' 6" 11' 1" 11' 5"Garage Height: 8' 540.00 SF Walls 817.88 SF Walls & Ceiling 30.88 SY Flooring 67.50 LF Ceil. Perimeter 277.88 SF Ceiling 277.88 SF Floor 67.50 LF Floor Perimeter DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL 1/2" drywall - hung, taped, floated, 569.94 SF 0.00 1.99 17.55 230.36 1,382.09 ready for paint Seal/prime then paint the surface area 569.94 SF 0.00 0.82 6.38 94.76 568.49 (2 coats) Paint the surface area - one coat 281.16 SF 0.00 0.56 2.17 31.94 191.56 Water softener - Detach & reset 1.00 EA By Customer Detach & Reset Fluorescent light 2.00 EA By Customer fixture Remove & Replace Casing - 3 1/4" 29.00 LF 0.39 2.19 2.92 15.54 93.28 Overhead door & hardware - 9' x 7' 1.00 EA 0.00 686.53 35.98 144.50 867.01 (Install) Overhead (garage) door opener 1.00 EA 0.00 129.25 0.00 25.86 155.11 ***Homeowner will purchase opener. Paint overhead door - 2 coats (per side) 1.00 EA 0.00 101.77 2.50 20.86 125.13 Electrician - per hour 4.00 HR 0.00 88.02 0.00 70.42 422.50 110 volt copper wiring run, box and 2.00 EA 0.00 58.84 1.54 23.84 143.06 outlet ***Add two additional outlets. Remove & Replace 110 volt copper 2.00 EA 4.05 72.53 3.39 31.32 187.87 wiring run, box and double outlet ***Change two existing outlets to double outlets. Paint casing - two coats 29.00 LF 0.00 1.23 0.22 7.18 43.07 Remove Pegboard 30.00 SF 0.23 0.00 0.00 1.38 8.28 (Install) Pegboard 30.00 SF 0.00 1.21 0.00 7.26 43.56 Vinyl window, horizontal sliding, 12- 1.00 EA By Customer 23 sf Add on for grid (double or triple glazed 13.00 SF By Customer windows) Add on for obscure glass 13.00 SF By Customer Remove & Replace Ceiling hook 8.00 EA By Customer 10/15/19 William Hohlt 4 MICHAELIS CORPORATION CONSTRUCT. RENOVATE. RESTORE. 2601 East 56th Street Indianapolis IN 46220 (317) 251-1935 P (317) 251-2599 F 1-844-FIX-INDY 19-2003RR 9/13/2019 Page: 4 CONTINUED - Garage DESCRIPTION QTY REMOVE REPLACE TOTALTAX O&P RESET Totals: Garage 72.65 705.22 4,231.01 Total: Main Level 94.91 1,012.02 6,071.91 Exterior DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Storm door assembly 1.00 EA 0.00 219.78 10.64 46.08 276.50 (Material Only) Limestone veneer 353.49 SF 0.00 23.13 176.43 1,670.52 10,023.17 ***Mason has found existing stone is no longer available and would cost $17,000 to manufacture. He thinks 2" cut limestone, after painted, will blend well. He has been quoted at $6,000 for material only, that will still need a small bevel cut. Will meet with homeowner to make sure the stone is agreeable and follow up with full labor + Material pricing. Masonry (Labor) 1.00 EA OPEN ITEM ***Labor cost can not e determined as labor hours are not defined. Mason will need to grind each stone on the top and bottom edge to create the bevel. Paint brick 353.49 SF 0.00 0.73 6.93 53.00 317.98 Light bulb - Halogen spot/flood 2.00 EA By Customer (PAR30) - mat. only Motion sensor for exterior light fixture 2.00 EA By Customer Exterior light fixture 2.00 EA By Customer Fascia - metal - 4" 15.00 LF 0.00 3.26 1.17 10.02 60.09 Gutter / downspout - aluminum - 6" 16.00 LF By Customer Totals: Exterior 195.17 1,779.62 10,677.74 Siding DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Soffit & fascia - metal - 2' overhang 25.00 LF 0.00 11.76 10.05 60.82 364.87 Attic vent - gable end - vinyl 1.00 EA 0.00 106.21 5.14 22.26 133.61 Remove & Replace Vinyl J trim 8.00 LF 0.79 2.44 0.30 5.22 31.36 Siding - vinyl 8.00 SF 0.00 3.00 0.76 4.96 29.72 Vinyl outside corner post 4.00 LF 0.00 4.19 0.54 3.46 20.76 Totals: Siding 16.79 96.72 580.32 10/15/19 William Hohlt 5 MICHAELIS CORPORATION CONSTRUCT. RENOVATE. RESTORE. 2601 East 56th Street Indianapolis IN 46220 (317) 251-1935 P (317) 251-2599 F 1-844-FIX-INDY 19-2003RR 9/13/2019 Page: 5 Labor Minimums Applied DESCRIPTION QTY RESET REMOVE REPLACE TAX O&P TOTAL Door labor minimum 1.00 EA 0.00 73.40 0.00 14.68 88.08 Totals: Labor Minimums Applied 0.00 14.68 88.08 Line Item Totals: 19-2003RR 325.80 3,361.94 20,171.38 Grand Total Areas: 540.00 SF Walls 277.88 SF Ceiling SF Walls and Ceiling817.88 277.88 SF Floor 30.88 SY Flooring 67.50 LF Floor Perimeter 0.00 SF Long Wall 0.00 SF Short Wall 67.50 LF Ceil. Perimeter 277.88 Floor Area 300.82 Total Area 540.00 Interior Wall Area 631.50 Exterior Wall Area 70.17 Exterior Perimeter of Walls 0.00 Surface Area 0.00 Number of Squares 0.00 Total Perimeter Length 0.00 Total Ridge Length 0.00 Total Hip Length 10/15/19 William Hohlt 6 MICHAELIS CORPORATION CONSTRUCT. RENOVATE. RESTORE. 2601 East 56th Street Indianapolis IN 46220 (317) 251-1935 P (317) 251-2599 F 1-844-FIX-INDY 19-2003RR 9/13/2019 Page: 6 Summary Line Item Total 16,483.64 Material Sales Tax 311.88 Storage Tax 13.92 Subtotal 16,809.44 Overhead 1,680.97 Profit 1,680.97 Replacement Cost Value $20,171.38 Net Claim $20,171.38 Rick Michaelis Jr. 10/15/19 William Hohlt