HomeMy WebLinkAboutC105 SWPPP DETAILSSILT FENCE INLET PROTECTION INSTALLATION 1.DIG AN EIGHT-INCH DEEP, FOUR-INCH WIDE TRENCH AROUND THE PERIMETER OF THE INLET. 2.IF USING PRE-ASSEMBLED GEOTEXTILE FABRIC AND POSTS, DRIVE THE POSTS INTO THE SOIL, TIGHTLY STRETCHING THE GEOTEXTILE FABRIC BETWEEN POSTS AS EACH IS DRIVEN. (POSTS MUST BE PLACED ON THE INLET SIDE OF THE ANCHOR TRENCH WITH THE GEOTEXTILE FABRIC ON THE SIDE OF THE TRENCH FARTHEST FROM THE INLET.) NOTE:IF ASSEMBLING THE GEOTEXTILE FABRIC AND POSTS ON-SITE, DRIVE THE POSTS INTO THE SOIL AND THEN SECURE THE GEOTEXTILE FABRIC TO THE POSTS BY PLACING A PIECE OF LATHE OVER THE FABRIC AND FASTENING IT TO THE POST (STRETCHING THE FABRIC BETWEEN POSTS AS IT IS FASTENED). 3.USE THE WRAP JOIN METHOD WHEN JOINING POSTS. 4.PLACE THE BOTTOM 12 INCHES OF GEOTEXTILE FABRIC INTO THE EIGHT-INCH DEEP TRENCH, LAYING THE REMAINING FOUR INCHES IN THE BOTTOM OF THE TRENCH AND EXTENDING AWAY FROM THE INLET. 5.BACKFILL THE TRENCH WITH SOIL MATERIAL AND COMPACT IT IN PLACE. 6.BRACE THE POSTS BY NAILING BRACES INTO EACH CORNER POST OR UTILIZE RIGID PANELS TO SUPPORT FABRIC. NOTE: IN SITUATIONS WHERE STORM WATER MAY BYPASS THE STRUCTURE, EITHER: SET THE TOP OF THE GEOTEXTILE FABRIC FILTER AT LEAST SIX INCHES LOWER THAN THE GROUND ELEVATION ON THE DOWN-SLOPE SIDE OF THE STORM DRAIN INLET, BUILD A TEMPORARY DIKE, COMPACTED TO SIX INCHES HIGHER THAN THE FABRIC, ON THE DOWN-SLOPE SIDE OF THE STORM DRAIN INLET, AND/OR USE IN CONJUNCTION WITH EXCAVATED DROP INLET PROTECTION. MAINTENANCE _ INSPECT DAILY. _ INSPECT GEOTEXTILE FABRIC AND MAKE NEEDED REPAIRS IMMEDIATELY. _ REMOVE SEDIMENT FROM POOL AREA TO PROVIDE STORAGE FOR THE NEXT STORM EVENT. AVOID DAMAGING OR UNDERCUTTING FABRIC DURING SEDIMENT REMOVAL. _ WHEN CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE SEDIMENT, PROPERLY DISPOSE OF ALL CONSTRUCTION MATERIAL, GRADE AREA TO THE ELEVATION OF THE STORM DRAIN INLET TOP, THEN STABILIZE IMMEDIATELY. REFERENCED IN CHAPTER 7 PAGE 153-157 IN THE INDIANA STORM WATER QUALITY MANUAL. SECURELY FASTEN OVERLAPPING ENDS OF SILT FENCE MATERIAL TO ADJACENT STAKES WITH THREE WIRE TIES OR OTHER FASTENERS ATTACH THE WOVEN WIRE FENCE TO EACH POST WITH THREE WIRE TIES OR OTHER FASTENERS SILT FENCE MATERIAL TO BE FASTENED SECURELY TO WOVEN WIRE FENCE WITH THREE TIES SPACED AT 3" ON CENTER 4"x8" TRENCH C105SWPPP DETAILSW180233-C103 swppp detFOR NON PAVED AREAS (NO SCALE) POSTS: 2 X 4 WOODEN STAKE FENCE: WOVEN WIRE, 14-1/2 GA., 6" MAX. MESH OPENING FABRIC: IN ACCORDANCE WITH ASTM D 6461 LATEST EDITION. GEOTEXTILE FABRIC LAID ON DOWN-SLOPE SIDE AND BOTTOM OF TRENCH EXTEND WIRE FENCE A MIN. OF 8" INTO GROUND WOVEN WIRE FENCE WITH SILT FENCE MATERIAL COVER CROSS BRACE 1"x2" or 1"x3" 36" MAX. (TYP.) DROP INLET WITH GRATE 12"MIN.18"MAX.2"x2" OR 2"X4" WOOD FRAME 2"x2" or 2"x4" STAKE 5' MIN. OVERLAP REVISIONS AND ISSUESPart of the SE/4 of Section 28, Township 18 North, Range 4 East, Clay Township, Hamilton County, IndianaW18.0233PREPARED FOR:12900 HAZEL DELL PARKWAYPROJECT NO. SHEET NO.CHECKED BY:DRAWN BY:RLWDESIGNED BY:DWG NAME:PROJECT NO.:W18.0233DATEBY06.11.2019MLTDATE:RLWKnow what's below. before you dig.Call R APPROVAL PENDINGNOT FOR CONSTRUCTIONNORTHVIEW CHURCH PARKING ADDITIONSENGINEERS317 | 846 - 6611800 | 452 - 6408317 | 843 - 0546 faxWEIHELand Surveying | Civil EngineeringLandscape ArchitectureALLAN H. WEIHE, P.E., L.S. - FOUNDER10505 N. College AvenueIndianapolis, Indiana 46280weihe.netBuild with confidence.SMRUSSELL L. WEBSTER II, PE No. 11900318RUSSELL L . W EBST E R I I PRO FESSION A L E N GINEERREG I S T ER E DIND I A N A PE11900318 STATE OF NO. APRON ON THIS SIDE OF THE DIKE SHALL BE FOLDED UNDER THE DIKE SECTION 20" AND GLUED DOWN CONSTRUCTION AREA SECTION A-A DIKE PLAN VIEW APRON ADHESIVE FLOW ADHESIVE 20"20"ADHESIVEADHESIVEADHESIVE ADHESIVE NOTES 1. INSTALLED SILT DIKE UNIT SHALL HAVE CONTINUOUS AND FIRM CONTACT WITH PAVEMENT. 2. ADHESIVES SHALL BE LIQUID NAIL OR APPROVED EQUAL FOR CONCRETE PAVEMENT APPLICATIONS AND EMULSIFIED ASPHALT FOR ASPHALT APPLICATIONS. ADHESIVE SHALL BE PLACED WHERE THE UNITS OVERLAP AND A 20" STRIP ALONG BOTH EDGES. FLOW OVERLAP PER MANUFACTURER'S RECOMMENDATIONS SILT DIKE (ON EXISTING PAVEMENT) (NO SCALE) EXISTING CONCRETE OR ASPHALT PAVEMENT MAINTENANCE 1) AFTER EACH STORM EVENT AND AT WEEKLY INTERVALS, INSPECT THE SILT DIKES AND LEVEL OF SEDIMENT PRESENT UPSTREAM OF THE DIKE. 2) IF THE SEDIMENT IS 1/2 THE HEIGHT OF THE DIKE, REMOVE SEDIMENT AND DISPOSE OF IN AN APPROVED LOCATION. 4) INSPECT DIKE TO ENSURE STORMWATER FLOW IS NOT FLOWING AROUND OR UNDER THE DIKE. 5) REPLACE SATURATED OR REPAIR TORN OR DAMAGED DIKES AS REQUIRED. INSTALLATION 1) INSTALL SILT DIKE PER THE PLAN LOCATIONS. 2) INSTALL DIKE ON PAVEMENT SURFACE PER MANUFACTURERS RECOMMENDATIONS AND INSURE GOOD CONTACT WITH THE ASPHALT SURFACE WITH NO VOIDS UNDER FABRIC.