HomeMy WebLinkAboutMinutes PC 08-20-19 you asked for is included.
Brad: Referring to the architecture commitment listed under 3b. What's the height requirement for the four-sided
masonry wainscoting? Does it have to come up to the sill of the first floor windows? Jon Dobosiewicz: There's not a
minimum height specified in the commitments. Alexia: It doesn't have a specific height but it states up to the sill of the
lowest window. Jon Dobosiewicz: We can specify this under Section 1.A2 the height can be defined by the height on
the front elevation.
Nick: Can we get a commitment for the landscaping on the lots I mentioned?Since they are not considered a corner lot,
but you will see the sides of the house. Jon Dobosiewicz: Are you asking, "Will we apply the additional landscape
requirements to Lot 1?" Nick: Lots 1, 8, 39,and 9 and on lot 28 the rear should be landscaped since it faces the park.
Jon Dobosiewicz: We can add additional foundation plantings to lots 1, 8,9,39,and 28.
A Motion made by Josh and seconded by Laura to suspend the Rules of Procedure to vote on Docket No. 19070005
V and 19070006 V. Approved 7-0,absent Westermeier,Kegley
A Motion made by Nick and seconded by Laura to approve Docket Nos. 19070005-6 V, 19050020 Z, 19050021 PP,
and 19070022 V. Approved 6-1,Potasnik,absent Westermeier,Kegley
Old Business:
1. Docket No. 19050013 DP/ADLS: Napleton Kia of Carmel.
The applicant seeks site plan and design approval for a new auto dealership on 3.74 acres. The building will be
24,351 sq. ft.,about 28'tall,and will have 201 parking spaces provided.The site is located on 96th Street and east
of Randall Drive(with access from Randall Drive). The site is zoned B3/Business and is not located within any
overlay zone. Filed by Jim Shinaver and Jon Dobosiewicz of Nelson&Frankenberger on behalf of Napleton of
Cannel Imports,LLC dba Napleton Kia of Carmel.
Petitioner: Jim Shinaver
• We received unanimous favorable recommendation from the Commercial Committee
• Presented aerial location map, building elevations, and a site plan, access will only be provided off of Randall
• All roof-top mechanicals will be screened from view
• The Conditions of approval that were suggested are final Engineering approval of offsite mitigation plans,work
with Staff on the final location of sidewalk connection to 96th Street,and provide additional tree protection along
the creek
Department Report: Rachel Keesling:
• Off-site mitigation is very important for this site. We will not issue building permits until the off-site mitigation
is completed. The south end of King of Glory church(106th&Keystone)will contain the off-site mitigation
• We recommend you approve this with the conditions listed by the Petitioner
Committee Comments:
Brad: Where's the site of the dumpster enclosure. Jim Shinaver: Northeast of the site. Tab 5 includes the details.
Brad: Where's the location of the"No Test Driving Sign"? Jim Shinaver: The petitioner has agreed to include one by
the exit of the access drive, shown in Tab 8. Josh: Is this sign in compliance? Jim Shinaver: Staff is in support of it.
A Motion made by Josh and seconded by Alan to approve Docket No. 19050013 DP/ADLS.
Approved 7-0,Absent Westermeier,Kegley
Meeting adjourned at 10:56 p.m.