Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Elevations 10-15-19
OIL T.O. ScreenWall + 36'-6" East Elevation T.O. Precast T.O. Precast + 30'-6' T.O. Window + 24'-8' Future Floor i� T.O. ScreenWall + 36'-6" West Elevation 10) (9 ) (8 ) (7 ) (6 ) (5 ) (4 ) (3 ) (2 ) (1 CSO (A" 1 A�PcO P R O P E R T I E S .O. Precast + 30'-6' io .O. Window + 24'-8' uture Floor + 14'-0' .O. Window + 10'-8' inish Floor + 0'-0" T.O. Precast + 30'-6' + L4 -6 Future Floor T.O. Precast + 33'-0' T.O. Precast + 30'-6' Future Floor + 14'-0' T.O. Window + 10'-8' Finish Floor + 0'-0" MATERIALS KEY: 1 Pre -Cast Concrete Panel With Reveals (Color: Light Grey) 2 Pre -Cast Concrete Panel With Reveals (Color: Medium Grey) 3 Pre -Cast Concrete with Embedded Brick (Color: Medium Red) 4 1" Insulated Gray Tinted Law-E Glazing (Vision), in Clear Anodized Aluminum Frame S Aluminum Coping (Color: Medium Grey) 6 Metal Cornice/Trellis Detail (Color: Clear Anodized) 7 Painted Metal Overhead Door (Color: To Match Light Grey Concrete) 8 Opaque Metal Mechanical Screenwall (Color: Light Grey) 9 Insulated Metal Panel (Color: To Match Storefront) GENERAL NOTES: A Screenwall To Fully Obscurve View of Rooftop Mechanical Units B Potential Signage Location, Option 1 C Potential Signage Location, Option 2 Exterior Elevations 0' 10, 20' 40' Lakeside R&D Carmel, IN 1 15 October 2019