Loading...
HomeMy WebLinkAboutC102 STORMWATER POLLUTION PREVENTION PLAN PHASE 3EWWWWWEEEEEEEDDDD DD D D D DDDDDDDDDSDSDSDSDSFSFSFSFSD SD SD SFSFSFEEEE EE E E E EEECCCCCEEEEE E E E E E E E E E E E E E E E EEEEEEEEEEG C C C CCC C C D D D D D D D D D DD D DDDDDDDDDDDDDDDDDDDDDDD SDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDS D S D S D S D S D S D S D S D S D SDS D SDSDSDSDSDIP E E E E E EEEFOEEEEEEEEEEEEEEEEEECCCCC C C C C C C C C EE E E E E E E E G G G G G G G GDDDDDDDDDD D D D D D DDDDDDDDDDDDDDDDDDD SDSDSDSDSDSDSFSFSFSDSDSFSDSDSDSDSDSD SF SF SF SF SFSFSFSFSDSDSDSD IP CONTACT PERSON FOR EROSION CONTROL & SEDIMENT PRACTICES WEIHE ENGINEERS, INC. 10505 N. COLLEGE AVE. INDIANAPOLIS, IN 46268 TELEPHONE: (317) 846-6611 FAX: (317) 843-0546 EMAIL: PARKERF@WEIHE.NET CONTACT PERSON: FRED PARKER, CPESC -WARNING- THIS PLAN TO BE USED FOR EROSION CONTROL PURPOSES ONLY. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED IN THE FIELD BY THE INSPECTOR. -NOTE- THIS PLAN INDICATES EROSION CONTROL MEASURES REQUIRED AFTER SOIL STRIPPING AND PAD BUILDING HAS TAKEN PLACE. COORDINATE WITH DEVELOPER FOR MEASURES REQUIRED UNTIL PROPERTY TURNED OVER FOR DEVELOPMENT. COORDINATE WITH SOIL CONSERVATION DISTRICT REPRESENTATIVE FOR ANY OTHER MEASURES REQUIRED DUE TO SITE CONDITIONS. DISTURBED ACREAGE = 1.36± AC. C102STORMWATER POLLUTION PREVENTION PLAN PHASE 3W180233-C101 swppp2LINE TYPES UNDERGROUND GAS UNDERGROUND WATER AERIAL ELECTRIC UNDERGROUND ELECTRIC UNDERGROUND COMMUNICATIONS AERIAL COMMUNICATIONS OVERHEAD UTILITY FORCE MAIN RIGHT OF WAY LINE CHAIN LINK FENCE BOARD FENCE WROUGHT IRON FENCE GUARD RAIL HAND RAIL SILT FENCE BUILDING SETBACK LINE BOUNDARY LINE FLOW LINE G G G W W E(A)E(A) E E E C C C C(A)C(A) OHU OHU FM FM SF SF AERIAL FIBER OPTIC CABLEFO(A)FO(A) SECTION LINE FARM FENCE UNDERGROUND FIBER OPTICFOFO INDEX CONTOUR INTERMEDIATE CONTOUR SANITARY SEWER STORM SEWER EROSION CONTROL NOTES 1.ALL DISTURBED AREAS SHALL BE SODDED OR SEEDED, EXCEPT BUILDING PAD AND LANDSCAPE BEDS. SEE LANDSCAPE PLANS FOR LOCATION OF LANDSCAPE BEDS. 2.INSTALL SILT FENCE ALONG ALL DOWNSTREAM SLOPES. SILT FENCE TO FOLLOW CONTOUR. 3.THERE SHALL BE NO DIRT, DEBRIS OR STORAGE OF MATERIAL IN THE STREET. EROSION CONTROL SPECIFICATIONS 1.THIS PLAN IS DESIGNED AS AN ATTEMPT TO PREVENT ANY AND ALL SEDIMENT FROM LEAVING THE CONSTRUCTION SITE BY WAY OF EROSION. IF EROSION OF SEDIMENT FROM THE SITE IS TAKING PLACE, THE CONTRACTOR AND/OR OWNER SHALL TAKE PREVENTATIVE ACTION IMMEDIATELY. THE ENGINEER SHALL BE CONSULTED IN THE EVENT THIS HAPPENS. 2.TEMPORARY SEEDING IS TO BE APPLIED TO ANY DISTURBED AREA THAT WILL REMAIN UNALTERED IN EXCESS OF 15 DAYS. 3.PERMANENT SEEDING IS TO BE APPLIED IMMEDIATELY TO AREAS THAT HAVE ACHIEVED FINAL AND FINISHED GRADE. 4.PRESERVE EXISTING VEGETATION ON THE SITE WHENEVER AND WHEREVER POSSIBLE TO PREVENT TOPSOIL EROSION. 5.ALL SEDIMENT CAPTURING MEASURES SHALL BE IMPLEMENTED PRIOR TO THE DISTURBANCE OF THE CONSTRUCTION AREA THEY ARE INTENDED TO SERVICE. ALL EROSION CONTROL MEASURES PROPOSED ARE TO BE PROPERLY MAINTAINED TO CONTINUE THEIR EFFECTIVENESS. 6.IF GRADING OCCURS DURING THE MONTHS OF DECEMBER, JANUARY OR FEBRUARY DORMANT SEEDING PROCEDURES SHALL BE USED. 7.DURING DRY WEATHER, KEEP LAWNS WATERED WITH SPRINKLERS OR OTHER APPROVED METHODS. RESEED ANY AREAS NOT GERMINATING OR DAMAGED AT INTERVALS AS MAY BE REQUIRED ACCORDING TO SEASONAL CONDITION AND/OR CONSTRUCTION ACTIVITY. WATER GRASS AND EXECUTE NECESSARY WEEDING UNTIL FULL STAND OF GRASS HAS BEEN OBTAINED. 8.THE IMPLEMENTATION AND MAINTENANCE OF THE EROSION CONTROL IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND/OR OWNER. 9.IT SHALL BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO MINIMIZE SEDIMENTATION (FROM ON-SITE CONSTRUCTION ACTIVITIES) FROM BEING DEPOSITED ONTO ADJACENT PROPERTIES AND RECEIVING STREAMS/DITCHES IN STRICT COMPLIANCE WITH "RULE 5" (327 IAC 15-5, CONSTRUCTION ACTIVITY STORM WATER RUNOFF CONTROL). IT SHALL ALSO BE THE CONTRACTOR'S AND/OR OWNER'S RESPONSIBILITY TO OBTAIN ANY APPROVALS REQUIRED FROM THE LOCAL AUTHORITY AND TO SUBMIT A COMPLETE NOTICE OF INTENT LETTER TO THE OFFICE OF WATER MANAGEMENT, INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT PRIOR TO ANY CONSTRUCTION ACTIVITY. 10.FOR SEASONAL VARIATIONS - SEE SEASONAL SOIL PROTECTION CHART IN THESE PLANS. 11.PORTABLE TOILETS MUST BE ANCHORED. 12.CONTRACTOR TO USE EXISTING PAVEMENT FOR CONSTRUCTION ENTRANCE.REVISIONS AND ISSUESPart of the SE/4 of Section 28, Township 18 North, Range 4 East, Clay Township, Hamilton County, IndianaW18.0233PREPARED FOR:12900 HAZEL DELL PARKWAYPROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W18.0233DATEBY06.11.2019MLTDATE:RLWKnow what's below. before you dig.Call R APPROVAL PENDINGNOT FOR CONSTRUCTIONNORTHVIEW CHURCH PARKING ADDITIONSW S N E ENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMRUSSELL L. WEBSTER II, PE No. 11900318RUSSELL L . W EBST E R I I PRO FESSION A L E N GINEERREG I S T ER E DIND I A N A PE11900318 STATE OF NO. ORIGINATING BENCHMARK - HCBR 141 HAMILTON COUNTY CONTROL DISK SET IN SOUTH END OF WEST HANDRAIL OF RIVER ROAD BRIDGE OVER VERSTAL DITCH. ELEVATION: 754.43 NAVD 1988 TEMPORARY BENCHMARK - CUT BOX CUT BOX ON THE WEST SIDE OF A LIGHT POLE NEAR THE NORTHWEST CORNER OF THE SURVEYED PARCEL. ELEVATION: 813.06 NAVD 1988 BENCHMARK INFORMATION A PART OF THE SOUTHEAST QUARTER OF SECTION TWENTY-EIGHT (28), TOWNSHIP EIGHTEEN (18) NORTH, RANGE FOUR (4) EAST, IN HAMILTON COUNTY, INDIANA, DESCRIBED AS FOLLOWS: BEGINNING AT THE NORTHEAST CORNER OF THE SOUTHEAST QUARTER (1/4) OF SECTION TWENTY-EIGHT (28), TOWNSHIP EIGHTEEN (18) NORTH, RANGE FOUR (4) EAST; RUNNING THENCE SOUTH ON THE EAST LINE OF SAID QUARTER SECTION NINETEEN HUNDRED AND TWO (1902.0) FEET; THENCE WEST EIGHTEEN HUNDRED FIFTY-NINE AND SEVEN TENTHS (1859.7) FEET; THENCE NORTH NINETEEN HUNDRED AND TEN (1910.0) FEET TO THE NORTH LINE OF SAID QUARTER SECTION; THENCE EAST ON THE NORTH LINE OF SAID QUARTER SECTION EIGHTEEN HUNDRED SEVENTY-TWO AND EIGHT TENTHS (1872.8) FEET TO THE PLACE OF BEGINNING, CONTAINING EIGHTY-ONE AND SIXTY-SIX HUNDREDTHS (81.66) ACRES, MORE OR LESS. LAND DESCRIPTION (PER INSTRUMENT #8515410) SWPPP PHASE 3 LEGEND - INLET PROTECTION - USE SUBSURFACE INLET PROTECTION WITH OVERFLOW CAPABILITY (DANDY SAC) - PERMANENT/TEMPORARY SEEDING USE PLANTING CHART - SILT FENCE - INSTALL STRAW WATTLES (GRASS AREA) OR SILT DIKES (PAVEMENT AREA) AS SHOWN. CONTRACTOR TO ADD ADDITIONAL MEASURES AS CONSTRUCTION PHASING AND SITE CONDITIONS DICTATE - LIMITS OF DISTURBANCE (CONSTRUCTION LIMITS) SD IP SF D